Home / Browse projects / Pune, Maharashtra / Studio06
Studio06
RG-MH-53457 · RERA P52100055193 · Last updated on MahaRERA portal: 16 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 5 months past the filed date
- Litigation declared, 2 cases
- 2 complaints at MahaRERA
- Rs 30.00 crore secured on the land, in favour of PRABODH ARTH SANCHAY PVT LTD
- The declared charge does not appear in the CERSAI report on the filing
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Studio06 is a Others project by KARVENAGAR STUDIO LLP in Pune, Maharashtra, registered with MahaRERA as P52100055193 on 11 Mar 2024. Possession was promised by 31 May 2026 and is now 5 months past that date. 119 of the 199 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameStudio06
- TypeOthers
- Location
- -
- Karve Nagar
- Haveli
- Pune
- 411052
- Pincode411052
- RERA no.P52100055193
- ReraGenie IDRG-MH-53457
Builder
- NameKARVENAGAR STUDIO LLP
- Entity typePartnership
- PartnersABHIJEET VASANT SHENDE, SWAPNEEL SHASHIKANT SHENDE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Mar 2024
- Promised completion31 May 2026
- Revised completionNone
- Buildings1 building record
- Documents filed84 files
Current status
Figures as on 16 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Studio06 | NA | 10 | 10 | 171 | 28 | 199 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
Studio06: 78% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
Progress on shared amenities15
As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed320
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership14
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| DINKAR NARAYAN BARATE | Karve Nagar | Pune |
| VATSALBAI DINKAR BARATE | Karve Nagar | Pune |
| SAMBHAJIRAO DINKAR BARATE | Karve Nagar | Pune |
| BALASAHEB ALIAS JANARDAN DINKAR BARATE | Karve Nagar | Pune |
| ASHOK DINKAR BARATE | Karve Nagar | Pune |
| BABURAO MAGAN SANE | Karve Nagar | Pune |
| DNYANOBA NARAYAN BARATE | Karve Nagar | Pune |
| VATSALABAI DNYANOBA BARATE | Karve Nagar | Pune |
| VILASRAO DNYANOBA BARATE | Karve Nagar | Pune |
| VITTHAL DNYANOBA BARATE | Karve Nagar | Pune |
| DILIP DNYANOBA BARATE | Karve Nagar | Pune |
| SUKHADEO CHANDRAKANT ZENDE | Karve Nagar | Pune |
| BABAN PANDURANG GHULE | Karve Nagar | Pune |
| SHANTABAI PANDURANG GHULE | Karve Nagar | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Studio06 | NA | Rs 20.00 cr | Rs 9.88 cr |
| - | NA | Rs 47.81 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mangesh Gotal |
| Engineer | RAVIRAJ KARANDE |
| Chartered Accountant | Hemang Vyasa om super market |
| Chartered Accountant | HNV AND CO |
| Chartered Accountant | NITESH M SHAH & CO |
| Partner | Role in project |
|---|---|
| KARVENAGAR STUDIO LLP | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 201980/2009 | CIVIL COURT SENIOR DEVISION PUNE | PENDING |
| 201980/2009 | CIVIL COURT SENIOR DIVISION PUNE | Ongoing |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600084 | Ram Gawali | KARVENAGAR STUDIO LLP | 23/01/2026 |
| SM12600087 | Ram Gawali | KARVENAGAR STUDIO LLP | 23/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Oct 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Oct 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 FINAL.pdf | 16 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 16 May 2026 |
| Withdrawal Update Form 3File: 6 Form 3 - Karvenagar Studio March 2026_organized.pdf | 16 May 2026 |
| Withdrawal Update Form 1File: Dec 25_Studio 06 Architect Cert.pdf | 16 Feb 2026 |
| Withdrawal Update Form 2File: Dec 25 Studio06 registration_E cert.pdf | 16 Feb 2026 |
| Withdrawal Update Form 3File: Karvenagar_Form 3_Dec 2025.pdf | 16 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5_Karvenagar Studio LLP _FY 2024-25.pdf | 29 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1 (1).pdf | 27 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 27 Nov 2025 |
| Withdrawal Update Form 3File: Karvenagar Studio LLP_CA_Form3_Sep 2025.pdf | 27 Nov 2025 |
| Layout approvalFile: LAYOUT - STUDIO 06.pdf | 6 Oct 2025 |
| Building plan approvalFile: 02-05 5.pdf | 6 Oct 2025 |
| Building plan approvalFile: 03-05 5.pdf | 6 Oct 2025 |
| Building plan approvalFile: 04-05 5.pdf | 6 Oct 2025 |
| Building plan approvalFile: 05-05.pdf | 6 Oct 2025 |
| Form 1File: FROM 1.pdf | 4 Oct 2025 |
| Form 2File: FORM 2.pdf | 4 Oct 2025 |
| Form 3File: FROM 3.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY DATED 30-06-2025.pdf | 4 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar 25_Studio 06 Architects Cert.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Studio 06 Sold Unsold.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 24 Studio06 registration_E cert.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 24 Studio06 Architect Cert (1).pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Studio 6_Dec 24 Sold Unsold Inventory Certificate.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Studio06 JUNE.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 STUDION 06.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Studio 6 Rera Sold Unsold.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Studio 06 - Karvenagar LLP (1).pdf | 8 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner Jul 30, 2024 1-40 PM (2).pdf | 30 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Studio06 Form 2 June 24 Eng.pdf | 29 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Studio06 Form 2 June 24 Eng.pdf | 29 Jul 2024 |
| Layout approvalFile: 01-05_11zon.pdf | 10 Jun 2024 |
| Building plan approvalFile: 02-05_11zon.pdf | 10 Jun 2024 |
| Building plan approvalFile: 03-05_11zon.pdf | 10 Jun 2024 |
| Building plan approvalFile: 04-05_11zon.pdf | 10 Jun 2024 |
| Building plan approvalFile: 05-05_11zon.pdf | 10 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: 01-05_11zon.pdf | 10 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 02-05_11zon.pdf | 10 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 03-05_11zon.pdf | 10 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 04-05_11zon.pdf | 10 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 05-05_11zon.pdf | 10 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate - 19-04-2024_11zon.pdf | 10 Jun 2024 |
| Proforma of Agreement for saleFile: Studio06 -Final.pdf | 10 Jun 2024 |
| Proforma of Agreement for saleFile: Studio06 -Final.pdf | 6 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Mar 24 Studio06 registration_Q cert.pdf | 30 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Mar 24 Studio06_Sold Unsold Inventory Certificate.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar 24 Studio 06 Architect Cert.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mar 24 Studio06 registration_E cert.pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Cretificate - Studio06.pdf | 29 Apr 2024 |
| Other - LegalFile: Declaration Cum Undertaking (1).pdf | 1 Mar 2024 |
| Other - FinanceFile: Declaration Cum Undertaking (1).pdf | 1 Mar 2024 |
| Copy of the legal title reportFile: Title Report - Hingne BK Karvengar 02-11-2023_compressed.pdf | 27 Feb 2024 |
| Building plan approvalFile: LO Units Annexure.pdf | 24 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: LO Units Annexure.pdf | 24 Feb 2024 |
| Other - TechnicalFile: RERA No declaration.pdf | 24 Feb 2024 |
| Other - TechnicalFile: LO Units Annexure.pdf | 24 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclosure Of Interest.pdf | 22 Feb 2024 |
| Proforma of Allotment letterFile: Studio06 Allot letter.pdf | 21 Feb 2024 |
| Proforma of Agreement for saleFile: ilovepdf_merged (1)_organized.pdf | 21 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation- Allotment - Karvenagar.pdf | 21 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: AFS - Deviation Report_11zon.pdf | 21 Feb 2024 |
| Layout approvalFile: 01-03 - Layout_11zon (1).pdf | 13 Feb 2024 |
| Building plan approvalFile: 02-03_11zon.pdf | 13 Feb 2024 |
| Building plan approvalFile: 03-03_11zon.pdf | 13 Feb 2024 |
| PAN CardFile: Karvenagar Studio LLP - PAn Card.pdf | 13 Feb 2024 |
| Copy of the legal title reportFile: Format A - Legal Title Report .pdf | 13 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf | 13 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance Certificate.pdf | 13 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 13 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance Certificate.pdf | 13 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 01-03 - Layout_11zon (1).pdf | 13 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 02-03_11zon.pdf | 13 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 03-03_11zon.pdf | 13 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate - 09-02-2023_11zon.pdf | 13 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth Certificate - 10-08-2006 - A Wing.pdf | 13 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Verification (1).pdf | 13 Feb 2024 |
| Declaration about Commencement CertificateFile: CCD.pdf | 13 Feb 2024 |
| Declaration in FORM BFile: Affidavit Declaration - Karvenagar Studio LLp- Rera.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate_page-0001 (1).pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 2.pdf | 13 Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Studio06 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -13,700+ in Pune
LE SKYLARK
KAKADE GREEN ESTATES PRIVATE LIMITED
River Dale Residency
Maha Anand Pinnac Associates
1 GOLDLEAF
GOLDLEAF REALTORS
G M Mahika
G M DEVELOPERS
SIDDHIVINAYAK RESIDENCY
KELKAR PINNAC HOUSING LLP
GOMATI NARMADA CHSL
Kotibhaskar Infrastructures &Developers Pv
Builder: KARVENAGAR STUDIO LLP
KARVENAGAR STUDIO LLP has 1 registration on MahaRERA, including Studio06. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Studio06 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Studio06 is delayed beyond 31 May 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Studio06?
The registered promoter entity is KARVENAGAR STUDIO LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Studio06?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Studio06?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Studio06?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Studio06?
The professionals named in the filing: Architect: Mangesh Gotal; Engineer: RAVIRAJ KARANDE; Chartered Accountant: Hemang Vyasa om super market; Chartered Accountant: HNV AND CO; Chartered Accountant: NITESH M SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Studio06?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback