ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD.

Registered No litigation declared Residential / Group Housing project

PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD.

By JIVDANI REALITY

RG-MH-06476 · RERA P99000053806 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • 8 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Installation of Lifts, 50%
65 of 105Units unsoldnot recorded sold or booked
8Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD. is a Residential / Group Housing project by JIVDANI REALITY in Palghar, Maharashtra, registered with MahaRERA as P99000053806 on 1 Dec 2023. Possession is promised by 4 Oct 2027. 40 of the 105 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 8 complaints are on record with the regulator.

At a glance

Project

  • NamePANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD.
  • TypeResidential / Group Housing
  • Location
    • ACHOLE ROAD
    • VASAI
    • Vasai-Virar City (M Corp)
    • Palghar
    • 401209
  • Pincode401209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000053806
  • ReraGenie IDRG-MH-06476

Builder

  • NameJIVDANI REALITY
  • Entity typePartnership
  • PartnersMANOHAR JANARDHAN PATIL, MANISH MANOHAR PATIL, ROHAN PANDURANG PATIL, PAYAL AJAY SHUKLA

Key dates

this monthRegisteredDec 2023PromisedOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Dec 2023
  • Promised completion4 Oct 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed52 files

Current status

38%40 of 105 units booked
75.0%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PANCHAM PARKNA16168322105

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 50%.

PANCHAM PARK: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed124

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots124
Closed/Covered1
Open Space123

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,567 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTDVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai-Virar City Municipal Corporation
Permissible FSI6131.27
Proposed, not sanctioned6,131 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchASTER APARTMENT VIVA SUPER MARKET NALLASOPARA WEST
Estimated costRs 16.48 cr
Cost incurredRs 12.36 cr
Work done75.01%
BuildingWingEstimatedIncurred
PANCHAM PARKNARs 14.83 crRs 12.36 cr
-NARs 1.65 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH KEKRE
EngineerLATA & ASSOCIATES
Chartered Accountantvikas shukla & company
PartnerRole in project
JIVDANI REALITY-

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC12500720ARUN LAXMAN PATILJIVDANI REALITY02/03/2025
CC12500780Prabhakar Babaji KhakeJIVDANI REALITY07/03/2025
CC12500784Arun Laxman PatilJIVDANI REALITY07/03/2025
CC12500790USHA BACHCHAN SINGHJIVDANI REALITY08/03/2025
CC12500791Jyoti Sanjay GalaJIVDANI REALITY08/03/2025
CC12500803Bhushan Bhalchandra MhatreJIVDANI REALITY09/03/2025
CC12500804Sushma Odathkkal PeterJIVDANI REALITY09/03/2025
CC12500805Deepa Moreshwar PatilJIVDANI REALITY09/03/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 4 Oct 2027

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 MARCH 2026 (4).pdf12 May 2026
Withdrawal Update Form 2File: Form-2 Dec 2025.pdf12 May 2026
Withdrawal Update Form 3File: Form-3 March 2026 (3).pdf12 May 2026
Withdrawal Update Form 1File: Form-1 Sep 2025.pdf28 Feb 2026
Withdrawal Update Form 1File: Form-1 Dec 2025.pdf28 Feb 2026
Withdrawal Update Form 2File: Form-2 Sep 2025.pdf28 Feb 2026
Withdrawal Update Form 2File: Form-2 Dec 2025.pdf28 Feb 2026
Withdrawal Update Form 3File: Form-3 Sep 2025.pdf28 Feb 2026
Withdrawal Update Form 3File: Form-3 Dec 2025.pdf28 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf12 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: form 5.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 320250505_10482385.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 REARA 20250201_16364603.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PANCHAM PARK FORM 1.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 320241123_10492053.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 320241123_10584810.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 320241123_11064002.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 320241123_11144889.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CERTIFICATE RERA PANCHAM PARK20240401_18013638.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate-Pancham Park form 3_compressed.pdf10 Apr 2024
Details of encumbrances concerned to FinanceFile: NO LITIGATION.pdf22 Nov 2023
Details of encumbrances concerned to LegalFile: NO LITIGATION.pdf22 Nov 2023
Deviation Report with respect to Allotment letterFile: ALLOTMENT LATTER.pdf22 Nov 2023
Deviation Report with respect to Allotment letterFile: ALLOTMENT LATTER 02.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf14 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A Disclosure of interest.pdf14 Nov 2023
Proforma of Allotment letterFile: 000-Allottment Letter Pancham Park (1).pdf14 Nov 2023
Proforma of Agreement for saleFile: 000-Pancham Park.pdf14 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A.pdf14 Nov 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATIOVN REPORT WITHRESPECT TO THE AGREEMENT OF SALE.pdf14 Nov 2023
Details of encumbrances concerned to FinanceFile: DECLATION OF FINANCE.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: DECLATION OF FINANCE.pdf26 Oct 2023
Declaration about Commencement CertificateFile: format - D.pdf26 Oct 2023
CERSAI detailsFile: declaration of securitisation.pdf26 Oct 2023
Other - FinanceFile: about criminal proceeding.pdf26 Oct 2023
Other - TechnicalFile: self certified copy.pdf26 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC PANCHAM PARK 1 (1).pdf17 Oct 2023
Building plan approvalFile: Building Plan Approval.pdf16 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf16 Oct 2023
Layout approvalFile: APPROVED FLOOR PLAN (1).pdf13 Oct 2023
Copy of Layout Approval (in case of layout)File: APPROVED FLOOR PLAN (1).pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf13 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold.pdf13 Oct 2023
PAN CardFile: PAN CARD20231012_16261110.pdf12 Oct 2023
Copy of the legal title reportFile: TITLE CLEARNCE CERTIFICATE.pdf12 Oct 2023
Declaration in FORM BFile: FORM B.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICTE.pdf12 Oct 2023

How this compares with Palghar

38%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI3,200+ in Palghar

2 kmPANCHAM PARK CO-OPERATIVCompleted 46Lapsed / revoked 33Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 138 registered projects within 2 km.

Builder: JIVDANI REALITY

JIVDANI REALITY has 1 registration on MahaRERA, including PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD.. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD. is delayed beyond 4 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD.?

The registered promoter entity is JIVDANI REALITY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD.?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD.?

The professionals named in the filing: Architect: UMESH KEKRE; Engineer: LATA & ASSOCIATES; Chartered Accountant: vikas shukla & company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LTD.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PANCHAM PARK CO-OPERATIVE HOUSING SOCIETY LT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.