Home / Browse projects / PRINCE TOWER

Registration lapsed No litigation declared Residential / Group Housing project

PRINCE TOWER

By Punith Buildtech Private Limited

RG-MH-39716 · RERA P51900006933 · Last updated on MahaRERA portal: 27 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 30 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2025Possession promised16 months past this date
7 of 11Construction stages donefurthest along: Staircases, 98%
24 of 101Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

PRINCE TOWER is a Residential / Group Housing project by Punith Buildtech Private Limited in Dharavi, 400017, registered with MahaRERA as P51900006933 on 16 Aug 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 30 months from the original filing. 77 of the 101 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePRINCE TOWER
  • TypeResidential / Group Housing
  • Location
    • 90 Feet Road
    • Dharavi
    • 400017
  • Pincode400017
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900006933
  • ReraGenie IDRG-MH-39716

Builder

  • NamePunith Buildtech Private Limited
  • Entity typeCompany
  • PartnerPunitha Rajan

Key dates

16 months past promisethis monthRegisteredAug 2017First promiseDec 2022Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 Aug 2017
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed127 files

Current status

76%77 of 101 units booked

Figures as on 27 Feb 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRINCE TOWERNA25221010101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.

PRINCE TOWER: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 27 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes75%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered72

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,324 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jun 2025
LandownerVillageDistrict
JAYDEEP REALTYKurlaMumbai Suburban
Punit Construction Co.BorivaliMumbai Suburban

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI7288.56
Proposed, not sanctioned2,058 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch92 HEM PRAKASH GND FLR KAZI SYED ST MANDVI MUMBAI-400003

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJATIN BHUTA AND ASSOCIATES
Engineermuthu krishnan and associates
Chartered AccountantMANOJ SHARMA
PartnerRole in project
Punith Buildtech Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900011648Dec 2022 → Jun 2025

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 30-06-2025

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503358WILFRED KOILRAJ NADARPunith Buildtech Private Limited20/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf27 Feb 2025
Certificates of CA (Form 3)File: FORM 3-Q1 (1).pdf27 Feb 2025
Certificates of CA (Form 3)File: Form 3- Q3 (1).pdf27 Feb 2025
Certificates of CA (Form 3)File: Form 3 MArch (1).pdf19 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc Certificate.pdf18 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 Architect Certificate DEC23.pdf10 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 DEC 23.pdf10 Jan 2024
Certificates of CA (Form 3)File: Form 3 Dec 23.pdf10 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certifcate Sept.pdf28 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 Sept.pdf28 Nov 2023
Certificates of CA (Form 3)File: ca cert- form 3.pdf28 Nov 2023
Certificates of CA (Form 3)File: ca cert- form 3.pdf28 Nov 2023
Certificates of CA (Form 3)File: ca cert- form 3.pdf28 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer FORM 2.pdf15 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf26 Jul 2023
Certificates of CA (Form 3)File: form 3 Rera June 2023.pdf26 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form 1.pdf1 May 2023
Certificates of CA (Form 3)File: CA form 3.pdf21 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA FORM 5 21-22.pdf31 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineer Certificate for 2018 Punith Construction.PDF3 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineer Certificate for 2019 Punith Construction.PDF3 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineer's Certificate of 2020 for Punit Constn Co.PDF3 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineer's Certificate of 2021 for Punit Constn Co.PDF3 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - FY 2017-2018.pdf10 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -FY 2018-2019.pdf10 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -FY 2019-2020.pdf10 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - FY 2020-2021.pdf10 Feb 2023
Certificates of CA (Form 3)File: Form 3 for FY 2017-18.pdf8 Feb 2023
Certificates of CA (Form 3)File: Form 3 for FY 2019-20.pdf8 Feb 2023
Certificates of CA (Form 3)File: Form 3 for FY 2018-19.pdf8 Feb 2023
Certificates of CA (Form 3)File: form - 3 27-01-2023.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 JULY 217.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MAY 2022.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 AUG 2022.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 JANU 2023.pdf2 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 19-20.pdf2 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 20-21.pdf2 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22.pdf2 Feb 2023
Building plan approvalFile: IOA.pdf7 Dec 2022
Layout approvalFile: 21-11-22 Approval of Amended Plans of Punith Buildtech Private Ltd_pdf_3-end_1-3.pdf7 Dec 2022
Layout approvalFile: 21-11-22 Approval of Amended Plans of Punith Buildtech Private Ltd_pdf_3-end_4-6.pdf7 Dec 2022
Layout approvalFile: 21-11-22 Approval of Amended Plans of Punith Buildtech Private Ltd_pdf_3-end_7-9.pdf7 Dec 2022
Layout approvalFile: 21-11-22 Approval of Amended Plans of Punith Buildtech Private Ltd_pdf_3-end_10-end.pdf7 Dec 2022
Copy of Layout Approval (in case of layout)File: 21-11-22 Approval of Amended Plans of Punith Buildtech Private Ltd_pdf_3-end_1-3.pdf7 Dec 2022
Copy of Layout Approval (in case of layout)File: 21-11-22 Approval of Amended Plans of Punith Buildtech Private Ltd_pdf_3-end_4-6.pdf7 Dec 2022
Copy of Layout Approval (in case of layout)File: 21-11-22 Approval of Amended Plans of Punith Buildtech Private Ltd_pdf_3-end_7-9.pdf7 Dec 2022
Copy of Layout Approval (in case of layout)File: 21-11-22 Approval of Amended Plans of Punith Buildtech Private Ltd_pdf_3-end_10-end.pdf7 Dec 2022
Building Plan Approval (IOD)File: IOA.pdf7 Dec 2022
Disclosure of sold/ booked inventoryFile: inventory -punith.pdf25 Nov 2022
Certificates of CA (Form 3)File: form 3 (1).pdf24 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginering Certificate (1)(1).pdf3 Sep 2022
Certificates of CA (Form 3)File: CA form 3.pdf3 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf9 Jun 2022
CERSAI detailsFile: cersai declaration.pdf28 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form -5 20-21.pdf26 Mar 2022
Disclosure of sold/ booked inventoryFile: DISLCISURE OF INEENTORY.pdf31 Jan 2022
Declaration about Commencement CertificateFile: CC Declaration.pdf16 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 19-20.pdf16 Oct 2021
Disclosure of sold/ booked inventoryFile: Unit Disclosure.pdf16 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MUTHU KRISHNAN 20 APRIL 2020_compressed.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MUTHU KRISHAN 10 APRIL 2021_compressed.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MUTHU KRISHNAN 9 JULY 2021_compressed.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MUTHU KRISHANA 8 OCT 2021.pdf13 Oct 2021
Layout approvalFile: Punit Contco Amended plants_compressed (1)_00001.pdf20 Aug 2021
Layout approvalFile: Punit Contco Amended plants_compressed (1)_00002.pdf20 Aug 2021
Layout approvalFile: Punit Contco Amended plants_compressed (1)_00003.pdf20 Aug 2021
Layout approvalFile: Punit Contco Amended plants_compressed (1)_00004.pdf20 Aug 2021
Layout approvalFile: Punit Contco Amended plants_compressed (1)_00005.pdf20 Aug 2021
Layout approvalFile: Punit Contco Amended plants_compressed (1)_00006.pdf20 Aug 2021
Layout approvalFile: Punit Contco Amended plants_compressed (1)_00007.pdf20 Aug 2021
Layout approvalFile: Punit Contco Amended plants_compressed (1)_00008.pdf20 Aug 2021
Layout approvalFile: Punit Contco Amended plants_compressed (1)_00009.pdf20 Aug 2021
Layout approvalFile: Punit Contco Amended plants_compressed (1)_00010.pdf20 Aug 2021
Layout approvalFile: Punit Contco Amended plants_compressed (1)_00011.pdf20 Aug 2021
Building plan approvalFile: IOA.pdf20 Aug 2021
Copy of Layout Approval (in case of layout)File: Punit Contco Amended plants_compressed (1)_00001.pdf20 Aug 2021
Copy of Layout Approval (in case of layout)File: Punit Contco Amended plants_compressed (1)_00002.pdf20 Aug 2021
Copy of Layout Approval (in case of layout)File: Punit Contco Amended plants_compressed (1)_00003.pdf20 Aug 2021
Copy of Layout Approval (in case of layout)File: Punit Contco Amended plants_compressed (1)_00004.pdf20 Aug 2021

Keep PRINCE TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dharavi

2 kmPRINCE TOWERCompleted 1Lapsed / revoked 3Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: Punith Buildtech Private Limited

Punith Buildtech Private Limited has 1 registration on MahaRERA, including PRINCE TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that PRINCE TOWER shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PRINCE TOWER is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRINCE TOWER?

The registered promoter entity is Punith Buildtech Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRINCE TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PRINCE TOWER?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PRINCE TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRINCE TOWER?

The professionals named in the filing: Architect: JATIN BHUTA AND ASSOCIATES; Engineer: muthu krishnan and associates; Chartered Accountant: MANOJ SHARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRINCE TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRINCE TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRINCE TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.