Home / Browse projects / Thane, Maharashtra / PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T
PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T
By Palava Dwellers Private Limited
RG-MH-09464 · RERA P51700000419 · Last updated on MahaRERA portal: 28 May 2024
Source: official MahaRERA filing
Red flags
- 4 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T is a Residential / Group Housing project by Palava Dwellers Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700000419 on 17 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2019. 4 complaints are on record with the regulator.
At a glance
Project
- NamePALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T
- TypeResidential / Group Housing
- Location
- Kalyan-Shilphata Road
- Palava
- Khoni
- Kalyan
- Thane
- 421202
- Pincode421202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700000419
- ReraGenie IDRG-MH-09464
Builder
- NamePalava Dwellers Private Limited
- Entity typeCompany
- CINL45200MH1995PLC093041
- GSTIN27AAACL1490J1ZG
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- ChairpersonsPIYUSH VORA, PIYUSH VORA, PIYUSH VORA
- Other registrations54 more →
- Completed51 of 55
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Jul 2017
- Promised completion30 Jun 2019
- Revised completionNone
- Buildings26 building records
- Documents filed113 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| EVIVA K | NA | 18 | 0 | 0 | 0 | 0 |
| EVIVA L | NA | 18 | 0 | 0 | 0 | 0 |
| EVIVA M | NA | 18 | 0 | 0 | 0 | 0 |
| EVIVA N | NA | 18 | 0 | 0 | 0 | 0 |
| EVIVA O | NA | 18 | 0 | 0 | 0 | 0 |
| EVIVA P | NA | 18 | 0 | 0 | 0 | 0 |
| EVIVA Q | NA | 18 | 0 | 0 | 0 | 0 |
| EVIVA R | NA | 18 | 0 | 0 | 0 | 0 |
| EVIVA S | NA | 18 | 0 | 0 | 0 | 0 |
| EVIVA T | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO I | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO A | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO B | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO J | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO K | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO L | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO M | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO N | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO C | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO O | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO F | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO P | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO Q | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO R | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO S | NA | 18 | 0 | 0 | 0 | 0 |
| URBANO T | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 28 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 26 buildings; the table lists the first 20.
234 of 286 construction stages are filed complete across 26 buildings. The stage furthest along is Podiums (if any), at 0%.
EVIVA K82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EVIVA L82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EVIVA M82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EVIVA N82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EVIVA O82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EVIVA P82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EVIVA Q82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EVIVA R82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EVIVA S82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EVIVA T82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
URBANO I82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
URBANO A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
URBANO B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
URBANO J82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
URBANO K82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
URBANO L82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
URBANO M82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
URBANO N82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
URBANO C82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
URBANO O82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities18
As on 28 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 100% |
| ClubHouse | Yes | 0% |
| Sports Complex | Yes | 0% |
| Temple | Yes | 0% |
Parking filed2490
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| EVIVA K | 91 | 16 | 107 |
| EVIVA L | 56 | 16 | 72 |
| EVIVA M | 90 | 16 | 106 |
| EVIVA N | 55 | 16 | 71 |
| EVIVA O | 90 | 16 | 106 |
| EVIVA P | 90 | 16 | 106 |
| EVIVA Q | 55 | 16 | 71 |
| EVIVA R | 90 | 16 | 106 |
| EVIVA S | 55 | 16 | 71 |
| EVIVA T | 90 | 16 | 106 |
| URBANO I | 91 | 16 | 107 |
| URBANO A | 91 | 16 | 107 |
| URBANO B | 91 | 16 | 107 |
| URBANO J | 91 | 16 | 107 |
| URBANO K | 91 | 16 | 107 |
| URBANO L | 91 | 16 | 107 |
| URBANO M | 91 | 16 | 107 |
| URBANO N | 91 | 16 | 107 |
| URBANO C | 91 | 16 | 107 |
| URBANO O | 55 | 16 | 71 |
| URBANO F | 55 | 16 | 71 |
| URBANO P | 55 | 16 | 71 |
| URBANO Q | 91 | 16 | 107 |
| URBANO R | 73 | 16 | 89 |
| URBANO S | 73 | 16 | 89 |
| URBANO T | 91 | 16 | 107 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PALAVA DWELLERS PVT LTD | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VILAS DESAI & ASSOCIATES |
| Engineer | K C SHAH CONSULTANTS |
| Chartered Accountant | B B JAIN & ASSOCIATES |
| Chartered Accountant | MSKA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Lodha Developers Limited | - |
Litigation declared5
| Case | Court | Status |
|---|---|---|
| 203/2014 | Civil Judge JD Kalyan | WS filed along with application under Order Thirty Nine Rule |
| 555/2016 | Civil Judge JD Kalyan | Matter settled and withdrawn |
| 294/2013 | Civil Judge SD Kalyan | MCA Ninty four by Two Thousand Seventeen REJECTED |
| 362/2013 | Civil Judge SD Kalyan | MCA Ninty five by Two Thousand Seventeen rejected |
| 37/2015 | Civil Judge SD Kalyan | Plaintiff paid the court fees now kept for hearing of exhibit five |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000058060 | Udit Prakash | Palava Dwellers Private Limited | 01/03/2019 |
| CC006000000344289 | Vaibhav Kumar | Palava Dwellers Private Limited | 10/02/2023 |
| CC12501208 | Palava Dwellers Private Limited | Deepak Gori | 11/04/2025 |
| CC12503553 | Lodha Developers Limited | Saddam Sanwar Shah | 06/10/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Nov 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Nov 2021
Documents filed113
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: PALAVA EVIVA K to T, URBANO A, B ,C and F, URBANO I to T - P51700000419 - March 24.pdf | 28 May 2024 |
| Disclosure of sold/ booked inventoryFile: Dec 2023 Sold-Unsold_PALAVA EVIVA K to T, URBANO A, B ,C and F, URBANO I to T.pdf | 27 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Palava Eviva K to T, Urbano A, B ,C and F, Urbano I to T - P51700000419.pdf | 30 Nov 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registartion Certificate-Casa Urbano A to H.pdf | 12 Jan 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Certificate-Casa Eviva K to T.pdf | 12 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Palava E and U 1.pdf | 18 Nov 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Palava E and U 2.pdf | 18 Nov 2021 |
| Details of encumbrancesFile: PALAVA EVIVA K to T, URBANO A, B ,C and F, URBANO I to T.pdf | 27 Oct 2021 |
| Details of encumbrancesFile: Sector D.pdf | 22 Sep 2021 |
| Details of encumbrancesFile: Downtown.pdf | 20 Sep 2021 |
| Form 2AFile: Palava Eviva A to T Urbano A B C F Urbano I to T.pdf | 27 Aug 2020 |
| Certificates of CA (Form 5)File: Palava Eviva K to T.pdf | 30 Sep 2019 |
| Certificates of CA (Form 5)File: Palava Clara A D1.pdf | 30 Sep 2019 |
| Form 2AFile: EVIVA K TO T URBANO A B C F I TO T.pdf | 17 Jun 2019 |
| Details of encumbrancesFile: PALAVA EVIVA K TO T URBANO.pdf | 25 Feb 2019 |
| Certificates of Architect (Form 4)File: Palava Eviva K to T.pdf | 17 Jan 2019 |
| Building plan approvalFile: C12.pdf | 19 Nov 2018 |
| Building plan approvalFile: C13.pdf | 19 Nov 2018 |
| Building plan approvalFile: C14.pdf | 19 Nov 2018 |
| Building plan approvalFile: C15.pdf | 19 Nov 2018 |
| Building plan approvalFile: C16.pdf | 19 Nov 2018 |
| Building plan approvalFile: C17.pdf | 19 Nov 2018 |
| Building plan approvalFile: C18.pdf | 19 Nov 2018 |
| Building plan approvalFile: C19.pdf | 19 Nov 2018 |
| Building plan approvalFile: C22.pdf | 19 Nov 2018 |
| Building plan approvalFile: C23.pdf | 19 Nov 2018 |
| Building plan approvalFile: C24.pdf | 19 Nov 2018 |
| Building plan approvalFile: C25.pdf | 19 Nov 2018 |
| Building plan approvalFile: C26.pdf | 19 Nov 2018 |
| Building plan approvalFile: C27.pdf | 19 Nov 2018 |
| Building plan approvalFile: C28.pdf | 19 Nov 2018 |
| Building plan approvalFile: C29.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C12.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C13.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C14.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C15.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C16.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C17.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C18.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C19.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C22.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C23.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C24.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C25.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C26.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C27.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C28.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C29.pdf | 19 Nov 2018 |
| Details of encumbrancesFile: Eviva K to T Urbano.pdf | 16 Nov 2018 |
| Certificates of CA (Form 5)File: PALAVA EVIVA K TO T URBANO.pdf | 1 Oct 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: CASA-REGALIA-A-TO-F-CHS-LTD-1-3.pdf | 29 Aug 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: URBANO-A-TO-H-CHS-LTD-1-3-ilovepdf-compressed.pdf | 29 Aug 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: URBANO-A-TO-H-CHS-LTD-4-5-ilovepdf-compressed.pdf | 29 Aug 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: EVIVA K TO T CHS LTD.PDF | 29 Aug 2018 |
| Details of encumbrancesFile: Eviva K to T Urbano A to C I to T.pdf | 13 Aug 2018 |
| Copy of the legal title reportFile: 16_Urbano_Second Supplemental.pdf | 25 May 2018 |
| Copy of the legal title reportFile: 09_Eviva_Second Supplemental.pdf | 25 May 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Urbano I to T.PDF | 25 Apr 2018 |
| Details of encumbrancesFile: EVIVA K-T URBANO A-C K I-T.pdf | 30 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 A.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 B.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 C.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 D.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 E.pdf | 26 Mar 2018 |
| Proforma of Allotment letterFile: ATS (Downtown-Palava) - v3 - 3 November 2017.pdf | 6 Nov 2017 |
| Building plan approvalFile: Cl aa.pdf | 14 Jul 2017 |
| Building plan approvalFile: Cl bb.pdf | 14 Jul 2017 |
| Building plan approvalFile: Cl aa.pdf | 14 Jul 2017 |
| Building Plan Approval (IOD)File: Cl aa.pdf | 14 Jul 2017 |
| Building Plan Approval (IOD)File: Cl bb.pdf | 14 Jul 2017 |
| Building Plan Approval (IOD)File: Cl aa.pdf | 14 Jul 2017 |
| Details of encumbrancesFile: Palava Eviva Urbano.pdf | 13 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Palava Eviva K to T, Urbano A B C F - I to T Form 1.pdf | 13 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Palava Eviva K to T, Urbano A B C F, I to T Form-2.pdf | 13 Jul 2017 |
| Certificates of CA (Form 3)File: Palava Eviva K to T, Urbano A to C and F, Urbano I to T PART 1.pdf | 12 Jul 2017 |
| Certificates of CA (Form 3)File: Palava Eviva K to T, Urbano A to C and F, Urbano I to T PART 2.pdf | 12 Jul 2017 |
| Certificates of CA (Form 3)File: Palava Eviva K to T, Urbano A to C and F, Urbano I to T PART 3.pdf | 12 Jul 2017 |
| Proforma of Allotment letterFile: ATS Amenities Allotment_Eviva n Urbano Part.pdf | 12 Jul 2017 |
| Declaration in FORM BFile: Form B - Palava Eviva K to T11072017195616.pdf | 11 Jul 2017 |
| Building plan approvalFile: Cl 202 -1.pdf | 8 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Liana BP51700033964 | Dombivali, Thane | 140 | Mar 2022 | Completed | Feb 2026 | Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 54 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 113 filed documents as one ZIP, foldered, with a manifest
Keep PALAVA EVIVA K to T, URBANO A, B, C and F, U on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Palava7,600+ in Thane
Filed coordinates, straight-line distance. 58 registered projects within 2 km.
Swaminarayan City Phase 1C
Swaminarayan Life Space LLP
Swaminarayan City Phase I
Swaminarayan Life Space LLP
BHOIR JEWELS
SHANKAR NAMAJI BHOIR
Swaminarayan City Phase 1D
Swaminarayan Life Space LLP
Amar Galaxy Bldg No. 2 Wing B and C
AMAR REALTY
Swaminarayan City Phase 1B
Swaminarayan Life Space LLP
See every Thane project, with the district possession charts
Builder: Palava Dwellers Private Limited
Palava Dwellers Private Limited has 55 registrations on MahaRERA, including PALAVA VISTA A to D and Palava Cielo A - F. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T is delayed beyond 30 Jun 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T?
The registered promoter entity is Palava Dwellers Private Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T?
The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback