Home / Browse projects / Mumbai Suburban, Maharashtra / PEARL OASIS

Completed No litigation declared Others project

PEARL OASIS

By BAHIST ENTERPRISES PVT LTD

RG-MH-69971 · RERA P51800016403 · Last updated on MahaRERA portal: 10 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

PEARL OASIS is a Others project by BAHIST ENTERPRISES PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800016403 on 10 May 2018. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NamePEARL OASIS
  • TypeOthers
  • Location
    • RANI SATI MARG
    • PATHANWADI
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800016403
  • ReraGenie IDRG-MH-69971

Builder

  • NameBAHIST ENTERPRISES PVT LTD
  • Entity typeCompany
  • DirectorADIL AHMED CHANDIWALA
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects3 →

Key dates

this monthRegisteredMay 2018PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 May 2018
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PEARL OASISNA240000
REHAB / COMPOSITE BUILDING PARADISENA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

PEARL OASIS64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
REHAB / COMPOSITE BUILDING PARADISE95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 10 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
PEARL OASIS11
REHAB / COMPOSITE BUILDING PARADISE11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,552 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17717.52
Proposed, not sanctioned17,718 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMADHAV NAGAR S V ROAD ANDHERI WEST MUMBAI 400058

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHISH SOLANKI
PartnerRole in project
BAHIST ENTERPRISES PVT LTD-

Litigation declared1

CaseCourtStatus
2887/2016HIGH COURTPENDING IN HIGH COURT

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Feb 2024

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form_4_dated.pdf10 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC Pearl Oasis.pdf22 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 30062018.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 30092018.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 31122018.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 31032019.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 30062019.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 30092019.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 31122019.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 31032020.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 30062020.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 30092020.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12 31122020.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13 31032021.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14 30062021.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 15 30092021.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 16 31122021.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 17 31032022.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 18 30062022.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 19 30092022.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20 24112022.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 21 31122022.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 22 31032023.pdf19 May 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification 02 11 2019.pdf26 Apr 2023
Certificates of CA (Form 3)File: 2_Chandiwala Project Certification_12-09-2020.pdf26 Apr 2023
Certificates of CA (Form 3)File: 1_Chandiwala Project Certification_13-10-2020.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification.pdf26 Apr 2023
Certificates of CA (Form 3)File: 3_Chandiwala Project Certification17-08-2020.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification 18-02-2020.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification.pdf26 Apr 2023
Certificates of CA (Form 3)File: chandiwala project certification 26122019.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification27112020.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification 2805.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification 18-02-2020.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification 30092019.pdf26 Apr 2023
Certificates of CA (Form 3)File: 2_Chandiwala Project Certification01032021.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification_02012021.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification20012021.pdf26 Apr 2023
Certificates of CA (Form 3)File: Chandiwala Project Certification_2003.pdf26 Apr 2023
Certificates of CA (Form 3)File: 1_Chandiwala Project Certification20012021.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification22022021.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification30032021.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification_0106.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification0207.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification04092021.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification0708.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification09122021.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification_1507.pdf26 Apr 2023
Certificates of CA (Form 3)File: PEARL OASIS RERA CERT.pdf26 Apr 2023
Certificates of CA (Form 3)File: CERTIFICATE_22102021.pdf26 Apr 2023
Certificates of CA (Form 3)File: 1_PEARL OASIS RERA CERT.pdf26 Apr 2023
Certificates of CA (Form 3)File: 1_Pearl_Osisis_240621.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification_26-12-2021.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification_3004.pdf26 Apr 2023
Certificates of CA (Form 3)File: Project Certification30-09-2021.pdf26 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Report 18-19 (2).pdf2 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Report FY 19-20.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Report FY 20-21.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Report FY 21-22.pdf1 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bldg no 39.pdf11 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bldg no 29.pdf11 Feb 2023
Certificates of CA (Form 3)File: FORM.pdf28 Dec 2019
Certificates of CA (Form 3)File: compresspdf_AVLprHcp.pdf4 Apr 2019
Certificates of CA (Form 5)File: form_5_Pearl Oasis.pdf9 Jan 2019
Certificates of CA (Form 3)File: CA Certificate.pdf13 Dec 2018
Building plan approvalFile: IOA.pdf4 May 2018
Layout approvalFile: LAYOUT PLAN.pdf4 May 2018
PAN CardFile: PAN CARD.pdf4 May 2018
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf4 May 2018
Details of encumbrancesFile: LETTER PATHANWADI.pdf4 May 2018
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf4 May 2018
Building Plan Approval (IOD)File: IOA.pdf4 May 2018
Commencement Certificates / NA Order for plotted developmentFile: C C.pdf4 May 2018
Declaration in FORM BFile: FORM B.pdf4 May 2018
Certificates of CA (Form 3)File: C A CERTIFICATE.pdf4 May 2018
Proforma of Allotment letterFile: PATHANWADI AGREEMENT FOR SALE.pdf4 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf1 May 2018

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
AL MADINAPATHANWADI RANI SATI MARG MALAD EAST MUMBAI 9764CompletedJun 2008Jun 2008
AL MINAPATHANWADI RANI SATI MARG MALAD EAST MUMBAI 9764CompletedJan 2006Jan 2006
AL MAKKAHPATHANWADI RANI SATI MARG MALAD EAST MUMBAI 9764CompletedJan 2006Jan 2006

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PEARL OASIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PATHANWADI6,700+ in Mumbai Suburban

2 kmPEARL OASISCompleted 129Lapsed / revoked 84Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 346 registered projects within 2 km.

Builder: BAHIST ENTERPRISES PVT LTD

BAHIST ENTERPRISES PVT LTD has 2 registrations on MahaRERA, including PEARL OASIS and PEARL ICON. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PEARL OASIS is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PEARL OASIS?

The registered promoter entity is BAHIST ENTERPRISES PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PEARL OASIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PEARL OASIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PEARL OASIS?

The professionals named in the filing: Architect: ASHISH SOLANKI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PEARL OASIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PEARL OASIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PEARL OASIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.