Red flags

  • 28 complaints at MahaRERA
  • Completion date moved by 51 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
51 of 66Construction stages doneacross 6 buildings; furthest along: Sanitary Fittings within the flats /..., 98%
28Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2 is a Others project by PARANJAPE SCHEMES (CONSTRUCTION) LTD in Pune, Maharashtra, registered with MahaRERA as P52100000452 on 18 Jul 2017. The registration is recorded completed; possession was promised by 28 Mar 2025. The completion date has moved by 51 months from the original filing. 28 complaints are on record with the regulator.

At a glance

Project

  • NameParanjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2
  • TypeOthers
  • Location
    • Nahre industrial estate Road
    • Dhayari
    • Dhayari (Part)
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000452
  • ReraGenie IDRG-MH-02276

Builder

  • NamePARANJAPE SCHEMES (CONSTRUCTION) LTD
  • Entity typeCompany
  • ChairpersonSHRIKANT PURUSHOTTAM PARANJAPE
  • Managing DirectorSHASHANK PURUSHOTTAM PARANJAPE
  • Other registrations28 more →
  • Completed15 of 29
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects17 →

Key dates

this monthRegisteredJul 2017First promiseDec 2020Revised toMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jul 2017
  • Promised completion28 Mar 2025
  • Revised completionRevised to 28 Mar 2025 (originally 31 Dec 2020)
  • Buildings6 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T1NA1717000
T2NA1717000
T3NA1818000
M1ANA1212000
M1BNA1212000
M2NA1212000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 8 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

51 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.

T1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
T298%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)75%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
T3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
M1A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
M1B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
M20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 8 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes100%
SWIMMING POOLYes100%
CLUB HOUSEYes100%

Parking filed802

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots802
Closed/Covered558
Open Space244
BuildingClosed/CoveredOpen SpaceTotal
T122732259
T214612158
T31467153
M1A09090
M1B246690
M2153752

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area26,905 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
BHIDE GADGIL DEVELOPERSDhayari (Part)Pune
BHIDE GADGIL ASSOCIATESDhayari (Part)Pune
SUNIL MOHAN BHIDEDhayari (Part)Pune
YASHODHAN SUNIL BHIDEDhayari (Part)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI45734.82
Proposed, not sanctioned45,735 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHADARKAR ROAD, PUNE

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIRUDDHA VAIDYA & ASSOCIATES
EngineerDeepali Desai
EngineerRUIKAR AND ASSOCIATES
EngineerSW MONE AND ASSOCIATES
Chartered AccountantKapure and Kapure Chartered Accountant
PartnerRole in project
PARANJAPE SCHEMES (CONSTRUCTION) LTD-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005591Dec 2020 → Dec 2021

Reason as filed by the promoterMHADA asked for revision of plans already sanctioned by PMC for Tower 1,2,3 due to which construction of MHADA building got delayed. Also there was a delay in obtaining the Environmental clearance

EXT52100015074Dec 2020 → Dec 2024

Reason as filed by the promoterAs prescribed under Order No 40/2022 dated 27th December 2022, we apply for extension without majority of the consents. The project was delayed for reasons beyond our control on account of various reasons. We have already received OC for 3 of the buildings and wish to complete the other 4 at the earliest.

EXT52100025851Dec 2020 → Mar 2025

Reason as filed by the promoterAs per attachment

Litigation declared2

CaseCourtStatus
18484/2018/2018Bombay High CourtMatter is kept for preadmission
18481/2018/2018Bombay High CourtMatter is kept for preadmission

Complaints filed with MahaRERA28

Case no.ComplainantRespondentFiled
CC005000000064304RAHUL BAPUSAHEB CHAVANPARANJAPE SCHEMES CONSTRUCTION LTD THROUGH ITS DIRECTOR THOUGH ITS AHORIZED SIGN VIKRAM GODSE23/06/2020
CC005000000064306Ashwini Aashish BhutkarPARANJAPE SCHEMES CONSTRUCTION THROUGH ITS DIRECTOR MR. S.P. PARANJAPE23/06/2020
CC005000000064307AMOD VIJAY PALANDEPARANJAPE SCHEMES CONSTRUCTION LTD THROUGH ITS DIRECTOR MR. S.P.PARANJAPE23/06/2020
CC005000000064312SAMEER MAHADEO GAIKWADPARANJAPE SCHEMES CONSTRUCTION LTD THOUGH ITS DIRECTOR MR.S.P.PARANJAPE24/06/2020
CC005000000064319Snehal Satish Kulkarniparajape scheme construction ltd though its director26/06/2020
CC005000000064324Ruturaj Subhash ChavanParanjape Schemes construction ltd through its director Mr.S.P.Paranjape28/06/2020
CC005000000064557Santosh Laxman Dhumal and Pratima Santosh DhumalParanjape Schemes (Constructions) Ltd03/09/2020
CC005000000064561Abhay Ramvilash TapdiyaParanjape Scheme Construction Limited03/09/2020
CC005000000085668Paranjape Schemes(Construction) LimitedSUNIL KAMALKISHOR.MALU14/06/2021
CC005000000085670PARANJAPE SCHEMES(CONSTRUCTION) LIMITEDBHAGCHANDANI NAVIN GYANCHAND14/06/2021
CC005000000085693PARANJAPE SCHEMES(CONSTRUCTION)LIMITEDBHAGCHANDANI PADMA HARENDRA15/06/2021
CC005000000075037poonam shyam TummaParanjape Schemes construction ltd. throughits director Mr.S.P.Paranjape02/01/2021
CC005000000075110PRAVIN SHASTRI AND KALYANI SHASTRIPARANJAPE SCHEMES (CONSTRUCTION) LTD24/01/2021
CC005000000075130Mr Rahul Vishwas Chavan through its POA Mr Vishwas Shivajirao ChavanParanjape Schemes construction ltd. throughits director Mr.S.P.Paranjape29/01/2021
CC005000000075131Mr Rohan Vishwas ChavanParanjape Schemes construction ltd. throughits director Mr.S.P.Paranjape29/01/2021
CC005000000085241MRS SAKSHI AMIT DESHMUKHParanjape Schemes construction ltd. throughits director Mr.S.P.Paranjape20/02/2021
CC005000000085362Mrs Supriya Sunil KhanvilkarParanjape Schemes construction ltd. throughits director Mr.S.P.Paranjape19/03/2021
CC005000000085489Mr Rajesh Madhukarrao KulkarniParanjape Schemes construction ltd. throughits director Mr.S.P.Paranjape23/04/2021
CC005000000085528MR SAKET SHAM DOSHIParanjape Schemes construction ltd. throughits director Mr.S.P.Paranjape04/05/2021
CC005000000085606MR PURUSHOTTAM SUNIL ATHALEKARParanjape Schemes construction ltd. throughits director Mr.S.P.Paranjape30/05/2021
CC005000000095806Mrs. Vijaya Akash MoreParanjape Schemes (Construction) Ltd. thr. its Director a) Shrikant Paranjape b) Shashank Paranjape31/07/2021
CC005000000096335Vaishali Vijay KulkarniParanjape Schemes (construction) Ltd.03/12/2021
CC005000000096228Milind BhagwatParanjape Schemes (Construction) Ltd.16/11/2021
CC005000000106362Mr Swapnil Suresh ChaudhariParanjape Schemes construction ltd. throughits director Mr.S.P.Paranjape08/12/2021
CC005000000147198Girish Chandar BhoitePARANJAPE SCHEMES (CONSTRUCTION) LTD05/06/2022
CC005000000147224Amit KumarM/s Paranjape Scheme ConstructionLtd04/10/2023
CC12400717Shripad Anil JoshiPARANJAPE SCHEMES (CONSTRUCTION) LTD09/11/2024
CC12502904SANDEEP SAMPAT DEVREPARANJAPE SCHEMES (CONSTRUCTION) LTD19/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jun 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 May 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Feb 2024

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Abhiruchi Parisar-T1 and Others-Mar'25-uploaded.pdf8 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Abhiruchi Parisar T-1 Others-MAR'25-uploaded.pdf8 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera form2 Abhiruchi T1 and others DEC 24 Signoff-compressed-uploaded.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory Report-Abhiruchi Parisar-Dec'24-uploaded.pdf16 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Abhiruchi Parisar-T1 T2 M1 and others-Dec'24-uploaded.pdf15 Jan 2025
Certificates of CA (Form 3)File: Form 3 Abhiruchi Parisar -Mar'24-uploaded.pdf11 Jan 2025
Certificates of CA (Form 3)File: Form 3 Abhiruchi -June'24-uplaoded.pdf11 Jan 2025
Declaration in FORM BFile: Form B-Abhiruchi Parisar-Exten-Order 40.pdf27 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-Abhiruchi T1 n others-FY 23'24-uploaded.pdf19 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Abhiruchi Parisar-Sept'24-uploaded.pdf17 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Abhiruchi Parisar T1T2T3 M1A M1B M2-Sept'24-uploaded.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure -Abhiruchi Parisar-T1T2T3M1A M1BM2-Sept'24-uploaded.pdf17 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PAB-Rera Form 1-Mar2019.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure -sold unsold-Abhiruchi Parisar-June'24-uploaded.pdf15 Jul 2024
Layout approvalFile: Abhiruchi plans 2022-compressed-uploaded.pdf10 Jul 2024
Copy of Layout Approval (in case of layout)File: Abhiruchi plans 2022-compressed-uploaded.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Form 2- Abhiruchi Parisar T1 and others-June'24-uploaded.pdf6 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 21 Paranjape Abhiruchi Parisar T123,M1AM1b M2-FORM 1-June'24-uploaded.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory report-Abhiruchi T1T2T3-Mar'24-uploaded.pdf17 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Paranjape Abhiruchi Parisar-T123 M1A, M1B M2-Mar'24-uploaded.pdf10 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- ABHIRUCHI T123-Mar'24-uploaded.pdf4 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Completeion Certificate M1A-23-10-2020.pdf16 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3 Compln Certi- Tower-3 and Mhada M1B-Abhiruchi-05Feb24-compressed.pdf16 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Abhiruchi Parisar T1 to T3 and Mhada-uploaded.pdf10 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Abhiruchi Parisar-Dec'23-uploaded.pdf3 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate -Bldg 2A 2B-5 Apr2021.pdf3 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate-Abhiruchi Parisar M1A- 28-11-2023.pdf29 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Abhiruchi ParisarT1T2T3-Sept'23-uploaded.pdf11 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-Abhiruchi Parisar T123 M1AB M2-Fy-22'23-uploaded11oct23.pdf11 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Abhiruchi Parisar-M1B and T3 only-June'23.pdf26 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Abhiruchi Parisar-June 23.pdf7 Jul 2023
Declaration about Commencement CertificateFile: Format D.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Fy 19 20 Abhiruchi.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Fy 20 21 Abhiruchi.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Fy 21 22 Abhiruchi.pdf18 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Abhiruchi Parisar.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5).pdf13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Abhiruchi Prisar-Form 5-FY 21-22.pdf23 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Index II Abhiruchi T2 Cond formation.pdf12 Dec 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Index II Abhiruchi T1Condo Formation.pdf12 Dec 2022
Disclosure of sold/ booked inventoryFile: PAP Inventory data June 2022.pdf19 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Abhiruchi Parisar-min_compressed.pdf25 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2 RERA Abhirichi compressed.pdf1 Apr 2021
Architect’s Certificate on Completion of Project (Form 4)File: Abhiruchi part completion and Form 4.pdf29 Oct 2020
Proforma of Allotment letterFile: Abhiruchi AGR TO SALE RERA_MHADA BLD M1AM1BM2 FINAL 24Oct2019 uploaded.pdf12 Nov 2019
Certificates of CA (Form 5)File: Abhiruchi Parisar_Form 5_18-19.pdf7 Oct 2019
Layout approvalFile: Layout Plan 15 May 2019.pdf28 May 2019
Copy of Layout Approval (in case of layout)File: Layout Plan 15 May 2019.pdf28 May 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 15 May 2019.pdf28 May 2019
Certificates of CA (Form 5)File: Paranjape Abhiruchi Parisar.pdf6 Oct 2018
OtherFile: Environmental Clearance_Abhiruchi Parisar_04-05-2018.pdf12 Jul 2018
Layout approvalFile: Sacntion Layout Abhiruchi Parisar.pdf12 Jul 2017
PAN CardFile: List of Directors and pan_Abhiruchi.pdf12 Jul 2017
Copy of Layout Approval (in case of layout)File: Sacntion Layout Abhiruchi Parisar.pdf12 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 PARANJAPE ABHIRUCHI PARISAR.PDF12 Jul 2017
Certificates of CA (Form 3)File: Form 3_Abhiruchi Parisar.pdf12 Jul 2017
Declaration in FORM BFile: Form B_Abhiruchi Parisar_Promoters.pdf5 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer's certificate Abhiruchi parisar.pdf1 Jul 2017
Copy of the legal title reportFile: Abhiruchi_Title Certificate.pdf26 Jun 2017
Details of encumbrancesFile: Abhiruchi_Encumbrance Certificate.pdf26 Jun 2017
Proforma of Allotment letterFile: Abhiruchi allotment letter and agreement for sale.pdf26 Jun 2017
Building plan approvalFile: Sacntion Layout Page 1 Abhiruchi.pdf22 Jun 2017
Building Plan Approval (IOD)File: Sacntion Layout Page 1 Abhiruchi.pdf22 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: CC-ilovepdf-compressed.pdf22 Jun 2017

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
127 UPPER EASTP51800000454Andheri, Mumbai Suburban-Jul 2017CompletedJun 2024Registered original: Dec 2019Jan 1970
PRATHAM RESIDENTIAL727 SADASHIV PETH KUMTHEKAR ROAD PUNE 41103035-CompletedApr 2016Mar 2016
THE BUSINESS HUBSURVEY NO25 HISSA NO 29 HISSA NO 1 KOTHRUD PUNE 41102986-CompletedJan 2016Nov 2015
MADHUKOSH - IIISNo4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune258-CompletedAug 2015Aug 2015
PRATHAM COMMERCIAL727 SADASHIV PETH KUMTHEKAR ROAD PUNE 41103032-CompletedJun 2015Apr 2015
PUNARVASUPRABHAT ROAD ERANDWANE PUNE 41100410-CompletedDec 2014Late, Jun 2015
MADHUKOSH - IISNo4 HISSA NO 2 SNO 16 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune150-CompletedDec 2013Oct 2013
MADHUKOSH - ISNo 4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune289-CompletedMar 2012Feb 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 51 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhayari13,700+ in Pune

2 kmParanjape Abhiruchi PariCompleted 61Lapsed / revoked 33Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 179 registered projects within 2 km.

Builder: PARANJAPE SCHEMES (CONSTRUCTION) LTD

PARANJAPE SCHEMES (CONSTRUCTION) LTD has 29 registrations on MahaRERA, including SWAPNASAMRAT and Blue Ridge Project C Land T18 and T19. Its filings disclose 17 earlier MahaRERA projects: declares 9 of 17 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2 is delayed beyond 28 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?

The registered promoter entity is PARANJAPE SCHEMES (CONSTRUCTION) LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?

The professionals named in the filing: Architect: ANIRUDDHA VAIDYA & ASSOCIATES; Engineer: Deepali Desai; Engineer: RUIKAR AND ASSOCIATES; Engineer: SW MONE AND ASSOCIATES; Chartered Accountant: Kapure and Kapure Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.