Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
0 of 10Construction stages donefurthest along: Excavation, 0%
130 of 130Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 12 documents Report an error

Pawar Skyora is a Mixed project by PAWAR BUILDCON LANDMARKS LLP in Pune, Maharashtra, registered with MahaRERA as PM1261012601841 on 9 Sep 2026. Possession is promised by 31 Dec 2031. 0 of the 130 units on this registration are recorded sold or booked, and 0 of 10 construction stages are filed complete.

At a glance

Project

  • NamePawar Skyora
  • TypeMixed
  • Location
    • S.no 54
    • besides mundhwa flyover
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1261012601841
  • ReraGenie IDRG-MH-44974

Builder

  • NamePAWAR BUILDCON LANDMARKS LLP
  • Entity typeLimited Liability Partnership
  • LLPINAAX-8771
  • GSTIN27ABAFP6328B1ZI
  • PartnersAbhijit Mahindrakar, Ankush Patil, Gorakhnath Pawar

Key dates

this monthRegisteredSep 2026PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Sep 2026
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed12 files

Current status

0%0 of 130 units booked

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ANA31271300130

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 10 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Tower A: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed170

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots170
Stack Parking170

Land and ownership24

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,500 sq m
Land owned byNot the promoter
Named landowners24
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 May 2026
LandownerVillageDistrict
Kishore Suresh KodreMundhawaPune
Ramesh Suresh KodreMundhawaPune
Hemalata Bhiva VavhalMundhawaPune
Shailaja Tukaram BhujbalMundhawaPune
Pravin Dattatray KodreMundhawaPune
Swapnil Dattatray KodreMundhawaPune
Vaishali Ravikant TajaneMundhawaPune
Pandurang Ratikant KodreMundhawaPune
Balasaheb Ratikant KodreMundhawaPune
Vikram Manohar RautMundhawaPune
Deepali Dnyandev AdhavMundhawaPune
Suvarna Kishore KodreGhorpadiPune
Omkar Kishor KodreGhorpadiPune
Radha Ramesh KodreGhorpadiPune
Pallavi Pravin KodreGhorpadiPune
Reshma Swapnil KodreGhorpadiPune
Kaveri Balasaheb KodreGhorpadiPune
Seema Balasaheb KodreGhorpadiPune
Mohini Saurabh KodreGhorpadiPune
Triveni Girish ShindeGhorpadiPune
Rohini Mangesh SasaneGhorpadiPune
Seema Pandurang KodreGhorpadiPune
Ankit Pandurang KodreGhorpadiPune
Amruta Pandurang KodreGhorpadiPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI15851.07
Proposed, not sanctioned15,851 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 2 HIGH POINT S NO 2 4 OPP BHARATHI VIDYAPETH SCHOOL PUNE MAHARASHTRA 411045

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARVEZ JAMADAR AND ASSOCIATES
EngineerRohit Patil
EngineerRushikesh Kamble
Chartered AccountantBangad and Associates
PartnerRole in project
PAWAR BUILDCON LANDMARKS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Mar 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed12

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration and undertaking (Annexure A)File: Declaration Cum undertaking.pdf15 Jul 2026
Layout approvalFile: LAYOUT DATA HIGHLIGHT.pdf15 May 2026
Building plan approval or NA orderFile: SKM_C45826033106200.pdf31 Mar 2026
Building plan approvalFile: scan0818.pdf31 Mar 2026
Building plan approvalFile: scan0820.pdf31 Mar 2026
Building plan approvalFile: scan0823.pdf31 Mar 2026
Building plan approvalFile: scan0824.pdf31 Mar 2026
Building plan approvalFile: scan0825.pdf31 Mar 2026
Building plan approvalFile: scan0826.pdf31 Mar 2026
Building plan approvalFile: scan0827.pdf31 Mar 2026
Building plan approvalFile: scan0821_compressed.pdf31 Mar 2026
Building plan approvalFile: scan0822_compressed.pdf31 Mar 2026

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pawar Skyora on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhawa13,700+ in Pune

2 kmPawar SkyoraCompleted 81Lapsed / revoked 26Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 206 registered projects within 2 km.

Builder: PAWAR BUILDCON LANDMARKS LLP

PAWAR BUILDCON LANDMARKS LLP has 1 registration on MahaRERA, including Pawar Skyora. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Pawar Skyora is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pawar Skyora?

The registered promoter entity is PAWAR BUILDCON LANDMARKS LLP, a limited liability partnership as per the filing. Its LLPIN AAX-8771 and GSTIN 27ABAFP6328B1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pawar Skyora?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Pawar Skyora?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pawar Skyora?

The professionals named in the filing: Architect: PARVEZ JAMADAR AND ASSOCIATES; Engineer: Rohit Patil; Engineer: Rushikesh Kamble; Chartered Accountant: Bangad and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pawar Skyora?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pawar Skyora. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pawar Skyora to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.