Home / Browse projects / Mumbai Suburban, Maharashtra / PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III

De-registered No litigation declared Residential / Group Housing project

PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III

By GIRIRAJ ENTERPRISES

RG-MH-42830 · RERA P51800006592 · Last updated on MahaRERA portal: 9 Apr 2025

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 26 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2024Possession promised26 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III is a Residential / Group Housing project by GIRIRAJ ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006592 on 14 Aug 2017. Possession was promised by 1 Aug 2024 and is now 26 months past that date.

At a glance

Project

  • NamePEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III
  • TypeResidential / Group Housing
  • Location
    • J P Road
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006592
  • ReraGenie IDRG-MH-42830

Builder

  • NameGIRIRAJ ENTERPRISES
  • Entity typePartnership
  • GSTIN27AACFG7122M1ZA
  • PartnerPEARL JOSEPH PATTATHU
  • Other registrations5 more →
  • Completed5 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

26 months past promisethis monthRegisteredAug 2017PromisedAug 2024

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on14 Aug 2017
  • Promised completion1 Aug 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - IIINA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes10%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area520 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI1890.07
Proposed, not sanctioned1,890 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAILNA, SANTACRUZ EAST, MUMBAI - 400029

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Sanjay Joshi
ArchitectVastu Creations
EngineerSura & Associates
Chartered AccountantRANK & Associates
PartnerRole in project
GIRIRAJ ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate 02-04-2025.pdf9 Apr 2025
Certificates of CA (Form 3)File: Form 3_compressed.pdf9 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2_compressed.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold_as on 31-12-2024.pdf9 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM - 5_compressed.pdf9 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate dt 17-08-2024.pdf7 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2024.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate_Revised 28-06-23.pdf3 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Giriraj Engerprises FY 22-23.pdf19 Oct 2023
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf2 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Certificate 2017-18.PDF13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 CERTIFICATE 18-19.PDF13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 CERTIFICATE 19-20.PDF13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 CERTIFICATE 20-21.PDF13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 CERTIFICATE 21-22.PDF13 Apr 2023
Details of encumbrances concerned to FinanceFile: Non-Encumbrance Certificate legal.pdf12 Apr 2023
Details of encumbrances concerned to LegalFile: Non-Encumbrance Certificate legal.pdf12 Apr 2023
Declaration about Commencement CertificateFile: Format D - Declaration on CC.pdf12 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate_Revised.pdf12 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2020.pdf12 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2021.pdf12 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2022.pdf12 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2023.pdf12 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold unsold 31122022.pdf12 Apr 2023
CERSAI detailsFile: CERSAISearch Report.pdf12 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organizations.pdf12 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 31-12-2018 Ar Cert 1 FINAL - PHASE III.pdf3 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 31-03-2019 Ar Cert 1 FINAL - PHASE III.pdf3 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Er Cert fINAL - 31-12-2018.pdf2 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Er Cert fINAL - 31-03-2019.pdf2 Aug 2019
Certificates of CA (Form 3)File: 7 CA Certificate 31-12-2018.pdf2 Aug 2019
Certificates of CA (Form 3)File: 8 CA Certificate 31-03-2019.pdf2 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 30-09-2017 Ar Cert 1 FINAL - PHASE III.pdf3 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 31-12-2017 Ar Cert 1 FINAL - PHASE III.pdf3 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 31-03-2018 Ar Cert 1 FINAL - PHASE III.pdf3 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 31-03-2018 Ar Cert 1 FINAL - PHASE III.pdf3 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 30-06-2018 Ar Cert 1 FINAL - PHASE III.pdf3 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 30-09-2018 Ar Cert 1 FINAL - PHASE III.pdf3 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 30-09-2018 Ar Cert 1 FINAL - PHASE III.pdf3 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Er Cert fINAL - 30-09-2017.pdf3 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Er Cert fINAL - 31-12-2017.pdf3 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Er Cert fINAL - 31-03-2018.pdf3 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Er Cert fINAL - 30-06-2018.pdf3 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Er Cert fINAL - 30-09-2018.pdf3 Jan 2019
Certificates of CA (Form 3)File: 2 CA Certificate 30-09-2017.pdf3 Jan 2019
Certificates of CA (Form 3)File: 3 CA Certificate 31-12-2017.pdf3 Jan 2019
Certificates of CA (Form 3)File: 4 CA Certificate 31-03-2018.pdf3 Jan 2019
Certificates of CA (Form 3)File: 5 CA Certificate 30-06-2018.pdf3 Jan 2019
Certificates of CA (Form 3)File: 6 CA Certificate 30-09-2018.pdf3 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERTIFICATE 30-09-2017.pdf2 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERTIFICATE 31-12-2017.pdf2 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERTIFICATE 31-03-2018.pdf2 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERTIFICATE 30-06-2018.pdf2 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERTIFICATE 30-09-2018.pdf2 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 Eng Cert 30092018.pdf2 Jan 2019
Certificates of CA (Form 3)File: form 3 300917.pdf2 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-09-2017 Ar Cert 1 FINAL - PHASE III.pdf31 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-06-2018 Ar Cert 1 FINAL - PHASE III.pdf31 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-09-2018 Ar Cert 1 FINAL - PHASE III.pdf31 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Er Cert 3 fINAL - 31-12-2017.pdf31 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Er Cert 3 fINAL - 30-06-2018.pdf31 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Er Cert 3 fINAL - 30-09-2018.pdf31 Dec 2018
Certificates of CA (Form 3)File: form 3 311217.pdf31 Dec 2018
Certificates of CA (Form 3)File: form 3 300618.pdf31 Dec 2018
Certificates of CA (Form 3)File: form 3 300918.pdf31 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: CC PR FINAL.pdf9 Oct 2018
Building plan approvalFile: IOA_31072017.pdf31 Jul 2017
Layout approvalFile: Ground.pdf31 Jul 2017
Layout approvalFile: 3and4th Floor.pdf31 Jul 2017
Layout approvalFile: 5th Floor.pdf31 Jul 2017
Layout approvalFile: 1st Floor.pdf31 Jul 2017
Layout approvalFile: 2nd Floor.pdf31 Jul 2017
PAN CardFile: G-Pan.pdf31 Jul 2017
Copy of the legal title reportFile: Title search JK jurris.pdf31 Jul 2017
Details of encumbrancesFile: Encu.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Ground.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 1st Floor.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 2nd Floor.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 3and4th Floor.pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmPEARL RESIDENCY - WING-BCompleted 102Lapsed / revoked 61Other 75Dot size: filed unitsN

Filed coordinates, straight-line distance. 238 registered projects within 2 km.

Builder: GIRIRAJ ENTERPRISES

GIRIRAJ ENTERPRISES has 6 registrations on MahaRERA, including MALPANI SAFFRON BUILDING NO 2 and PEARL RESIDENCY - WING-A, RESIDENTIAL PHASE - I. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III is delayed beyond 1 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III?

The registered promoter entity is GIRIRAJ ENTERPRISES, a partnership as per the filing. Its GSTIN 27AACFG7122M1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III?

The professionals named in the filing: Architect: Ar. Sanjay Joshi; Architect: Vastu Creations; Engineer: Sura & Associates; Chartered Accountant: RANK & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.