Home / Browse projects / Pune, Maharashtra / Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2
Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2
By PARANJAPE SCHEMES (CONSTRUCTION) LTD
RG-MH-02276 · RERA P52100000452 · Last updated on MahaRERA portal: 8 Apr 2025
Source: official MahaRERA filing
Red flags
- 28 complaints at MahaRERA
- Completion date moved by 51 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2 is a Others project by PARANJAPE SCHEMES (CONSTRUCTION) LTD in Pune, Maharashtra, registered with MahaRERA as P52100000452 on 18 Jul 2017. The registration is recorded completed; possession was promised by 28 Mar 2025. The completion date has moved by 51 months from the original filing. 28 complaints are on record with the regulator.
At a glance
Project
- NameParanjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2
- TypeOthers
- Location
- Nahre industrial estate Road
- Dhayari
- Dhayari (Part)
- Haveli
- Pune
- 411041
- Pincode411041
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100000452
- ReraGenie IDRG-MH-02276
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Jul 2017
- Promised completion28 Mar 2025
- Revised completionRevised to 28 Mar 2025 (originally 31 Dec 2020)
- Buildings6 building records
- Documents filed64 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| T1 | NA | 17 | 17 | 0 | 0 | 0 |
| T2 | NA | 17 | 17 | 0 | 0 | 0 |
| T3 | NA | 18 | 18 | 0 | 0 | 0 |
| M1A | NA | 12 | 12 | 0 | 0 | 0 |
| M1B | NA | 12 | 12 | 0 | 0 | 0 |
| M2 | NA | 12 | 12 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 8 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
51 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.
T1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
T298%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 75% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
T3100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
M1A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
M1B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
M20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities17
As on 8 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 100% |
| SWIMMING POOL | Yes | 100% |
| CLUB HOUSE | Yes | 100% |
Parking filed802
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| T1 | 227 | 32 | 259 |
| T2 | 146 | 12 | 158 |
| T3 | 146 | 7 | 153 |
| M1A | 0 | 90 | 90 |
| M1B | 24 | 66 | 90 |
| M2 | 15 | 37 | 52 |
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| BHIDE GADGIL DEVELOPERS | Dhayari (Part) | Pune |
| BHIDE GADGIL ASSOCIATES | Dhayari (Part) | Pune |
| SUNIL MOHAN BHIDE | Dhayari (Part) | Pune |
| YASHODHAN SUNIL BHIDE | Dhayari (Part) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANIRUDDHA VAIDYA & ASSOCIATES |
| Engineer | Deepali Desai |
| Engineer | RUIKAR AND ASSOCIATES |
| Engineer | SW MONE AND ASSOCIATES |
| Chartered Accountant | Kapure and Kapure Chartered Accountant |
| Partner | Role in project |
|---|---|
| PARANJAPE SCHEMES (CONSTRUCTION) LTD | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterMHADA asked for revision of plans already sanctioned by PMC for Tower 1,2,3 due to which construction of MHADA building got delayed. Also there was a delay in obtaining the Environmental clearance
Reason as filed by the promoterAs prescribed under Order No 40/2022 dated 27th December 2022, we apply for extension without majority of the consents. The project was delayed for reasons beyond our control on account of various reasons. We have already received OC for 3 of the buildings and wish to complete the other 4 at the earliest.
Reason as filed by the promoterAs per attachment
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 18484/2018/2018 | Bombay High Court | Matter is kept for preadmission |
| 18481/2018/2018 | Bombay High Court | Matter is kept for preadmission |
Complaints filed with MahaRERA28
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000064304 | RAHUL BAPUSAHEB CHAVAN | PARANJAPE SCHEMES CONSTRUCTION LTD THROUGH ITS DIRECTOR THOUGH ITS AHORIZED SIGN VIKRAM GODSE | 23/06/2020 |
| CC005000000064306 | Ashwini Aashish Bhutkar | PARANJAPE SCHEMES CONSTRUCTION THROUGH ITS DIRECTOR MR. S.P. PARANJAPE | 23/06/2020 |
| CC005000000064307 | AMOD VIJAY PALANDE | PARANJAPE SCHEMES CONSTRUCTION LTD THROUGH ITS DIRECTOR MR. S.P.PARANJAPE | 23/06/2020 |
| CC005000000064312 | SAMEER MAHADEO GAIKWAD | PARANJAPE SCHEMES CONSTRUCTION LTD THOUGH ITS DIRECTOR MR.S.P.PARANJAPE | 24/06/2020 |
| CC005000000064319 | Snehal Satish Kulkarni | parajape scheme construction ltd though its director | 26/06/2020 |
| CC005000000064324 | Ruturaj Subhash Chavan | Paranjape Schemes construction ltd through its director Mr.S.P.Paranjape | 28/06/2020 |
| CC005000000064557 | Santosh Laxman Dhumal and Pratima Santosh Dhumal | Paranjape Schemes (Constructions) Ltd | 03/09/2020 |
| CC005000000064561 | Abhay Ramvilash Tapdiya | Paranjape Scheme Construction Limited | 03/09/2020 |
| CC005000000085668 | Paranjape Schemes(Construction) Limited | SUNIL KAMALKISHOR.MALU | 14/06/2021 |
| CC005000000085670 | PARANJAPE SCHEMES(CONSTRUCTION) LIMITED | BHAGCHANDANI NAVIN GYANCHAND | 14/06/2021 |
| CC005000000085693 | PARANJAPE SCHEMES(CONSTRUCTION)LIMITED | BHAGCHANDANI PADMA HARENDRA | 15/06/2021 |
| CC005000000075037 | poonam shyam Tumma | Paranjape Schemes construction ltd. throughits director Mr.S.P.Paranjape | 02/01/2021 |
| CC005000000075110 | PRAVIN SHASTRI AND KALYANI SHASTRI | PARANJAPE SCHEMES (CONSTRUCTION) LTD | 24/01/2021 |
| CC005000000075130 | Mr Rahul Vishwas Chavan through its POA Mr Vishwas Shivajirao Chavan | Paranjape Schemes construction ltd. throughits director Mr.S.P.Paranjape | 29/01/2021 |
| CC005000000075131 | Mr Rohan Vishwas Chavan | Paranjape Schemes construction ltd. throughits director Mr.S.P.Paranjape | 29/01/2021 |
| CC005000000085241 | MRS SAKSHI AMIT DESHMUKH | Paranjape Schemes construction ltd. throughits director Mr.S.P.Paranjape | 20/02/2021 |
| CC005000000085362 | Mrs Supriya Sunil Khanvilkar | Paranjape Schemes construction ltd. throughits director Mr.S.P.Paranjape | 19/03/2021 |
| CC005000000085489 | Mr Rajesh Madhukarrao Kulkarni | Paranjape Schemes construction ltd. throughits director Mr.S.P.Paranjape | 23/04/2021 |
| CC005000000085528 | MR SAKET SHAM DOSHI | Paranjape Schemes construction ltd. throughits director Mr.S.P.Paranjape | 04/05/2021 |
| CC005000000085606 | MR PURUSHOTTAM SUNIL ATHALEKAR | Paranjape Schemes construction ltd. throughits director Mr.S.P.Paranjape | 30/05/2021 |
| CC005000000095806 | Mrs. Vijaya Akash More | Paranjape Schemes (Construction) Ltd. thr. its Director a) Shrikant Paranjape b) Shashank Paranjape | 31/07/2021 |
| CC005000000096335 | Vaishali Vijay Kulkarni | Paranjape Schemes (construction) Ltd. | 03/12/2021 |
| CC005000000096228 | Milind Bhagwat | Paranjape Schemes (Construction) Ltd. | 16/11/2021 |
| CC005000000106362 | Mr Swapnil Suresh Chaudhari | Paranjape Schemes construction ltd. throughits director Mr.S.P.Paranjape | 08/12/2021 |
| CC005000000147198 | Girish Chandar Bhoite | PARANJAPE SCHEMES (CONSTRUCTION) LTD | 05/06/2022 |
| CC005000000147224 | Amit Kumar | M/s Paranjape Scheme ConstructionLtd | 04/10/2023 |
| CC12400717 | Shripad Anil Joshi | PARANJAPE SCHEMES (CONSTRUCTION) LTD | 09/11/2024 |
| CC12502904 | SANDEEP SAMPAT DEVRE | PARANJAPE SCHEMES (CONSTRUCTION) LTD | 19/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Jun 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 May 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Feb 2024
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Abhiruchi Parisar-T1 and Others-Mar'25-uploaded.pdf | 8 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Abhiruchi Parisar T-1 Others-MAR'25-uploaded.pdf | 8 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera form2 Abhiruchi T1 and others DEC 24 Signoff-compressed-uploaded.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Report-Abhiruchi Parisar-Dec'24-uploaded.pdf | 16 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Abhiruchi Parisar-T1 T2 M1 and others-Dec'24-uploaded.pdf | 15 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Abhiruchi Parisar -Mar'24-uploaded.pdf | 11 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Abhiruchi -June'24-uplaoded.pdf | 11 Jan 2025 |
| Declaration in FORM BFile: Form B-Abhiruchi Parisar-Exten-Order 40.pdf | 27 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-Abhiruchi T1 n others-FY 23'24-uploaded.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Abhiruchi Parisar-Sept'24-uploaded.pdf | 17 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Abhiruchi Parisar T1T2T3 M1A M1B M2-Sept'24-uploaded.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure -Abhiruchi Parisar-T1T2T3M1A M1BM2-Sept'24-uploaded.pdf | 17 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PAB-Rera Form 1-Mar2019.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure -sold unsold-Abhiruchi Parisar-June'24-uploaded.pdf | 15 Jul 2024 |
| Layout approvalFile: Abhiruchi plans 2022-compressed-uploaded.pdf | 10 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Abhiruchi plans 2022-compressed-uploaded.pdf | 10 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Form 2- Abhiruchi Parisar T1 and others-June'24-uploaded.pdf | 6 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 21 Paranjape Abhiruchi Parisar T123,M1AM1b M2-FORM 1-June'24-uploaded.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory report-Abhiruchi T1T2T3-Mar'24-uploaded.pdf | 17 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Paranjape Abhiruchi Parisar-T123 M1A, M1B M2-Mar'24-uploaded.pdf | 10 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- ABHIRUCHI T123-Mar'24-uploaded.pdf | 4 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Completeion Certificate M1A-23-10-2020.pdf | 16 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3 Compln Certi- Tower-3 and Mhada M1B-Abhiruchi-05Feb24-compressed.pdf | 16 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Abhiruchi Parisar T1 to T3 and Mhada-uploaded.pdf | 10 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Abhiruchi Parisar-Dec'23-uploaded.pdf | 3 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate -Bldg 2A 2B-5 Apr2021.pdf | 3 Jan 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate-Abhiruchi Parisar M1A- 28-11-2023.pdf | 29 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Abhiruchi ParisarT1T2T3-Sept'23-uploaded.pdf | 11 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-Abhiruchi Parisar T123 M1AB M2-Fy-22'23-uploaded11oct23.pdf | 11 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Abhiruchi Parisar-M1B and T3 only-June'23.pdf | 26 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Abhiruchi Parisar-June 23.pdf | 7 Jul 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 18 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Fy 19 20 Abhiruchi.pdf | 18 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Fy 20 21 Abhiruchi.pdf | 18 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Fy 21 22 Abhiruchi.pdf | 18 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Abhiruchi Parisar.pdf | 18 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5).pdf | 13 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Abhiruchi Prisar-Form 5-FY 21-22.pdf | 23 Feb 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Index II Abhiruchi T2 Cond formation.pdf | 12 Dec 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Index II Abhiruchi T1Condo Formation.pdf | 12 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: PAP Inventory data June 2022.pdf | 19 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Abhiruchi Parisar-min_compressed.pdf | 25 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2 RERA Abhirichi compressed.pdf | 1 Apr 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: Abhiruchi part completion and Form 4.pdf | 29 Oct 2020 |
| Proforma of Allotment letterFile: Abhiruchi AGR TO SALE RERA_MHADA BLD M1AM1BM2 FINAL 24Oct2019 uploaded.pdf | 12 Nov 2019 |
| Certificates of CA (Form 5)File: Abhiruchi Parisar_Form 5_18-19.pdf | 7 Oct 2019 |
| Layout approvalFile: Layout Plan 15 May 2019.pdf | 28 May 2019 |
| Copy of Layout Approval (in case of layout)File: Layout Plan 15 May 2019.pdf | 28 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 15 May 2019.pdf | 28 May 2019 |
| Certificates of CA (Form 5)File: Paranjape Abhiruchi Parisar.pdf | 6 Oct 2018 |
| OtherFile: Environmental Clearance_Abhiruchi Parisar_04-05-2018.pdf | 12 Jul 2018 |
| Layout approvalFile: Sacntion Layout Abhiruchi Parisar.pdf | 12 Jul 2017 |
| PAN CardFile: List of Directors and pan_Abhiruchi.pdf | 12 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Sacntion Layout Abhiruchi Parisar.pdf | 12 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 PARANJAPE ABHIRUCHI PARISAR.PDF | 12 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3_Abhiruchi Parisar.pdf | 12 Jul 2017 |
| Declaration in FORM BFile: Form B_Abhiruchi Parisar_Promoters.pdf | 5 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer's certificate Abhiruchi parisar.pdf | 1 Jul 2017 |
| Copy of the legal title reportFile: Abhiruchi_Title Certificate.pdf | 26 Jun 2017 |
| Details of encumbrancesFile: Abhiruchi_Encumbrance Certificate.pdf | 26 Jun 2017 |
| Proforma of Allotment letterFile: Abhiruchi allotment letter and agreement for sale.pdf | 26 Jun 2017 |
| Building plan approvalFile: Sacntion Layout Page 1 Abhiruchi.pdf | 22 Jun 2017 |
| Building Plan Approval (IOD)File: Sacntion Layout Page 1 Abhiruchi.pdf | 22 Jun 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-ilovepdf-compressed.pdf | 22 Jun 2017 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| 127 UPPER EASTP51800000454 | Andheri, Mumbai Suburban | - | Jul 2017 | Completed | Jun 2024Registered original: Dec 2019 | Jan 1970 |
| PRATHAM RESIDENTIAL | 727 SADASHIV PETH KUMTHEKAR ROAD PUNE 411030 | 35 | - | Completed | Apr 2016 | Mar 2016 |
| THE BUSINESS HUB | SURVEY NO25 HISSA NO 29 HISSA NO 1 KOTHRUD PUNE 411029 | 86 | - | Completed | Jan 2016 | Nov 2015 |
| MADHUKOSH - III | SNo4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune | 258 | - | Completed | Aug 2015 | Aug 2015 |
| PRATHAM COMMERCIAL | 727 SADASHIV PETH KUMTHEKAR ROAD PUNE 411030 | 32 | - | Completed | Jun 2015 | Apr 2015 |
| PUNARVASU | PRABHAT ROAD ERANDWANE PUNE 411004 | 10 | - | Completed | Dec 2014 | Late, Jun 2015 |
| MADHUKOSH - II | SNo4 HISSA NO 2 SNO 16 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune | 150 | - | Completed | Dec 2013 | Oct 2013 |
| MADHUKOSH - I | SNo 4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune | 289 | - | Completed | Mar 2012 | Feb 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 28 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 64 filed documents as one ZIP, foldered, with a manifest
Keep Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dhayari13,700+ in Pune
Filed coordinates, straight-line distance. 179 registered projects within 2 km.
VYANA PHASE-I -T5, T6, T7
KOLTE-PATIL DEVELOPERS LIMITED
Pratham Vihar Phase I
LJR Constructions LLP
VYANA PHASE-I-T2,T3 AT THE RESERVE
KOLTE-PATIL DEVELOPERS LIMITED
MAITREE MEGA CITY
MAITREE INFRA
RAMANA MYRA
SAI AND SHANTISHOBHA VENTURE
Apple Regency
Sri Sidhievinayak associetes
Builder: PARANJAPE SCHEMES (CONSTRUCTION) LTD
PARANJAPE SCHEMES (CONSTRUCTION) LTD has 29 registrations on MahaRERA, including SWAPNASAMRAT and Blue Ridge Project C Land T18 and T19. Its filings disclose 17 earlier MahaRERA projects: declares 9 of 17 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2 is delayed beyond 28 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?
The registered promoter entity is PARANJAPE SCHEMES (CONSTRUCTION) LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?
The professionals named in the filing: Architect: ANIRUDDHA VAIDYA & ASSOCIATES; Engineer: Deepali Desai; Engineer: RUIKAR AND ASSOCIATES; Engineer: SW MONE AND ASSOCIATES; Chartered Accountant: Kapure and Kapure Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback