Registered No litigation declared Residential / Group Housing project

PG ASHWIN

By PLATINUM PRIDE

RG-MH-23391 · RERA P52100078703 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
18 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

PG ASHWIN is a Residential / Group Housing project by PLATINUM PRIDE in Pune, Maharashtra, registered with MahaRERA as P52100078703 on 7 Jan 2025. Possession is promised by 30 Jun 2027. 0 of the 18 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NamePG ASHWIN
  • TypeResidential / Group Housing
  • Location
    • LULLA NAGAR
    • LULLANAGAR PUNE
    • Munjeri
    • Haveli
    • Pune
    • 411040
  • Pincode411040
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078703
  • ReraGenie IDRG-MH-23391

Builder

  • NamePLATINUM PRIDE
  • Entity typePartnership
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJan 2025PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jan 2025
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

0%0 of 18 units booked
54.1%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PG ASHWINNA7718018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

PG ASHWIN: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area586 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Jul 2025
LandownerVillageDistrict
ASHWIN MEMORIES CO-OPERATIVE HOUSING SOCIETY LTDMunjeriPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI3421.67
Proposed, not sanctioned1,310 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch266B BHAWANI PETH TIMBER MARKET PUNE MAHARASHTRA PIN CODE 411042
Estimated costRs 5.34 cr
Cost incurredRs 2.89 cr
Work done54.07%
BuildingWingEstimatedIncurred
PG ASHWINNARs 5.34 crRs 2.89 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAY AERAM
EngineerMAHESH VHANAMANE
EngineerRAHUL MUTHA
Chartered AccountantSiddhant Bora
Chartered AccountantSPCM AND ASSOCIATES
PartnerRole in project
PLATINUM PRIDE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Platinum Pride.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1 Platinum Pride.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 Platinum Pride.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 Platinum Pride.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 Platinum Pride.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 Platinum Pride.pdf24 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A Platinum Pride.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf23 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf23 Jan 2026
Withdrawal Update Form 3File: Signed form 3.pdf23 Jan 2026
Form 1File: Form 1.pdf16 Dec 2025
Form 2File: FORM 2.pdf16 Dec 2025
Form 3File: SIGNED FORM 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: UNSOLD INVENTORY PLATINUM PRIDE.pdf16 Dec 2025
Form 5 (FY 2024-2025)File: PP Signed form 5.pdf21 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf20 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf20 Nov 2025
Withdrawal Update Form 3File: Form 3 PP-Final.pdf20 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf28 Jul 2025
Withdrawal Update Form 2File: FORM 2.pdf28 Jul 2025
Withdrawal Update Form 3File: SIGNED FORM 3 PLATINUM PRIDE.pdf28 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf24 Jul 2025
Withdrawal Update Form 2File: FORM 2.pdf24 Jul 2025
Withdrawal Update Form 3File: SIGNED FORM 3.pdf24 Jul 2025
Layout approvalFile: PLAN 01.pdf2 May 2025
Building plan approvalFile: PLAN 02.pdf2 May 2025
Building plan approvalFile: PLAN 03.pdf2 May 2025
Copy of Layout Approval (in case of layout)File: PLAN 01.pdf2 May 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf2 May 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN 02.pdf2 May 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN 03.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY PLATINUM PRIDE.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY PLATINUM PRIDE.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED (3)_compressed.pdf27 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Declaration about all RERA Designated Bank Accounts (Format A) (1).pdf27 Dec 2024
Other - FinanceFile: DECLARATION FOR BANK ACCOUNT final.pdf27 Dec 2024
Other - FinanceFile: DECLARATION FOR FLAT ALLOTMENT TO LAND OWNER.pdf23 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory.pdf13 Dec 2024
Copy of the legal title reportFile: legal title report platinum pride.pdf16 Nov 2024
Details of encumbrances concerned to FinanceFile: NO ENCRUMBRANCE CERTIFICATE - FINANCE.pdf16 Nov 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE CERTIFICATE - LEGAL.pdf16 Nov 2024
Other - LegalFile: Annexure A Declaration for One Building.pdf16 Nov 2024
Declaration about Commencement CertificateFile: DECLARATION FOR COMMENCEMENT (1).pdf16 Nov 2024
CERSAI detailsFile: DECLARATION FOR CERSAI.pdf16 Nov 2024
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT AL.pdf16 Nov 2024
Details of encumbrances concerned to LegalFile: NO ENCRUMBRANCE CERTIFICATE - FINANCE.pdf16 Nov 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE CERTIFICATE - LEGAL.pdf16 Nov 2024
Other - FinanceFile: Annexure A Declaration for One Building.pdf16 Nov 2024
Other - TechnicalFile: Annexure A Declaration for One Building.pdf16 Nov 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT Ashwin Memories.pdf16 Nov 2024
Proforma of Agreement for saleFile: AGREEMENT 16 11 24.pdf16 Nov 2024
Proforma of Allotment letterFile: Allotment Letter.pdf14 Nov 2024
CERSAI detailsFile: CERSAI Search Report.pdf12 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Bank Declaration.pdf12 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured and Unsecured Finance.pdf12 Nov 2024
Building plan approvalFile: PMC Plan Page2-1374-24 DT 21-08-2024-compressed.pdf16 Oct 2024
Layout approvalFile: PMC Plan Page1-1374-24 DT 21-08-2024-compressed.pdf16 Oct 2024
PAN CardFile: 1 Pan card Platinum Pride.pdf16 Oct 2024
Details of encumbrances concerned to FinanceFile: 4 Legal Encumbrance Certificate.pdf16 Oct 2024
Copy of Layout Approval (in case of layout)File: PMC Plan Page1-1374-24 DT 21-08-2024-compressed.pdf16 Oct 2024
Declaration in FORM BFile: 8 Form B Promoter.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2.pdf16 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-1374-24 DT 21-08-2024_compressed.pdf16 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 6 1 VERIFICATION EMAIL.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: PMC Plan Page2-1374-24 DT 21-08-2024-compressed.pdf16 Oct 2024
Details of encumbrances concerned to LegalFile: 4 Legal Encumbrance Certificate.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ADVEEK BORA.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANAND PARMAR.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DHIRAJ PARMAR.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: KETAN GUNDECHA.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RYAAN SURPURIYA.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SHRIPAL OSWAL.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 11 Form 2A.pdf16 Oct 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PG ASHWIN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LULLANAGAR PUNE13,700+ in Pune

2 kmPG ASHWINCompleted 28Lapsed / revoked 26Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 108 registered projects within 2 km.

Builder: PLATINUM PRIDE

PLATINUM PRIDE has 2 registrations on MahaRERA, including KAMAL KUNJ and PG ASHWIN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PG ASHWIN is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PG ASHWIN?

The registered promoter entity is PLATINUM PRIDE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PG ASHWIN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PG ASHWIN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PG ASHWIN?

The professionals named in the filing: Architect: JAY AERAM; Engineer: MAHESH VHANAMANE; Engineer: RAHUL MUTHA; Chartered Accountant: Siddhant Bora; Chartered Accountant: SPCM AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PG ASHWIN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PG ASHWIN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PG ASHWIN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.