PALTE PARADISE

By UNITED DEVELOPERS

RG-MH-05987 · RERA P52000077100 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
77 of 81Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

PALTE PARADISE is a Others project by UNITED DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000077100 on 23 Jul 2024. Possession is promised by 31 Dec 2028. 4 of the 81 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NamePALTE PARADISE
  • TypeOthers
  • Location
    • Badlapur Neral Road
    • Mamdapur
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000077100
  • ReraGenie IDRG-MH-05987

Builder

  • NameUNITED DEVELOPERS
  • Entity typePartnership
  • PartnersNIZAMUDDIN LUDUR ANSARI, SULAIMAN IBRAHIM SHAIKH, SHAKIB MUSTAFA PALTE, PARVEZ HAJIMIYA PALTE, NAVID HAJIMIYA PALTE, AHMADI SHABBIR PALTE, MUJEEB BADRUDDIN ANSARI, GULNAR ASMAT FANGARI, MALIKA NAZIR CHEULKAR, MEHMUDA PARVEZ DAMAD, NASIMA FAKIR MAHAMAD PALTE, BADRUNNISA HAZIMIYA PALTE and 7 more
  • Other registrations7 more →
  • Completed3 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed62 files

Current status

5%4 of 81 units booked

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1NA5536945
BUILDING 2NA6028230
BUILDING 3NA30606

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

BUILDING 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed65

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots65
Closed/Covered14
Open Space51
BuildingClosed/CoveredOpen SpaceTotal
BUILDING 172128
BUILDING 252227
BUILDING 32810

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,960 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Aug 2025

Approvals and building plan

Sanctioning authorityZP Alibag
Permissible FSI4767.94
Proposed, not sanctioned4,768 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKausa, Mumbra, Thane

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUJATAMHATRE
EngineerMIHIR ARUN MHATRE
Chartered AccountantS R SIDDIQUI & CO
Chartered AccountantSAUD AHMED SHAMIM AKHTAR ANSARI
Chartered AccountantN N Bagwan and Associates
PartnerRole in project
UNITED DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM-1 ARCHITECT CERT.pdf25 Apr 2026
Form 2File: FORM-2 ENGINEER CERTIFIATE.pdf25 Apr 2026
Form 3File: FORM-3 CA CERTIFICATE.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: 1 Disc of Booking.pdf25 Apr 2026
Form 1File: ARCHITECTS CERTIFICATE 30-12-2025.pdf15 Apr 2026
Form 2File: ENGINEERS CERTIFICATE.pdf15 Apr 2026
Form 3File: FORM-3.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of Booked Inventory.pdf15 Apr 2026
Form 5 (FY 2024-2025)File: United Developers Form 5 .pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disc of Inventory Sold.pdf10 Oct 2025
Form 1File: FORM-1.pdf10 Oct 2025
Form 2File: FORM-2.pdf10 Oct 2025
Form 3File: FORM-3.pdf10 Oct 2025
Form 1File: FORM-1 SIGNED.pdf4 Aug 2025
Form 2File: FORM -2 ENG CERT SIGNED.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disc of Sold inventory.pdf4 Aug 2025
Form 3File: FORM-3 CA CERT.pdf4 Aug 2025
Form 1File: FORM 1-SIGNED.pdf21 Jun 2025
Form 2File: FORM-2 SIGNED.pdf21 Jun 2025
Form 3File: FORM-3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: disc of sold inventory.pdf21 Jun 2025
Form 1File: FORM 1-SIGNED.pdf5 Jun 2025
Form 2File: form 2 united developers 21 4 25.pdf5 Jun 2025
Form 3File: FORM-3 CA CERT.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: FORM 3 CA CERT..pdf5 Jun 2025
OthersFile: DISCLOSURE OF INVENTORY.pdf5 Jun 2025
Form 1File: FORM 1-SIGNED.pdf3 Jun 2025
Copy of the legal title reportFile: TITLE.pdf2 Jul 2024
Other - LegalFile: admission deed_1 (9 files merged).pdf2 Jul 2024
Other - LegalFile: KHAREDIKAT 1.pdf2 Jul 2024
Other - LegalFile: KHAREDIKAT 2.pdf2 Jul 2024
Other - LegalFile: 7-12.pdf2 Jul 2024
Other - LegalFile: Disclouser of Interest in other real estate organization.pdf2 Jul 2024
Other - TechnicalFile: ANNEXURE -A.pdf2 Jul 2024
Other - TechnicalFile: CC EMail.pdf1 Mar 2024
Other - TechnicalFile: Declaration Order 50.pdf1 Mar 2024
Other - LegalFile: 7-12.pdf10 Feb 2024
Declaration about Commencement CertificateFile: Declaration Certificate CC Latest.pdf8 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Org.pdf8 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Latest.pdf24 Jun 2023
Declaration in FORM BFile: Form B.pdf1 Jun 2023
CERSAI detailsFile: CERSAI Report.pdf1 Jun 2023
Proforma of Allotment letterFile: Allotment Letter.pdf1 Jun 2023
Building plan approvalFile: B Plan.pdf30 May 2023
Layout approvalFile: B-1.pdf30 May 2023
Layout approvalFile: B-2.pdf30 May 2023
Layout approvalFile: B-3.pdf30 May 2023
Details of encumbrances concerned to FinanceFile: Non Encumbrances Finance.pdf30 May 2023
Details of encumbrances concerned to FinanceFile: Non Encumbrances Legal.pdf30 May 2023
Details of encumbrances concerned to LegalFile: Non Encumbrances Finance.pdf30 May 2023
Details of encumbrances concerned to LegalFile: Non Encumbrances Legal.pdf30 May 2023
Copy of Layout Approval (in case of layout)File: B-1.pdf30 May 2023
Copy of Layout Approval (in case of layout)File: B-2.pdf30 May 2023
Copy of Layout Approval (in case of layout)File: B-3.pdf30 May 2023
Building Plan Approval / NA Order for plotted developmentFile: B Plan.pdf30 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf30 May 2023
Proforma of Agreement for saleFile: Model form of Agreement.pdf30 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf30 May 2023
Deviation Report with respect to Allotment letterFile: Declaration Allotment Letter.pdf30 May 2023
Deviation Report with respect to model copy of AgreementFile: Declaration Model Agreement.pdf30 May 2023
PAN CardFile: PAN.pdf27 May 2023

How this compares with Raigarh

5%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PALTE PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mamdapur5,900+ in Raigarh

2 kmPALTE PARADISECompleted 78Lapsed / revoked 45Other 57Dot size: filed unitsN

Filed coordinates, straight-line distance. 180 registered projects within 2 km.

Builder: UNITED DEVELOPERS

UNITED DEVELOPERS has 8 registrations on MahaRERA, including UNITY HEIGHTS and M/S SIDDHIVINAYAK COOPERATIVE HOUSING SOCIETY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if PALTE PARADISE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PALTE PARADISE?

The registered promoter entity is UNITED DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PALTE PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PALTE PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PALTE PARADISE?

The professionals named in the filing: Architect: SUJATAMHATRE; Engineer: MIHIR ARUN MHATRE; Chartered Accountant: S R SIDDIQUI & CO; Chartered Accountant: SAUD AHMED SHAMIM AKHTAR ANSARI; Chartered Accountant: N N Bagwan and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PALTE PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PALTE PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PALTE PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.