Parinee i
By PARINEE REALTY PRIVATE LIMITED
RG-MH-19662 · RERA P51800001904 · Last updated on MahaRERA portal: 3 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 6 complaints at MahaRERA
- Completion date moved by 90 months
- 4 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Parinee i is a Commercial project by PARINEE REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001904 on 29 Jul 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 90 months from the original filing. 246 of the 286 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 6 complaints are on record with the regulator.
At a glance
Project
- NameParinee i
- TypeCommercial
- Location
- Off Link Road
- Andheri west
- Andheri
- Mumbai Suburban
- 400053
- Pincode400053
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800001904
- ReraGenie IDRG-MH-19662
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Jul 2017
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed138 files
Current status
Figures as on 3 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Parinee i | NA | 34 | 31 | 0 | 286 | 286 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 0%.
Parinee i: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed304
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Parinee i | NA | Rs 229.73 cr | Rs 276.82 cr |
| - | NA | Rs 28.17 cr | Rs 23.72 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dharmesh Chevli |
| Engineer | Vinayak Bowlekar |
| Chartered Accountant | Barin Trivedi & Co. |
| Chartered Accountant | B B Jain and Associates |
| Partner | Role in project |
|---|---|
| PARINEE REALTY PRIVATE LIMITED | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter“Parinee i” is a Commercial Project being undertaken under the SRA. The RCC structure is already completed way back in 2019, but due to current pandemic situation and non-disbursal of funds by the lending institution due to their internal issues, the further work couldn’t be completed within the stipulated time. The reasons/circumstances, which were beyond the control of Promoter are enlisted below:- Delay in grant of various approvals: Due to changes in the regulations, the project plans are amended in April 2017. Post that there is delay in granting various approvals like Further CC, High Ri
Reason as filed by the promoter“Parinee I” is a Commercial Project undertaken under the SRA. The RCC structure of the entire building is already completed way back in 2019. Due to past pandemic situation, non-disbursal of funds by the lending institution and various delay in approvals from the competent authorities, the further work couldn’t be completed within the stipulated time and the reasons were beyond the control of Promoter 1) On 31st December 2020 SRA had issued stop work on project on baseless grounds. We had filed Writ Petition (L) 8601 in High Court, whilst the same was pending SRA withdrew the Stop Work Notice
Reason as filed by the promoter“Parinee I” is a 30 storey Commercial Project undertaken under the SRA. The RCC structure of the entire building is already completed way back in 2019. Due to past pandemic situation, non-disbursal of funds by the lending institution and various delay in approvals from the competent authorities, the further work couldn’t be completed within the stipulated time and the reasons were beyond the control of Promoter 1) The finishing work uptill 23rd floor is already completed and no inventory is sold beyond 23rd Floor. 2) We have obtained Part Occupation Certificate uptill 12th Floor on 02/11/223,
Reason as filed by the promoterWe, Parinee Realty Private Limited, the promoter of the project Parinee i (Registration No. P51800001904) under MahaRERA, hereby submit our request for an extension of time for the completion of the project. We wish to clarify that the construction of the project has been completed and we have also received Part Occupancy Certificate for a major portion of the project from the Planning Authority Slum Rehabilitation Authority. However, the Full Occupancy Certificate is yet to be received. Certain SRA compliances are pending from our side, which are required to be completed before the Planning A
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 258/2017 | HIGH COURT BOMBAY | NOTICE OF MOTION FOR HEARING |
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000044303 | RADHAKRISHNA SHETTY | PARINEE REALTY PVT LTD | 27/04/2018 |
| CC006000000193953 | Aman Sachdeva & Sejal Sachdeva | Shri Vipul Dilip Shah | 10/09/2020 |
| CC006000000395566 | NARENDRA POPAT | PARINEE REALTY PRIVATE LTD | 08/05/2023 |
| CC006000000395567 | CHANDRAVADAN TRIVEDI | PARINEE REALTY PRIVATE LTD | 08/05/2023 |
| CC006000000540768 | SAHIL SIKANDER SHAIKH | PARINEE REALITY PVT. LTD. | 13/06/2024 |
| CC12604555 | Tarun Rathi | Parinee Realty Private Limited | 20/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 Mar 2024
Documents filed138
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 138 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: VINAYAK J BOWLEKAR.pdf | 3 Sep 2026 |
| Withdrawal Update Form 1File: Form 1 Parinee I June 2026.pdf | 27 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Parinee I June 2026.pdf | 27 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Parinee I June 2026.pdf | 27 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Parinee I June 2026.pdf | 27 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Parinee I June 2026.pdf | 27 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Parinee I June 2026.pdf | 27 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Parinee I Jun 26.pdf | 27 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Parinee I Jun 26.pdf | 27 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Parinee I Jun 26.pdf | 27 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Parinee I Jun 26.pdf | 27 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Parinee I Jun 26.pdf | 27 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Parinee I Jun 26.pdf | 27 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Parinee I June 2026_compressed.pdf | 27 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Parinee I June 2026_compressed.pdf | 27 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Parinee I June 2026_compressed.pdf | 27 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Parinee I June 2026_compressed.pdf | 27 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Parinee I June 2026_compressed.pdf | 27 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Parinee I June 2026_compressed.pdf | 27 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Parinee I June 2026.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Parinee I June 2026.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Parinee I June 2026.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Parinee I Jun 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Parinee I Jun 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Parinee I Jun 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Parinee I June 2026_compressed.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Parinee I June 2026_compressed.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Parinee I June 2026_compressed.pdf | 21 Aug 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Parinee - I Form - I March 2025.pdf | 4 May 2025 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 March 2025 pt 1.pdf | 4 May 2025 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 March 2025 pt 2.pdf | 4 May 2025 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 March 2025 pt 3.pdf | 4 May 2025 |
| Certificates of CA (Form 5)File: Form 5 - Parinee I - FY 2024-25.pdf | 4 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee I March 2025.pdf | 4 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Parinee I FORM 1 JUNE 2024.pdf | 22 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Parinee I FORM 1 SEPTEMBER 2024.pdf | 22 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Parinee I FORM 1 DECEMBER 2024.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 30th June 2024.pdf | 9 Feb 2025 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 Sep 2024.pdf | 9 Feb 2025 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 Dec 2024.pdf | 9 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee I June 2024.pdf | 9 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee I Sep 2024.pdf | 9 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee I Dec 2024.pdf | 9 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Parinee I _RERA _Sold, Unsold and Booked.pdf | 9 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-Parinee I-Engneer Certificate.pdf | 22 Jan 2025 |
| Certificates of CA (Form 5)File: Form 5 - Parinee I - FY 2023-24.pdf | 26 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Parinee I - FY 2023-24.pdf | 26 Dec 2024 |
| Declaration in FORM BFile: Form B Parinee I Rera Extension.pdf | 17 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Parinee I Form 1 March 2024.pdf | 17 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Parinee I Form 2 March 2024.pdf | 17 May 2024 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 31st March 2024_1.pdf | 17 May 2024 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 31st March 2024_2.pdf | 17 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC 05032024.pdf | 4 May 2024 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 4 May 2024 |
| Details of encumbrancesFile: JCF New Loan.pdf | 30 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Parinee I June 2023.pdf | 30 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Parinee I Sep 2023.pdf | 30 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Parinee I Dec 2023.pdf | 30 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Parinee I March 2023.pdf | 30 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee I June 2023.pdf | 30 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 parinee i Sep 2023.pdf | 30 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee I Dec 2023.pdf | 30 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Parinee I _Sold, Unsold, Booked Inventory 29022024.pdf | 30 Mar 2024 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 30th June 2023_1.pdf | 30 Mar 2024 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 30th June 2023_2.pdf | 30 Mar 2024 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 30th June 2023_3.pdf | 30 Mar 2024 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 30th September 2023_1.pdf | 30 Mar 2024 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 30th September 2023_2.pdf | 30 Mar 2024 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 30th September 2023_3.pdf | 30 Mar 2024 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 31st December 2023_1.pdf | 30 Mar 2024 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 31st December 2023_2.pdf | 30 Mar 2024 |
| Certificates of CA (Form 3)File: Parinee I - Rera Form 3 - 31st December 2023_3.pdf | 30 Mar 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Parinee I Part OC till 12th Floor.pdf | 30 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Parinee I Jun 2022.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Parinee i Sep 2022.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Parinee I Dec 2022.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Parinee i Mar 2023.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Parinee i form 3 fy 18.pdf | 29 Sep 2023 |
| Certificates of CA (Form 5)File: Form 5- Parinee I_FY 2022-23.pdf | 29 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Parinee I_FY 2022-23.pdf | 29 Sep 2023 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ANANDVILLA | PLOT NO. 65 Z LINKING ROAD SANTACRUZ WEST VILLAGE BANDRA TALUKA ANDHERI MUMBAI. | 17 | Completed | Sep 2012 | Late, Dec 2012 |
| SUDEEP | PLOT NO 61 NUTAN LAXMI CHSL NS ROAD NO 8 JVPD VILLE PARLE WEST MUMBAI | 10 | Completed | Mar 2012 | Late, May 2012 |
| KRISHLIN | SUB PLOT NO 13 NUTAN LAXMI CHSL NS ROAD NO 10 JVPD VILLE PARLE WEST MUMBAI | 10 | Completed | Mar 2010 | Late, Apr 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 138 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Parinee i on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Andheri west6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 336 registered projects within 2 km.
LIVSMART KURLA
D. K. REALTY (INDIA) PVT. LTD.
MOONGIPA ARCADE
MOONGIPA REALTY PRIVATE LIMITED
LINKBAY RESIDENCES PHASE I
PORTSMOUTH BUILDCON PRIVATE LIMITED
Purva Estrella
Puravankara Ltd
78 LAKE TOWN
ANIRDESH DEVELOPERS PRIVATE LIMITED
Transcon Triumph Tower 2
Transcon Triumph Phase 2 Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: PARINEE REALTY PRIVATE LIMITED
PARINEE REALTY PRIVATE LIMITED has 3 registrations on MahaRERA, including Parinee Adney and Parinee i. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Parinee i is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Parinee i?
The registered promoter entity is PARINEE REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Parinee i?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Parinee i?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Parinee i?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Parinee i?
The professionals named in the filing: Architect: Dharmesh Chevli; Engineer: Vinayak Bowlekar; Chartered Accountant: Barin Trivedi & Co.; Chartered Accountant: B B Jain and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Parinee i?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback