Completed No litigation declared Residential / Group Housing project

PGD PINNACLE - A WING

By PGD Land LLP

RG-MH-16042 · RERA P52100024896 · Last updated on MahaRERA portal: 21 Oct 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

PGD PINNACLE - A WING is a Residential / Group Housing project by PGD Land LLP in Pune, Maharashtra, registered with MahaRERA as P52100024896 on 9 Mar 2020. The registration is recorded completed; possession was promised by 30 Sep 2023.

At a glance

Project

  • NamePGD PINNACLE - A WING
  • TypeResidential / Group Housing
  • Location
    • 24 MTR D P ROAD
    • KESHAVNAGAR
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024896
  • ReraGenie IDRG-MH-16042

Builder

  • NamePGD Land LLP
  • Entity typePartnership
  • GSTIN27AAOFP9798C1ZG
  • PartnersJaysinh Ambaprasad Dave, Devang Harshad Dave, MAULIK HARSHAD DAVE
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredMar 2020PromisedSep 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Mar 2020
  • Promised completion30 Sep 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

A WING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Closed/Covered42
Open Space16

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area405 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SONIA YOGESH ANANDPune (CB)Pune

Approvals and building plan

Permissible FSI3550.37
Proposed, not sanctioned3,550 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHATKOPAR EAST MUMBAI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMALWADKAR ARCHITECT
EngineerSHARAD WABALE
Chartered AccountantHAY &ASSOCIATES
Chartered AccountantSamyak FoFalia
PartnerRole in project
PGD Land LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009393Sep 2023 → Mar 2024

Reason as filed by the promoterDue to this covid - 19 pandemic situation project will be delay. Following reasons also effect on project duration - 1. Labour shortage due to migration. 2. sanctioning process also delayed due to concern offices are closed 3. Shortage of material due to production not going on.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Mar 2024

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: PGD Land LLP Form 5 F Y 2023-24.PDF21 Oct 2024
Status of ConveyanceFile: Letter_to_Maha_RERA 08102024.PDF8 Oct 2024
Status of ConveyanceFile: NOTICE TO SOCIETY 07052024.pdf13 Aug 2024
Status of ConveyanceFile: COMMUNICATION WITH SOCIETY.pdf13 Aug 2024
Status of ConveyanceFile: Deed_of_Conveyance__Combined FINAL 25122023.pdf13 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC CLUB HOUSE.pdf9 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Quality Assurance Certificate F Y 2019-20.pdf17 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Quality Assurance Certificate F Y 2020-21.pdf17 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Quality Assurance Certificate F Y 2021-22.pdf17 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Quality Assurance Certificate F Y 2022-23.pdf17 Jan 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 ARCHITECT PROJECT COMPLETION CERTIFICATE A BLDG.pdf17 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: A BLDG SOCIETY REGISTRATION CERTIFICATE.pdf9 Jan 2024
OtherFile: A BLDG SOCIETY REGISTRATION CERTIFICATE.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: PGD Land LLP_Form_5 F Y 2022-23.PDF30 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC A BUILDING.pdf22 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: WORK COMPLETION CERT 100 16092023 A BLDG.pdf22 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10TH RERA ARCHITECT CERTIFICATE 30062023.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10TH RERA ENGINEER CERTIFICATE A BLDG 30062023.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10TH CA Certificate A Building 30062023 BELOW 1 MB.pdf19 Jul 2023
OtherFile: 10 Disclosure of Sold Booked Inventory 30062023.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9TH RERA ARCHITECT CERTIFICATE 31032023 1 MB.pdf29 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9TH RERA ENGINEER CERTIFICATE A BLDG 31032023 1 MB.pdf29 Apr 2023
Disclosure of sold/ booked inventoryFile: 09 Disclosure of Sold Booked Inventory 31032023.pdf29 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9TH CA Certificate A Building 31032023 1 MB.pdf29 Apr 2023
OtherFile: 09 Disclosure of Sold Booked Inventory 31032023.pdf29 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA FORM 5 AUDIT REPORT F Y 2019-20.pdf27 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8TH RERA ARCHITECT CERTIFICATE 02032023_compressed.pdf9 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8TH RERAENGINEER CERTIFICATE A BLDG 02032023_compressed.pdf9 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8TH CA Certificate A Building 02032023_compressed-1.pdf9 Mar 2023
OtherFile: 08 Disclosure of Sold Booked Inventory Dtd 02032023.pdf9 Mar 2023
OtherFile: A BLDG NAME RESERVATION LETTER.pdf24 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7TH RERA ARCHITECT CERTIFICATE 20122022.pdf5 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7TH RERAENGINEER CERTIFICATE A BLDG 31122022.pdf5 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7TH CA Certificate A Building 31122022 below 1 mb.pdf5 Jan 2023
OtherFile: 07 Disclosure of Sold Booked Inventory Dtd 31122022.PDF5 Jan 2023
Layout approvalFile: 1-1_11zon.pdf31 Dec 2022
Layout approvalFile: 1-4_11zon.pdf31 Dec 2022
Layout approvalFile: 2-4_11zon.pdf31 Dec 2022
Layout approvalFile: 3-4_11zon.pdf31 Dec 2022
Layout approvalFile: 4-4_11zon.pdf31 Dec 2022
Copy of Layout Approval (in case of layout)File: 1-1_11zon.pdf31 Dec 2022
Copy of Layout Approval (in case of layout)File: 1-4_11zon.pdf31 Dec 2022
Copy of Layout Approval (in case of layout)File: 2-4_11zon.pdf31 Dec 2022
Copy of Layout Approval (in case of layout)File: 3-4_11zon.pdf31 Dec 2022
Copy of Layout Approval (in case of layout)File: 4-4_11zon.pdf31 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: ANNEXURE - H CC NEW 19122022_11zon.pdf31 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6TH RERA ARCHITECT CERTIFICATE 30092022 1 mb.pdf21 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6TH RERAENGINEER CERTIFICATE A BLDG 30092022 1 mb.pdf21 Oct 2022
Disclosure of sold/ booked inventoryFile: 06 Disclosure of Sold Booked Inventory 30092022.PDF21 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6TH CA Certificate A Building 30092022 1 mb.pdf21 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: PGD Land LLP_Form_5 F Y 2021-22.pdf18 Oct 2022
OtherFile: 26_100_TO_70_TRF_LETTER_10102022.PDF18 Oct 2022
OtherFile: 27_70_TO_CURRENT_TRF_LETTER_10102022-1.PDF18 Oct 2022
OtherFile: 22 100_TO_70_TRF_LETTER_10082022.PDF20 Aug 2022
OtherFile: 23_70_TO_CURRENT_TRF_LETTER_10082022.PDF20 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5TH RERA ARCHITECT CERTIFICATE 30062022.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5TH RERAENGINEER CERTIFICATE A BLDG 30062022_compressed.pdf20 Jul 2022
Disclosure of sold/ booked inventoryFile: 5 - Disclosure of Sold Booked Inventory 30062022.pdf20 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5TH CA Certificate A Building 30062022 compressed.pdf20 Jul 2022
OtherFile: 5 - Disclosure of Sold Booked Inventory 30062022.pdf20 Jul 2022
CERSAI detailsFile: CERSAI_REPORT_PGD.pdf3 May 2022
OtherFile: letter to kotak 100_To_70_TRF_LETTER_02052022.PDF3 May 2022
OtherFile: letter to kotak 70_To_CURRENT_TRF_LETTER_02052022.PDF3 May 2022
OtherFile: Letter_to_Kotak_Dt_02_May_2022.PDF3 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4TH RERA ARCHITECT CERTIFICATE 31032022.pdf23 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4TH RERAENGINEER CERTIFICATE A BLDG 31032022-compressed.pdf23 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4TH CA Certificate A Building 31032022 compressed.pdf23 Apr 2022
OtherFile: 04TH Disclosure of Sold Booked Inventory 31032022.PDF23 Apr 2022
OtherFile: Letter_to_Kotak_Dt_27_Jan_2022.pdf15 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3rd CA Certificate A Building 31122021 BELOW 1 MB.pdf24 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3RD RERA ARCHITECT CERTIFICATE A BLDG.pdf11 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1.PDF11 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3RD RERAENGINEER CERTIFICATE A BLDG- BELOW 1 MB.pdf11 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2.PDF11 Jan 2022
OtherFile: LETTER TO MAHARERA.pdf7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: MAHARERA FORM 5 For annual report of CA F Y 2020-21.pdf31 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2ND RERA ARCHITECT CERTIFICATE A BLDG-compressed.pdf22 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2ND RERA ENGG CERTIFICATE - A BLDG-compressed.pdf22 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2ND RERA CA CERTIFICATE A BLDG 08092021-compressed.pdf22 Sep 2021
Building plan approvalFile: NEW PLAN A BLDG 19032021 A BLDG.pdf23 Mar 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PGD PINNACLE - A WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KESHAVNAGAR13,700+ in Pune

2 kmPGD PINNACLE - A WINGCompleted 115Lapsed / revoked 117Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: PGD Land LLP

PGD Land LLP has 2 registrations on MahaRERA, including PGD Pinnacle and PGD PINNACLE - A WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PGD PINNACLE - A WING is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PGD PINNACLE - A WING?

The registered promoter entity is PGD Land LLP, a partnership as per the filing. Its GSTIN 27AAOFP9798C1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PGD PINNACLE - A WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PGD PINNACLE - A WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PGD PINNACLE - A WING?

The professionals named in the filing: Architect: MALWADKAR ARCHITECT; Engineer: SHARAD WABALE; Chartered Accountant: HAY &ASSOCIATES; Chartered Accountant: Samyak FoFalia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PGD PINNACLE - A WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PGD PINNACLE - A WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PGD PINNACLE - A WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.