Home / Browse projects / BAWA AASHIYAAN PHASE 1

Completed No litigation declared Others projectSlum rehabilitation

BAWA AASHIYAAN PHASE 1

By KAY BEE DEVELOPERS PVT. LTD.

RG-MH-28373 · RERA P51900025804 · Last updated on MahaRERA portal: 28 Sep 2026

Why this is marked a redevelopment: this filing shows a sanction from a slum rehabilitation authority. MahaRERA has no redevelopment field, so this is ReraGenie's reading of the filing.

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: .
Jun 2028Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 90%
25 of 116Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 198 documents Report an error

BAWA AASHIYAAN PHASE 1 is a Others project by KAY BEE DEVELOPERS PVT. LTD. in DHARAVI, 400017, registered with MahaRERA as P51900025804 on 17 Jul 2020. The registration is recorded completed; possession was promised by 30 Jun 2028. 91 of the 116 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameBAWA AASHIYAAN PHASE 1
  • TypeOthers
  • Location
    • V.K.WADI
    • DHARAVI
    • 400017
  • Pincode400017
  • RERA no.P51900025804
  • ReraGenie IDRG-MH-28373

Builder

  • NameKAY BEE DEVELOPERS PVT. LTD.
  • Entity typeCompany
  • DirectorsGURINDER KAUR MULTANI, KARANVEER GURINDERSINGH BAWA
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredJul 2020PromisedJun 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Jul 2020
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed198 files

Current status

78%91 of 116 units booked

Figures as on 28 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BAWA AASHIYAANNA22151160116

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

BAWA AASHIYAAN: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%

Progress on shared amenities15

As on 28 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes55%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes35%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered44

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,015 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Aug 2026

Approvals and building plan

Sanctioning authoritySRA, MCGM
Permissible FSI5839.1
Proposed, not sanctioned5,839 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 10 KOHINOOR INDUSTRIAL ESTATE WESTERN EXPRESS HIGHWAY GOREGAON EAST MUMBAI 400053

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS V THAKKER & ASSOCIATES
EngineerS V PATEL & ASSOCIATES
EngineerSamerka Consultants Pvt Ltd
Chartered AccountantDEEPAK N SHAH & CO
Chartered AccountantSekhri Kanodia and Associates
PartnerRole in project
KAY BEE DEVELOPERS PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Dec 2024

Documents filed198

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 198 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: RERA-CA FORM-5-AASHIYAAN PHASE-I (14-02-24).PDF28 Sep 2026
Occupational CertificateFile: Full OC Letter - Part1.pdf28 Sep 2026
Occupational CertificateFile: Full OC Letter - Part2.pdf28 Sep 2026
Occupational CertificateFile: Full OC Letter - Part3.pdf28 Sep 2026
Occupational CertificateFile: Full OC Letter - Part4-.pdf28 Sep 2026
Occupational CertificateFile: Full OC Letter - Part5.pdf28 Sep 2026
Occupational CertificateFile: Full OC Letter - Part6.pdf28 Sep 2026
Occupational CertificateFile: Full OC Letter - Part7-.pdf28 Sep 2026
Form 2A (FY 2025-2026)File: RERA FORM 2A- 31-03-2024.pdf24 Sep 2026
Form 1File: RERA FORM-1 30-09-24.pdf23 Sep 2026
Form 2File: RERA FORM-2_ -30-09-2024.pdf23 Sep 2026
Disclosure of Sold and Booked InventoryFile: Disclosure- 30-09-2024.pdf23 Sep 2026
Form 3File: Form 3 -30-09-2024.pdf23 Sep 2026
Form 1File: RERA FORM-1 30-09-24.pdf23 Sep 2026
Form 2File: RERA FORM-2_ -30-09-2024.pdf23 Sep 2026
Form 3File: Form 3 -30-09-2024.pdf23 Sep 2026
Disclosure of Sold and Booked InventoryFile: Disclosure- 30-09-2024.pdf23 Sep 2026
Form 1File: RERA FORM-1 30-09-24.pdf23 Sep 2026
Form 2File: RERA FORM-2_ -30-09-2024.pdf23 Sep 2026
Form 3File: Form 3 -30-09-2024.pdf23 Sep 2026
Disclosure of Sold and Booked InventoryFile: Disclosure- 30-09-2024.pdf23 Sep 2026
Form 1File: RERA FORM-1 30-09-24.pdf23 Sep 2026
Form 2File: RERA FORM-2_ -30-09-2024.pdf23 Sep 2026
Form 3File: Form 3 -30-09-2024.pdf23 Sep 2026
Disclosure of Sold and Booked InventoryFile: Disclosure- 30-09-2024.pdf23 Sep 2026
Form 1File: RERA FORM-1 30-09-24.pdf23 Sep 2026
Form 2File: RERA FORM-2_ -30-09-2024.pdf23 Sep 2026
Form 3File: Form 3 -30-09-2024.pdf23 Sep 2026
Disclosure of Sold and Booked InventoryFile: Disclosure- 30-09-2024.pdf23 Sep 2026
Form 1File: RERA FORM-1 30-09-24.pdf23 Sep 2026
Form 2File: RERA FORM-2_ -30-09-2024.pdf23 Sep 2026
Form 3File: Form 3 -30-09-2024.pdf23 Sep 2026
Disclosure of Sold and Booked InventoryFile: Disclosure- 30-09-2024.pdf23 Sep 2026
Form 1File: RERA FORM-1 30-09-24.pdf23 Sep 2026
Form 2File: RERA FORM-2_ -30-09-2024.pdf23 Sep 2026
Form 3File: Form 3 -30-09-2024.pdf23 Sep 2026
Disclosure of Sold and Booked InventoryFile: Disclosure- 30-09-2024.pdf23 Sep 2026
Form 1File: RERA FORM-1 30-09-24.pdf23 Sep 2026
Form 2File: RERA FORM-2_ -30-09-2024.pdf23 Sep 2026
Form 3File: Form 3 -30-09-2024.pdf23 Sep 2026
Disclosure of Sold and Booked InventoryFile: Disclosure- 30-09-2024.pdf23 Sep 2026
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC 4TH FLR.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC-SECTION.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC-LAYOUT.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC-GRD FLR.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC-CALCULATION.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC 7 and 14 8 to13 and 15 to 20 A and B.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC 7 and 14 8 to13 and 15 to 21 PT C and D Wing.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC 6TH FLR.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC 5TH FLR.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC 3RD FLR.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC 2ND FLR.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE 3 FULL OC 1ST FLR.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SALE builing FULL OC LTR.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 BA PHASE 1.pdf19 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA FORM 2A BA PHASE 1.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA Phase I.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 BA PHASE 1.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 BA PHASE 1.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA Phase I.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 BA PHASE 1.pdf19 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA FORM 2A BA PHASE 1.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 phase 1.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: rera form 2 phase 1.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: rera form 2A phase 1.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: rera form 3 phase 1.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 phase 1.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: rera form 3 phase 1.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: rera form 2 phase 1.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: rera form 2A phase 1.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 PHASE 1 BA.pdf13 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 PHASE 1 BA.pdf13 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA FORM 2A BA PHASE 1.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA Phase I Bawa Aashiyaan.pdf13 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA-CA FORM-5-AASHIYAAN PHASE-I.pdf16 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Full CC re-endorsed 9 feb 24.pdf12 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Full CC re-endorsed 9 feb 24.pdf12 Feb 2024
Declaration about Commencement CertificateFile: DECLARATIONCOMMENCEMENT CERTificate 12 feb 24.pdf12 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OCC Bawa Aashiyaan 10 November 2023.pdf12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 BA PHASE 1 Dec 2023.pdf5 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
AKASHASHRA SRA CHS LTD. V.K.WADI DHARAVI MUMBAI 400 01783CompletedDec 2020Dec 2020

Keep BAWA AASHIYAAN PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHARAVI

Builder: KAY BEE DEVELOPERS PVT. LTD.

Kay Bee Developers Pvt. Ltd. has 4 registrations on MahaRERA, including AKASH and BAWA AASHIYAAN PHASE 1. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if BAWA AASHIYAAN PHASE 1 is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BAWA AASHIYAAN PHASE 1?

The registered promoter entity is KAY BEE DEVELOPERS PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BAWA AASHIYAAN PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BAWA AASHIYAAN PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BAWA AASHIYAAN PHASE 1?

The professionals named in the filing: Architect: S V THAKKER & ASSOCIATES; Engineer: S V PATEL & ASSOCIATES; Engineer: Samerka Consultants Pvt Ltd; Chartered Accountant: DEEPAK N SHAH & CO; Chartered Accountant: Sekhri Kanodia and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BAWA AASHIYAAN PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BAWA AASHIYAAN PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BAWA AASHIYAAN PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.