Home / Browse projects / Pune, Maharashtra / PARTH ENCLAVE BUILDING F
PARTH ENCLAVE BUILDING F
RG-MH-16253 · RERA P52100025566 · Last updated on MahaRERA portal: 29 Jul 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PARTH ENCLAVE BUILDING F is a Others project by PARTH DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100025566 on 28 Jun 2020. The registration is recorded completed; possession was promised by 24 Mar 2025. The completion date has moved by 18 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NamePARTH ENCLAVE BUILDING F
- TypeOthers
- Location
- KARVE NAGAR
- Haveli
- Pune
- 411052
- Pincode411052
- RERA no.P52100025566
- ReraGenie IDRG-MH-16253
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Jun 2020
- Promised completion24 Mar 2025
- Revised completionRevised to 24 Mar 2025 (originally 30 Sep 2023)
- Buildings1 building record
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PARTH ENCLAVE BUILDING F | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
PARTH ENCLAVE BUILDING F: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 29 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 5% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 5% |
| LIFT | Yes | 100% |
Parking filed53
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR SANJAY BHAGAT |
| Engineer | MUKUND PATIL |
| Chartered Accountant | MR MOHAN GODBOLE |
| Partner | Role in project |
|---|---|
| PARTH DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, M/s. Parth Developers, hereby declare the following with respect to the project Parth Enclave Building F bearing registration number. P52100025566 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, we received the Occupation Certificate (OC) on 24th March 2025 and we have initiated the process for the possession as well, hence we won't be required to upload consents. To provide assurance and facilitate a smooth completion process, we are closely monitoring the remaining activities, ens
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12602018 | Adv amol hari bhokare | PARTH DEVELOPERS | 05/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Jun 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 Sep 2023
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - TechnicalFile: organized (38).pdf | 29 Jul 2025 |
| Declaration in FORM BFile: Affidavit cum Declaration_rotated.pdf | 18 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate (1).pdf | 18 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf | 18 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (1).pdf | 18 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 -19-20_rotated.pdf | 18 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 20-21_rotated.pdf | 18 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 -19-20_rotated.pdf | 18 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf | 18 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A- 20-21.pdf | 18 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29 (2).pdf | 18 Jun 2025 |
| CERSAI detailsFile: Declaration of Cersai.pdf | 18 Jun 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A_rotated.pdf | 18 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 21-22_rotated.pdf | 18 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 21-22.pdf | 18 Jun 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexur A_rotated.pdf | 18 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A - 22-23.pdf | 18 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 3 - 22-23.pdf | 18 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 3 - 22-23.pdf | 18 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A -23-24.pdf | 18 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 3 - 23-24.pdf | 18 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Parth Enclave Building F - Sept 2024.pdf | 23 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Parth Enclave Building F - Sept 2024.pdf | 23 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Parth Enclave Building F - Fy 2022-2023.pdf | 23 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Parth Enclave Building F - Fy 2023-2024.pdf | 23 May 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate F Bldg.pdf | 12 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf | 29 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA_Form-5_2019-20.pdf | 22 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA_Form-5_2020-21.pdf | 22 Apr 2023 |
| Building plan approvalFile: 1-7.pdf | 6 Mar 2023 |
| Building plan approvalFile: 4-7.pdf | 6 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-7.pdf | 6 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-7.pdf | 6 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architec Certificate form 1.pdf | 6 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Final_Certificate_F_Building.pdf | 6 Feb 2023 |
| Proforma of Agreement for saleFile: draft agreement.pdf | 31 Jan 2023 |
| Proforma of Allotment letterFile: Final blank agreement.pdf | 8 Aug 2022 |
| OtherFile: Letter for correction status.pdf | 27 Nov 2021 |
| Declaration about Commencement CertificateFile: Declaration about Commencemnt Certificate Form D.pdf | 18 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Karve Nagar F Bldg.pdf | 18 Aug 2021 |
| Building plan approvalFile: 4-7.pdf | 6 Aug 2021 |
| Layout approvalFile: 1-7.pdf | 6 Aug 2021 |
| Copy of Layout Approval (in case of layout)File: 1-7.pdf | 6 Aug 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-7.pdf | 6 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf | 6 Aug 2021 |
| Proforma of Allotment letterFile: draft agreement.pdf | 9 Jun 2021 |
| Proforma of Allotment letterFile: FINAL Draft of Agreement.pdf | 18 Dec 2020 |
| Layout approvalFile: LAYOUT.pdf | 3 Nov 2020 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 3 Nov 2020 |
| Layout approvalFile: LAYOUT.pdf | 29 Oct 2020 |
| Layout approvalFile: scan10536 (1).pdf | 29 Oct 2020 |
| Layout approvalFile: scan10537 (1).pdf | 29 Oct 2020 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 29 Oct 2020 |
| Copy of Layout Approval (in case of layout)File: scan10536 (1).pdf | 29 Oct 2020 |
| Copy of Layout Approval (in case of layout)File: scan10537 (1).pdf | 29 Oct 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement Certificate --.pdf | 29 Oct 2020 |
| Declaration in FORM BFile: affidavitcumdeclaration.pdf | 13 Jun 2020 |
| Proforma of Allotment letterFile: Parth Developers RERA.pdf | 13 Jun 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PARTHRERA.pdf | 12 Jun 2020 |
| Proforma of Allotment letterFile: Booking or allottment letter.pdf | 12 Jun 2020 |
| Copy of the legal title reportFile: serachandtitlereport.pdf | 10 Jun 2020 |
| Details of encumbrancesFile: DetailsofEncumbrances.pdf | 25 May 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: commencementcertificate.pdf | 25 May 2020 |
| Layout approvalFile: layoutplan.pdf | 23 May 2020 |
| Building plan approvalFile: buildingplan.pdf | 23 May 2020 |
| Building plan approvalFile: buildingplan.pdf | 23 May 2020 |
| PAN CardFile: Parth developers pan.pdf | 23 May 2020 |
| Copy of Layout Approval (in case of layout)File: layoutplan.pdf | 23 May 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: buildingplan.pdf | 23 May 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: buildingplan.pdf | 23 May 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PARTH JAINAM | SUS PUNE | 116 | Completed | Mar 2016 | Late, Aug 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
Keep PARTH ENCLAVE BUILDING F on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KARVE NAGAR13,700+ in Pune
LE SKYLARK
KAKADE GREEN ESTATES PRIVATE LIMITED
River Dale Residency
Maha Anand Pinnac Associates
Studio06
KARVENAGAR STUDIO LLP
1 GOLDLEAF
GOLDLEAF REALTORS
G M Mahika
G M DEVELOPERS
SIDDHIVINAYAK RESIDENCY
KELKAR PINNAC HOUSING LLP
Builder: PARTH DEVELOPERS
PARTH DEVELOPERS has 11 registrations on MahaRERA, including PARTH ENCLAVE E BUILDING and PARTH CLASSIC. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if PARTH ENCLAVE BUILDING F is delayed beyond 24 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PARTH ENCLAVE BUILDING F?
The registered promoter entity is PARTH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PARTH ENCLAVE BUILDING F?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PARTH ENCLAVE BUILDING F?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PARTH ENCLAVE BUILDING F?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PARTH ENCLAVE BUILDING F?
The professionals named in the filing: Architect: MR SANJAY BHAGAT; Engineer: MUKUND PATIL; Chartered Accountant: MR MOHAN GODBOLE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PARTH ENCLAVE BUILDING F?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.