Park Abode
By Shree Siddhivinayak Developer
RG-MH-30060 · RERA P51900029734 · Last updated on MahaRERA portal: 10 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- Completion date moved by 21 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Park Abode is a Residential / Group Housing project by Shree Siddhivinayak Developer in Mumbai City, Maharashtra, registered with MahaRERA as P51900029734 on 26 Jun 2021. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 21 months from the original filing. 28 of the 88 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NamePark Abode
- TypeResidential / Group Housing
- Location
- Lady Jamshetji Road
- Shivaji Park
- Dadar West
- GNorth-400028
- Ward GNorth
- Mumbai City
- 400028
- Pincode400028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900029734
- ReraGenie IDRG-MH-30060
Builder
- NameShree Siddhivinayak Developer
- Entity typePartnership
- PartnersRameshchandra Gulabchand Bhutra, Gautam Ramniwas Kamathia, Pravin Jagannath Naik, Ranjan Vishwanath Karalkar, Kamalkishore Gangadhar Agarwal
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Jun 2021
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed136 files
Current status
Figures as on 10 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Park Abode | NA | 23 | 23 | 79 | 9 | 88 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Park Abode: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed48
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Park Abode | NA | Rs 29.25 cr | Rs 24.45 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mario E Correa |
| Engineer | Vipra consultants |
| Engineer | Akshay Nandkumar Mule |
| Chartered Accountant | CA Chetan Mehta |
| Chartered Accountant | KAPURE AND KAPURE |
| Partner | Role in project |
|---|---|
| Shree Siddhivinayak Developer | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per attachment
Reason as filed by the promoterThe current facts of the case are being explained hereunder.We started construction work in full swing. Quality of the construction is our primary preference and therefore we do not compromise with the quality of construction over speed of the construction. Therefore, as per the given circumstances, the construction work progressed. Industry Slow Down - As everybody is aware, Real Estate Industry is facing severe slowdown all across the country and we are no exceptions. It has affected our sales and further our liquidity. Lack of liquidity is affecting project progress which ultimately affecti
Reason as filed by the promoterThe current facts of the case are being explained hereunder. We started construction work in full swing. Quality of the construction is our primary preference and therefore we do not compromise with the quality of construction over speed of the construction. Therefore, as per the given circumstances, the construction work progressed. Industry Slow Down - As everybody is aware, Real Estate Industry is facing severe slowdown all across the country and we are no exceptions. It has affected our sales and further our liquidity. Lack of liquidity is affecting project progress which ultimately affect
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Jun 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Jun 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jun 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed136
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architect Certificate June 2026.pdf | 10 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate June 2026.pdf | 10 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate June 2026.pdf | 10 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate June 2026.pdf | 10 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - March 2026 - Park Abode.pdf | 10 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - March 2026 - Park Abode.pdf | 10 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - March 26.pdf | 29 May 2026 |
| Withdrawal Update Form 1File: Form 1 - Park Abode - March 26.pdf | 8 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Park Abode - March 26.pdf | 8 May 2026 |
| Withdrawal Update Form 3File: Form 3 - Park Abode - March 26.pdf | 8 May 2026 |
| Form 5 (FY 2021-2022)File: Form 5 - 21-22.pdf | 20 Jan 2026 |
| Form 5 (FY 2022-2023)File: Form 5 - 22-23.pdf | 20 Jan 2026 |
| Form 5 (FY 2023-2024)File: Form 5 - 23-24.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 24-25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Dec 25.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Dec 25.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Dec 25.pdf | 14 Jan 2026 |
| Form 2A (FY 2021-2022)File: Form 2A March 23.pdf | 13 Jan 2026 |
| Form 2A (FY 2022-2023)File: Form 2A March 23.pdf | 13 Jan 2026 |
| Form 2A (FY 2023-2024)File: Form 2A - March 24.pdf | 13 Jan 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - March 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Sept 25 - Park Abode.pdf | 12 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 - Sept 25 - Park Abode.pdf | 12 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 - Sep 25 - Park Abode.pdf | 12 Nov 2025 |
| Form 1File: Form 1 Architect's Certificate Dec 2024.pdf | 22 Aug 2025 |
| Form 2File: Form 2 Engineer's Certificate Dec 2024.pdf | 22 Aug 2025 |
| Form 3File: Form 3 Dec 2024.pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure SoldBooked Inventory Dec 2024.pdf | 22 Aug 2025 |
| Form 1File: Architect Certificate Sep- 2024.pdf | 22 Aug 2025 |
| Form 2File: Engineer Certificate Sep-2024.pdf | 22 Aug 2025 |
| Form 3File: Form - 3 Sep 2024.pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf | 22 Aug 2025 |
| Form 1File: Architects Certificate June 2024.pdf | 22 Aug 2025 |
| Form 2File: Enginner Certificate JUNe 2024.pdf | 22 Aug 2025 |
| Form 3File: Form - 3.pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inverntory.pdf | 22 Aug 2025 |
| Withdrawal Update Form 1File: Form 1 Architect certificate June 25.pdf | 22 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer certificate June 2025.pdf | 22 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 June 25.pdf | 22 Aug 2025 |
| Form 1File: Form 1 Architect Certificate March 2025.pdf | 23 Jun 2025 |
| Form 2File: Form 2 Engineer Certificate March 2025.pdf | 23 Jun 2025 |
| Form 3File: Sigend Form 3 - Park Abode.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold & Booked Inventory March 2025.pdf | 23 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sigend Form 3 - Park Abode.pdf | 8 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate March 2025.pdf | 6 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate March 2025.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate Dec 2024.pdf | 19 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2024.pdf | 19 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate Dec 2024.pdf | 19 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure SoldBooked Inventory Dec 2024.pdf | 19 Jan 2025 |
| CERSAI detailsFile: Declaration for CERSAI.pdf | 14 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 14 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Gautam Kamathia.pdf | 14 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Pravin Naik.pdf | 14 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Rameshchandra Bhutra.pdf | 14 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ranjan Karalkar.pdf | 14 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Santosh Chitnis.pdf | 14 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: kamalkishore Agarwal.pdf | 14 Jan 2025 |
| Declaration in FORM BFile: Affidavit cum declaration.pdf | 10 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5.pdf | 17 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 17 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Rera.pdf | 17 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep- 2024.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Sep 2024.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sep-2024.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate June 2024.pdf | 5 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3.pdf | 5 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner Certificate JUNe 2024.pdf | 5 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inverntory.pdf | 5 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 08 Form 1 Architect Certificate March 24.pdf | 14 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 08 Form 2 Engineer Certificate March 24.pdf | 14 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Siddhivinayak Developers Form 3 Mar 24.pdf | 14 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 06 Form 1 Architect Certificate Sep 23.pdf | 3 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 07 Form 1 Architect Certificate Dec 23.pdf | 3 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06 Form 2 Engineer Certificate Sep 23.pdf | 3 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 07 Form 2 Engineer Certificate Dec 23.pdf | 3 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory Dec23.pdf | 3 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Siddhivinayak Developers Sep 23.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Siddhivinayak Developers Dec 2023.pdf | 31 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 136 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Park Abode on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shivaji Park, Dadar West780+ in Mumbai City
Filed coordinates, straight-line distance. 254 registered projects within 2 km.
Kohinoor Square Phase 1
Kohinoor CTNL Infrastructure Company Priva
Sigma Garnet
COLO COLOR PRIVATE LIMITED
PALETTE
SURAJ ESTATE DEVELOPERS LTD
Eon One
Firstlight Properties Private Limited
Ratan Address
Shri Nakoda Enterprises
Promesa West End
M/s. virtue Enterprises
See every Mumbai City project, with the district possession charts
Builder: Shree Siddhivinayak Developer
Shree Siddhivinayak Developer has 1 registration on MahaRERA, including Park Abode. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if Park Abode is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Park Abode?
The registered promoter entity is Shree Siddhivinayak Developer, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Park Abode?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Park Abode?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Park Abode?
The professionals named in the filing: Architect: Mario E Correa; Engineer: Vipra consultants; Engineer: Akshay Nandkumar Mule; Chartered Accountant: CA Chetan Mehta; Chartered Accountant: KAPURE AND KAPURE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Park Abode?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback