Home / Browse projects / CRD Aura

Registered No litigation declared Residential / Group Housing project

CRD Aura

By CRD Blue Ocean LLP

RG-MH-58435 · RERA P51900050806 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: .
Dec 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 31%
15 of 112Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

CRD Aura is a Residential / Group Housing project by CRD Blue Ocean LLP in Dharavi, 400017, registered with MahaRERA as P51900050806 on 3 May 2023. Possession is promised by 31 Dec 2027. 97 of the 112 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameCRD Aura
  • TypeResidential / Group Housing
  • Location
    • Indira Nagar
    • Dharavi
    • 400017
  • Pincode400017
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900050806
  • ReraGenie IDRG-MH-58435

Builder

  • NameCRD Blue Ocean LLP
  • Entity typePartnership
  • PartnersChandrashekhar Dound, Trupti Jadhav

Key dates

this monthRegisteredMay 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 May 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed120 files

Current status

87%97 of 112 units booked
70.5%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA131356359
Wing BNA131353053

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 31%.

Wing A32%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises31%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B32%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises31%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Open Space48
BuildingOpen SpaceTotal
Wing A2424
Wing B2424

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,020 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025
LandownerVillageDistrict
Sparc Samudaya Nirman Sahayak-Mumbai City

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI4425.1
Proposed, not sanctioned3,096 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG1, Abde Villa, 99 S V Road, Khar west, Mumbai 400052
Estimated costRs 36.44 cr
Cost incurredRs 25.71 cr
Work done70.55%
BuildingWingEstimatedIncurred
Wing ANARs 18.10 crRs 12.97 cr
Wing BNARs 17.79 crRs 12.74 cr
-NARs 54.88 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTRUPTI JADHAV
EngineerV. J. JOSHI & ASSOCIATES
EngineerSamir Dilip Mehta
EngineerSUHAS JADHAV
Chartered AccountantR.C. JAIN & ASSOCIATES LLP
Chartered AccountantVINOD KUMAR JAIN
Chartered AccountantAbhishek Lilani
PartnerRole in project
CRD Blue Ocean LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: SIGNED FORM 2A.pdf26 Jun 2026
Withdrawal Update Form 1File: Form 1 CRD AURA MARCH 2026 Q4.pdf21 Apr 2026
Withdrawal Update Form 2File: FORM 2 CRD AURA MARCH 2026 Q4.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 CRD AURA Q4_compressed.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1 CRD AURA MARCH 2026 Q4.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 CRD AURA MARCH 2026 Q4.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2 CRD AURA MARCH 2026 Q4.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2 CRD AURA MARCH 2026 Q4.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 CRD AURA Q4_compressed.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 CRD AURA Q4_compressed.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 DEC 2025.pdf19 Jan 2026
Withdrawal Update Form 2File: FORM 2 DEC 2025.pdf19 Jan 2026
Withdrawal Update Form 3File: FORM 3 DEC 2025.pdf19 Jan 2026
Withdrawal Update Form 1File: Form 1 as on 14 OCT 2025.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2 15 OCT 2025.pdf24 Oct 2025
Withdrawal Update Form 3File: FORM 3 Q2 FY 2025-25 UPLOADED_compressed (1).pdf24 Oct 2025
Withdrawal Update Form 1File: Form 1 as on 14 OCT 2025.pdf23 Oct 2025
Withdrawal Update Form 1File: Form 1 as on 14 OCT 2025.pdf23 Oct 2025
Withdrawal Update Form 2File: Form 2 15 OCT 2025.pdf23 Oct 2025
Withdrawal Update Form 2File: Form 2 15 OCT 2025.pdf23 Oct 2025
Withdrawal Update Form 3File: FORM 3 Q2 FY 2025-25 UPLOADED_compressed (1).pdf23 Oct 2025
Withdrawal Update Form 3File: FORM 3 Q2 FY 2025-25 UPLOADED_compressed (1).pdf23 Oct 2025
Withdrawal Update Form 1File: Form 1 as on 14 OCT 2025.pdf20 Oct 2025
Withdrawal Update Form 1File: Form 1 as on 14 OCT 2025.pdf20 Oct 2025
Withdrawal Update Form 1File: Form 1 as on 14 OCT 2025.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 15 OCT 2025.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 15 OCT 2025.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 15 OCT 2025.pdf20 Oct 2025
Withdrawal Update Form 3File: FORM 3 Q2 FY 2025-25 UPLOADED_compressed (1).pdf20 Oct 2025
Withdrawal Update Form 3File: FORM 3 Q2 FY 2025-25 UPLOADED_compressed (1).pdf20 Oct 2025
Withdrawal Update Form 3File: FORM 3 Q2 FY 2025-25 UPLOADED_compressed (1).pdf20 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_CRD AURA_FY 2024-25.pdf4 Oct 2025
Withdrawal Update Form 1File: FORM 1 CRD AURA APRIL JUNE 2025 Q1.pdf10 Sep 2025
Withdrawal Update Form 2File: form 2 Q1 - 2025-26.pdf10 Sep 2025
Withdrawal Update Form 3File: crd aura Q1 FY 2025-26.pdf10 Sep 2025
Withdrawal Update Form 1File: FORM 1 CRD AURA APRIL JUNE 2025 Q1.pdf22 Jul 2025
Withdrawal Update Form 1File: FORM 1 CRD AURA APRIL JUNE 2025 Q1.pdf22 Jul 2025
Withdrawal Update Form 1File: FORM 1 CRD AURA APRIL JUNE 2025 Q1.pdf22 Jul 2025
Withdrawal Update Form 1File: FORM 1 CRD AURA APRIL JUNE 2025 Q1.pdf22 Jul 2025
Withdrawal Update Form 2File: form 2 Q1 - 2025-26.pdf22 Jul 2025
Withdrawal Update Form 2File: form 2 Q1 - 2025-26.pdf22 Jul 2025
Withdrawal Update Form 2File: form 2 Q1 - 2025-26.pdf22 Jul 2025
Withdrawal Update Form 2File: form 2 Q1 - 2025-26.pdf22 Jul 2025
Withdrawal Update Form 3File: crd aura Q1 FY 2025-26.pdf22 Jul 2025
Withdrawal Update Form 3File: crd aura Q1 FY 2025-26.pdf22 Jul 2025
Withdrawal Update Form 3File: crd aura Q1 FY 2025-26.pdf22 Jul 2025
Withdrawal Update Form 3File: crd aura Q1 FY 2025-26.pdf22 Jul 2025
Building plan approvalFile: Amended IOA dated 05 may 2025.pdf19 Jul 2025
Building plan approvalFile: Sheet 1-5.pdf19 Jul 2025
Building plan approvalFile: Sheet 2-5_compressed.pdf19 Jul 2025
Building plan approvalFile: Sheet 3-5.pdf19 Jul 2025
Building plan approvalFile: Sheet 4-5.pdf19 Jul 2025
Building plan approvalFile: Sheet 5-5.pdf19 Jul 2025
Form 2A (FY 2023-2024)File: FORM 2A 2023-24 SIGNED.pdf30 Jun 2025
Form 2A (FY 2024-2025)File: FORM 2A 2024-25 SIGNED.pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CRD AURA JAN TO MARCH 2025 UPLOADED 19TH APRIL 2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CRD AURA DATED 17-04-2025_ UPLOADED 19TH APRIL 2025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CRD AURA FORM 2 - Q4.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY AS ON 31 MARCH 2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CRD AURA Date 31DEC24 UPLOADED.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CRD AURA OCT TO DEC 2024 Q3 UPLOADED 13 JAN2025.pdf13 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate dated 31DEC2024.pdf13 Jan 2025
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate GR TO 8TH FLR.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CRD AURA OCT TO DEC 2024 Q3 UPLOADED 11JAN2025.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DISCLOSURE 31 DEC 2024.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: sold unsold disclosure.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: sold unsold disclosure.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CRD AURA FORM 3 Q2 FY 2024-25 (1) R.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CRD AURA FORM 1 Q2 FY 2024-25.pdf12 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CRD AURA FORM 2 Q2 FY 2024-25.pdf12 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_CRD AURA_FY 2023-24.pdf5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CRD AURA_FY 2024-25 Q1 REVISED signed R_compressed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_CRD AURA_FY 2024-25 Q1.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_CRD AURA_FY 2024-25 Q1.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A CRD AURA FY 2023-24.pdf18 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_CRD AURA_FY 2023-24 Q4.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_CRD AURA_FY 2023-24 Q4.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CRD AURA_FY 2023-24 Q4_compressed.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 crd aura Dec 2023 Q3.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 crd aura Dec 2023 Q3.pdf17 Jan 2024

Keep CRD Aura on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dharavi

2 kmCRD AuraCompleted 1Lapsed / revoked 4Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: CRD Blue Ocean LLP

CRD Blue Ocean LLP has 1 registration on MahaRERA, including CRD Aura. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if CRD Aura is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CRD Aura?

The registered promoter entity is CRD Blue Ocean LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CRD Aura?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CRD Aura?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CRD Aura?

The professionals named in the filing: Architect: TRUPTI JADHAV; Engineer: V. J. JOSHI & ASSOCIATES; Engineer: Samir Dilip Mehta; Engineer: SUHAS JADHAV; Chartered Accountant: R.C. JAIN & ASSOCIATES LLP; Chartered Accountant: VINOD KUMAR JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CRD Aura?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CRD Aura. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CRD Aura to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.