Home / Browse projects / SAMATA B SRA CHS LTD
SAMATA B SRA CHS LTD
RG-MH-10557 · RERA P51900003106 · Last updated on MahaRERA portal: 15 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Litigation declared, 6 cases
- Completion date moved by 66 months
- 3 extensions taken
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAMATA B SRA CHS LTD is a Residential / Group Housing project by NEETA BUILDERS in -, 400017, registered with MahaRERA as P51900003106 on 4 Aug 2017. Possession was promised by 13 Jun 2025 and is now 16 months past that date. The completion date has moved by 66 months from the original filing. 40 of the 52 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.
At a glance
Project
- NameSAMATA B SRA CHS LTD
- TypeResidential / Group Housing
- Location
- -
- 400017
- Pincode400017
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900003106
- ReraGenie IDRG-MH-10557
Builder
- NameNEETA BUILDERS
- Entity typePartnership
- PartnersDEVAKI GOVIND SHETTY, SANTOSH GOVIND SHETTY
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Aug 2017
- Promised completion13 Jun 2025
- Revised completionRevised to 13 Jun 2025 (originally 31 Dec 2019)
- Buildings2 building records
- Documents filed103 files
Current status
Figures as on 15 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 8 | 8 | 29 | 0 | 29 |
| WING B | NA | 6 | 6 | 22 | 1 | 23 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 15 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
WING A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING B | NA | Rs 4.23 cr | Rs 4.19 cr |
| WING A | NA | Rs 4.11 cr | Rs 4.11 cr |
| - | NA | Rs 43.89 lakh | Rs 13.41 lakh |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SIDDESH SAMANT AND ASSOCIATES |
| Architect | SIDDHESH SAMANT AND ASSOCIATES |
| Engineer | PARAS CONSULTANT |
| Engineer | Manish K Patil |
| Engineer | MS PARAS CONSULTANT |
| Chartered Accountant | D K Shetty And Associates |
| Chartered Accountant | Pratik D. Jain & Associates |
| Chartered Accountant | RSPH and Associates |
| Chartered Accountant | Vardhaman Bhandari |
| Partner | Role in project |
|---|---|
| NEETA BUILDERS | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1)DELAY IN DEMARCATION 2)DELAY IN PLINTH COMPETION AND FURTHER CC 3)SITE CONTRAINT 4)FINANCIAL PROBLEM
Reason as filed by the promoterDue to COVID-19 and the unavailability of labor, the construction activity got delayed.
Reason as filed by the promoterWe have obtained full occupancy certificate for the project from Slum Rehabilitation Authority, Brihanmumbai dated 13/06/2025. We are applying for post facto extension till the date of full occupancy certificate i.e., 13/06/2025.
Litigation declared6
| Case | Court | Status |
|---|---|---|
| 690/2014 | CITICIVIL | Closed |
| 3343/2013 | CITICIVIL | Closed |
| 3993/2013 | CITICIVIL | Closed |
| 2047/2011 | CITICIVIL | Closed |
| 252/2012 | CITICIVIL | Closed |
| 690/2014 | CITICIVIL | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed103
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: AR - june 25.pdf | 15 Dec 2025 |
| Withdrawal Update Form 2File: ER - june 25.pdf | 15 Dec 2025 |
| Withdrawal Update Form 3File: CA - June 25 final.pdf | 15 Dec 2025 |
| Form 1File: Architect Certificate - March 25.pdf | 13 Oct 2025 |
| Form 2File: Engineer Certificate - March 25.pdf | 13 Oct 2025 |
| Form 3File: CA Certificate Mar 25.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Mar 25.pdf | 13 Oct 2025 |
| Form 5 (FY 2020-2021)File: RERA Audit Report.pdf | 3 Oct 2025 |
| Form 5 (FY 2023-2024)File: RERA Audit Report 23-24.pdf | 3 Oct 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Neeta 22-23 2A.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Dec24 wing a.pdf | 26 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Wing B Dec 24.pdf | 26 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR certificate.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: CA certificate -Final_compressed.pdf | 18 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER certificate.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 23 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: edited_Form 5.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: Final CA Certificate Sept 24.pdf | 15 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: March 24.pdf | 2 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: June 24.pdf | 2 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form-2A.pdf | 2 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: archi certificate march.pdf | 31 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: archi certficate june.pdf | 31 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate_March 24 Final Signed copy (1).pdf | 31 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate June 24 Final signed copy.pdf | 31 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg certficate march.pdf | 31 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg cerificate june.pdf | 31 Dec 2024 |
| Certificates of CA (Form 3)File: CA Cert Jun 23.pdf | 30 Jul 2024 |
| Certificates of CA (Form 3)File: CA Cery Sep 23.pdf | 30 Jul 2024 |
| Certificates of CA (Form 3)File: CA Cert Dec 23.pdf | 30 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 12 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Audit 21-22 Signed Copy.pdf | 11 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit 22-23- Signed Copy.pdf | 11 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked.pdf | 31 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold.pdf | 31 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: ilovepdf_merged (3).pdf | 19 Apr 2023 |
| Other - TechnicalFile: ENGR CERT-NEETA STMT-4TH QRTR.pdf | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 6 Jan 2023 |
| Declaration about Commencement CertificateFile: Form D.pdf | 7 Mar 2022 |
| CERSAI detailsFile: CERSAI Report.pdf | 7 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 7 Mar 2022 |
| Certificates of CA (Form 3)File: CA Cert Signed.pdf | 7 Mar 2022 |
| Certificates of CA (Form 3)File: CA Certificate Upload This.pdf | 7 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Annual Report-2019-20- CA D K Shetty.pdf | 7 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Audit Report MH Ver 1.pdf | 7 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Audit 20-21 Upload This.pdf | 7 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch.pdf | 29 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arc.pdf | 29 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arc.pdf | 29 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arc.pdf | 29 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg.pdf | 29 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg.pdf | 29 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg.pdf | 29 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg.pdf | 29 Sep 2021 |
| Certificates of CA (Form 3)File: ca.pdf | 29 Sep 2021 |
| Certificates of CA (Form 3)File: ca.pdf | 29 Sep 2021 |
| Certificates of CA (Form 3)File: ca.pdf | 29 Sep 2021 |
| Certificates of CA (Form 3)File: arc.pdf | 29 Sep 2021 |
| Certificates of CA (Form 3)File: ca.pdf | 29 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC2NDPAGE.pdf | 23 Oct 2020 |
| OtherFile: AMENDED PLAN-1.pdf | 16 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCQ119-20.pdf | 22 Apr 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHQ219-20.pdf | 22 Apr 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCQ319-20.pdf | 22 Apr 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGQ119-20.pdf | 22 Apr 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGGQ219-20.pdf | 22 Apr 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGGQ319-20.pdf | 22 Apr 2020 |
| Certificates of CA (Form 3)File: Q1-19-20.pdf | 22 Apr 2020 |
| Certificates of CA (Form 3)File: Q2-19-20.pdf | 22 Apr 2020 |
| Certificates of CA (Form 3)File: Q3-19-20.pdf | 22 Apr 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA D K SHETTY 001 form no -5.pdf | 13 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Chartered Accountant Certificate_compressed (4).pdf | 13 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Samata_RERA_Q2_compressed.pdf | 13 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Samata_RERA_Q3_compressed.pdf | 13 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate ( Q- I)_compressed.pdf | 13 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate ( Q- II )_compressed.pdf | 13 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate ( Q- III )Compressed.pdf | 13 May 2019 |
| Certificates of CA (Form 3)File: Chartered Accountant Certificate_compressed (4).pdf | 13 May 2019 |
| Certificates of CA (Form 3)File: ca q2.pdf | 13 May 2019 |
| Certificates of CA (Form 3)File: caq3.pdf | 13 May 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| TAG | tagore sra chs ltd near tekda masjid anna nagar dharavi mumbai-400017 | 162 | Completed | Jan 2014 | Late, Jan 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 103 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAMATA B SRA CHS LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
BKC EDGE
Labdhi Bliss Private Limited
CRD Aura
CRD Blue Ocean LLP
PRINCE TOWER
Punith Buildtech Private Limited
F.W.TOWER
crystal construction corporation
AKASH
Kay Bee Developers Pvt. Ltd.
BAWA AASHIYAAN PHASE 1
KAY BEE DEVELOPERS PVT. LTD.
Builder: NEETA BUILDERS
NEETA BUILDERS has 1 registration on MahaRERA, including SAMATA B SRA CHS LTD. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.
Frequently asked questions
What does it mean that SAMATA B SRA CHS LTD shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAMATA B SRA CHS LTD is delayed beyond 13 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAMATA B SRA CHS LTD?
The registered promoter entity is NEETA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAMATA B SRA CHS LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAMATA B SRA CHS LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAMATA B SRA CHS LTD?
The professionals named in the filing: Architect: SIDDESH SAMANT AND ASSOCIATES; Architect: SIDDHESH SAMANT AND ASSOCIATES; Engineer: PARAS CONSULTANT; Engineer: Manish K Patil; Engineer: MS PARAS CONSULTANT; Chartered Accountant: D K Shetty And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAMATA B SRA CHS LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback