Registration lapsed No litigation declared Residential / Group Housing project

PEARL RESIDENCY

By PUSHPA CONSTRUCTION CO

RG-MH-64972 · RERA P51900008616 · Last updated on MahaRERA portal: 27 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 42 months past the filed date
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Apr 2023Possession promised42 months past this date
4 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 90%
0Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

PEARL RESIDENCY is a Residential / Group Housing project by PUSHPA CONSTRUCTION CO in DHARAVI, 400017, registered with MahaRERA as P51900008616 on 19 Aug 2017. Possession was promised by 30 Apr 2023 and is now 42 months past that date. The completion date has moved by 30 months from the original filing.

At a glance

Project

  • NamePEARL RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • SION BANDRA LINK ROAD
    • DHARAVI
    • 400017
  • Pincode400017
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900008616
  • ReraGenie IDRG-MH-64972

Builder

  • NamePUSHPA CONSTRUCTION CO
  • Entity typePartnership
  • PartnersREENA ABHIJIT MEHTA, MADHAVI MANOHAR SHENDYE, MANISHA DNYANESHWAR PAWAR

Key dates

42 months past promisethis monthRegisteredAug 2017First promiseOct 2020Revised toApr 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion30 Apr 2023
  • Revised completionRevised to 30 Apr 2023 (originally 30 Oct 2020)
  • Buildings2 building records
  • Documents filed135 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PEARL RESIDENCY BLDG NO 1NA220000
BAJRANGBALI TRANSIT BLDG NO 3NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 90%.

PEARL RESIDENCY BLDG NO 130%
ActivityProgress
Excavation90%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor75%
Slabs of Super Structure1%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
BAJRANGBALI TRANSIT BLDG NO 350%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes15%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Open Space9

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,518 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI28669.88
Proposed, not sanctioned25,490 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRUPAM CENTRE CINE PLANET SION CIRCLE SION EAST MUMBAI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM R SHENDYE AND ASSOCIATES
EngineerEPICONS CONSULTANTS PVT LTD
PartnerRole in project
PUSHPA CONSTRUCTION CO-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900012577Oct 2020 → Apr 2023

Reason as filed by the promoterWe have completed all works of all 4 wings A,B,C & D upto 23rd floors and we have received part OCC upto 18th floors of all wings. For further OCC we have to completed RCC, parking towers for 105 car parks as per approved plan. Now we have completed RCC work of parking tower and handed over to installation mechanical car park to PARi, Car parking installation company. At present we have not sold any residential flats above 18th floors. Thus please grant us extension for project period upto 30.04.2023

EXT51900008401Oct 2020 → Oct 2021

Reason as filed by the promoterAS PER LETTER SUBMIITTED DATED 27/10/2020

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Nov 2024

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY FORMATION.pdf27 Dec 2024
Deviation Report with respect to Allotment letterFile: LETTER OF POSSESSION (1).pdf23 Nov 2024
Deviation Report with respect to model copy of AgreementFile: DRAFT AGREEMENT.pdf23 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Adobe Scan Oct 27, 2022.pdf12 Nov 2024
OtherFile: loan offer letter.pdf21 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFCATE.pdf10 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 ENGINEERS CERTIFICATE - PUSHPA 01 10 2022.pdf10 Oct 2022
Certificates of CA (Form 3)File: ca certifcate.pdf10 Oct 2022
OtherFile: LOAN OFFER LETTER.pdf10 Oct 2022
Certificates of CA (Form 3)File: RERA JUNE2022.pdf9 Jul 2022
Certificates of CA (Form 3)File: rera march_compressed (1).pdf8 Jul 2022
Disclosure of sold/ booked inventoryFile: sold unsold flat and shop.pdf4 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Site Supervisors Certificate.pdf27 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Site Supervisors Certificate.pdf27 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OCCUPATION.pdf27 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf9 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 ENGINEERS CERTIFICATE - PUSHPA.pdf9 Feb 2022
Certificates of CA (Form 3)File: CA CERTIFCATE.pdf9 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf1 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineer Certificate.pdf1 Oct 2021
Certificates of CA (Form 3)File: CA Certificate.pdf1 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf1 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 ENGINEERS CERTIFICATE.pdf1 Jul 2021
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf1 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf7 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 ENGINEERS CERTIFICATE.pdf7 Apr 2021
Certificates of CA (Form 3)File: C A CERTIFICATE.pdf7 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf2 Jan 2021
Certificates of CA (Form 3)File: ca certificate.pdf2 Jan 2021
Details of encumbrancesFile: img226_LETTER.pdf30 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: img227_CC.pdf30 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT.pdf1 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT_.pdf1 Jan 2020
Certificates of CA (Form 3)File: CA CERT_.pdf1 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect cert.pdf25 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer cert.pdf25 Oct 2019
Certificates of CA (Form 3)File: CA Certificate.pdf25 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: CC-compressed.pdf18 Jul 2019
OtherFile: REHAB SHOPS.pdf18 Jul 2019
OtherFile: AMENDED PLAN.pdf18 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: img869.pdf1 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf1 Jul 2019
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf1 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf4 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-compressed.pdf4 Apr 2019
Certificates of CA (Form 3)File: CA Certifcate.pdf4 Apr 2019
OtherFile: capri loan offer letter.pdf4 Apr 2019
OtherFile: Civil Aviation copy-compressed.pdf4 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: img691.pdf20 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: img6921.pdf20 Feb 2019
Certificates of CA (Form 3)File: img6901.pdf20 Feb 2019
Certificates of CA (Form 5)File: img549.pdf18 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: img461.pdf25 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: img446.pdf25 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: img447.pdf25 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Doc 2018.pdf25 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Doc 2018.pdf25 Oct 2018
Certificates of CA (Form 3)File: New Doc 2018.pdf25 Oct 2018
OtherFile: New Doc 2018.pdf25 Oct 2018
Proforma of Allotment letterFile: Draft Rera Agreement for sale Pushpa pear residency.pdf17 Nov 2017
Layout approvalFile: LAYOUT_PLAN (1).pdf31 Jul 2017
Building plan approvalFile: IOD PG8-PG17.pdf31 Jul 2017
Building plan approvalFile: IOD 7.pdf31 Jul 2017
Building plan approvalFile: IOD 6.pdf31 Jul 2017
Layout approvalFile: APPROVED_PLANS4 (2).pdf31 Jul 2017
Building plan approvalFile: APPROVED_PLANS8.pdf31 Jul 2017
Building plan approvalFile: APPROVED PLANS9.pdf31 Jul 2017
Building plan approvalFile: APPROVED PLANS PG1.pdf31 Jul 2017
Building plan approvalFile: APPROVED PLANS2.pdf31 Jul 2017
Building plan approvalFile: APPROVED PLANS3.pdf31 Jul 2017
Building plan approvalFile: APPROVED_PLANS4 (2).pdf31 Jul 2017
Building plan approvalFile: APPROVED PLANS5.pdf31 Jul 2017
Building plan approvalFile: APPROVED PLANS6.pdf31 Jul 2017
Building plan approvalFile: APPROVED PLANS7.pdf31 Jul 2017
Building plan approvalFile: APPROVED PLANS10.pdf31 Jul 2017
Building plan approvalFile: APPROVED_PLANS11.pdf31 Jul 2017
Building plan approvalFile: APPROVED PLANS12.pdf31 Jul 2017
Building plan approvalFile: APPROVED PLANS13.pdf31 Jul 2017
Building plan approvalFile: APPROVED_PLANS14.pdf31 Jul 2017
Building plan approvalFile: IOD 2.pdf31 Jul 2017

Keep PEARL RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHARAVI

2 kmPEARL RESIDENCYCompleted 1Lapsed / revoked 3Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: PUSHPA CONSTRUCTION CO

PUSHPA CONSTRUCTION CO has 1 registration on MahaRERA, including PEARL RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that PEARL RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PEARL RESIDENCY is delayed beyond 30 Apr 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PEARL RESIDENCY?

The registered promoter entity is PUSHPA CONSTRUCTION CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PEARL RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PEARL RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PEARL RESIDENCY?

The professionals named in the filing: Architect: M R SHENDYE AND ASSOCIATES; Engineer: EPICONS CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PEARL RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PEARL RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PEARL RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.