Registered Litigation declared Residential / Group Housing project

PIER 23

By HOOR CONSTRUCTIONS

RG-MH-51724 · RERA P51900009360 · Last updated on MahaRERA portal: 23 Oct 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 1 complaint at MahaRERA
  • Completion date moved by 82 months, 4 of them under MahaRERA's automatic 4-month extension
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Apr 2031Possession promisedmoved 82 months from the original
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 4%
1Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

PIER 23 is a Residential / Group Housing project by HOOR CONSTRUCTIONS in MUMBAI, 400010, registered with MahaRERA as P51900009360 on 22 Aug 2017. Possession is promised by 30 Apr 2031. The completion date has moved by 82 months from the original filing, 4 of them under MahaRERA's automatic 4-month extension for the West Asia conflict. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePIER 23
  • TypeResidential / Group Housing
  • Location
    • DLIMA STREET
    • MUMBAI
    • 400010
  • Pincode400010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900009360
  • ReraGenie IDRG-MH-51724

Builder

  • NameHOOR CONSTRUCTIONS
  • Entity typePartnership
  • PartnerNISAR AHMED PATEL

Key dates

this monthRegisteredAug 2017First promiseJun 2024Revised toApr 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion30 Apr 2031
  • Revised completionRevised to 30 Apr 2031 (originally 30 Jun 2024)
  • Buildings2 building records
  • Documents filed52 files

Current status

1.9%Work done, per cost certificate

Figures as on 23 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA170000
WING BNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 4%.

WING A0%
ActivityProgress
Excavation4%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed125

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots125
Closed/Covered125
BuildingClosed/CoveredTotal
WING A4141
WING B8484

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,253 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI9087.75
Proposed, not sanctioned4,791 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDR NAIR ROAD OPP MUMBAI CENTRAL STATION MUMBAI - 400 008
Estimated costRs 70.92 cr
Cost incurredRs 1.35 cr
Work done1.9%
BuildingWingEstimatedIncurred
WING BNARs 38.07 crRs 1.14 lakh
WING ANARs 22.84 crRs 93,528
-NARs 10.00 crRs 1.33 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBNSA
ArchitectOCEAN DESIGNS
EngineerHanware Consultants
EngineerShahid Hasnain Shaikh
EngineerZZ CONSULTANTS
Chartered AccountantZMHS & ASSOCIATES
Chartered AccountantJRSM & ASSOCIATES
Chartered AccountantB N BHADRICHA & CO
PartnerRole in project
HOOR CONSTRUCTIONS-

Extensions2

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Dec 2030 → Apr 2031

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

EA20072621803Jun 2024 → Dec 2030

Reason as filed by the promoter"Due to delays in obtaining the necessary approvals from the concerned Government authorities, arising from regulatory restrictions beyond our control, the project could not be completed within the stipulated timeline. We are therefore seeking an extension of the project registration period to enable us to complete the remaining work and obtain the Occupancy Certificate (OC) in compliance with all applicable regulations."

Litigation declared1

CaseCourtStatus
327/2017Small Causes CourtACTIVE

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000056062Abdur Rahim Mohamed HusainNisar Dudhwala10/09/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2031

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Arch Certificate 6804.pdf23 Oct 2026
Withdrawal Update Form 1File: Arch Certificate 6804.pdf23 Oct 2026
Withdrawal Update Form 1File: Arch Certificate 6804.pdf23 Oct 2026
Withdrawal Update Form 1File: Arch Certificate 6804.pdf23 Oct 2026
Withdrawal Update Form 1File: Arch Certificate 6804.pdf23 Oct 2026
Withdrawal Update Form 1File: Arch Certificate SEP26.pdf23 Oct 2026
Withdrawal Update Form 2File: Site Supervisor CertificateHoorPDF.pdf23 Oct 2026
Withdrawal Update Form 2File: Site Supervisor CertificateHoorPDF.pdf23 Oct 2026
Withdrawal Update Form 2File: Site Supervisor CertificateHoorPDF.pdf23 Oct 2026
Withdrawal Update Form 2File: Site Supervisor CertificateHoorPDF.pdf23 Oct 2026
Withdrawal Update Form 2File: Site Supervisor CertificateHoorPDF.pdf23 Oct 2026
Withdrawal Update Form 2File: ENG CERT SEP26.pdf23 Oct 2026
Withdrawal Update Form 3File: Form-3-1.pdf23 Oct 2026
Withdrawal Update Form 3File: Form-3-1.pdf23 Oct 2026
Withdrawal Update Form 3File: Form-3-1.pdf23 Oct 2026
Withdrawal Update Form 3File: Form-3-1.pdf23 Oct 2026
Withdrawal Update Form 3File: Form-3-1.pdf23 Oct 2026
Withdrawal Update Form 3File: Form-3SEP26.pdf23 Oct 2026
Form 2A (FY 2024-2025)File: Form 2A (24-25).pdf22 Oct 2026
Form 2A (FY 2025-2026)File: Form 2A (25-26).pdf22 Oct 2026
Form 5 (FY 2025-2026)File: Form-5.pdf22 Oct 2026
Form 2A (FY 2023-2024)File: 2A hoor.pdf10 Aug 2026
Form 5 (FY 2024-2025)File: Form-5 (Annual Report on Statement of Accounts).pdf10 Aug 2026
Form 1File: Architects Certificate - hoor.pdf23 Jul 2026
Form 2File: Hoor Eng Certificate RERA.pdf23 Jul 2026
Form 3File: form 3 hoor.pdf23 Jul 2026
Disclosure of Sold and Booked InventoryFile: Resolution Format-B.pdf23 Jul 2026
Annual Audit Report of Statutory CA (Form 5)File: FORM5_Hoor Construction_Page_1.pdf15 Aug 2019
Annual Audit Report of Statutory CA (Form 5)File: FORM5_Hoor Construction_Page_2.pdf15 Aug 2019
Proforma of Allotment letterFile: Annx-1.pdf20 Mar 2018
Proforma of Allotment letterFile: Anx2.pdf20 Mar 2018
Proforma of Allotment letterFile: Annx3.pdf20 Mar 2018
Proforma of Allotment letterFile: Annx4.pdf20 Mar 2018
Proforma of Allotment letterFile: Annx5.pdf20 Mar 2018
Proforma of Allotment letterFile: Annx6.pdf20 Mar 2018
Proforma of Allotment letterFile: Annx7.pdf20 Mar 2018
Proforma of Allotment letterFile: Agreement for Sale_Quay Garden.pdf14 Mar 2018
Proforma of Allotment letterFile: QUAY GARDEN FINAL ALLOTMENT LETTER.pdf21 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate13112017.pdf28 Nov 2017
Building plan approvalFile: IOD.pdf31 Jul 2017
Layout approvalFile: Layout Plan Dockyard.pdf31 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE_Sag7.pdf31 Jul 2017
Details of encumbrancesFile: Dec-Non Encumb.PDF31 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan Dockyard.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf31 Jul 2017
Declaration in FORM BFile: form b doc.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: the quay garden architect cert.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT FORM 2 DOCKYARD.pdf31 Jul 2017
Certificates of CA (Form 3)File: FINAL CA CERT.pdf31 Jul 2017
Proforma of Allotment letterFile: Dec-Allotment.PDF31 Jul 2017
OtherFile: HOOR C.pdf31 Jul 2017
PAN CardFile: Hoor PAN.pdf30 Jul 2017

Keep PIER 23 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBAI

2 kmPIER 23Completed 2Lapsed / revoked 10Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: HOOR CONSTRUCTIONS

HOOR CONSTRUCTIONS has 1 registration on MahaRERA, including PIER 23. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if PIER 23 is delayed beyond 30 Apr 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PIER 23?

The registered promoter entity is HOOR CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PIER 23?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PIER 23?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PIER 23?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PIER 23?

The professionals named in the filing: Architect: BNSA; Architect: OCEAN DESIGNS; Engineer: Hanware Consultants; Engineer: Shahid Hasnain Shaikh; Engineer: ZZ CONSULTANTS; Chartered Accountant: ZMHS & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PIER 23?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PIER 23. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PIER 23 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.