Home / Browse projects / Thane, Maharashtra / PALAVA ESTELA H, I, J
PALAVA ESTELA H, I, J
By Palava Dwellers Private Limited
RG-MH-50966 · RERA P51700013145 · Last updated on MahaRERA portal: 28 May 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 54 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PALAVA ESTELA H, I, J is a Residential / Group Housing project by Palava Dwellers Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700013145 on 14 Sep 2017. The registration is recorded completed; possession was promised by 30 Jun 2023.
At a glance
Project
- NamePALAVA ESTELA H, I, J
- TypeResidential / Group Housing
- Location
- Kalyan-Shilphata Road
- Palava
- Khoni
- Kalyan
- Thane
- 421202
- Pincode421202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700013145
- ReraGenie IDRG-MH-50966
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Sep 2017
- Promised completion30 Jun 2023
- Revised completionNone
- Buildings3 building records
- Documents filed62 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ESTELA H | NA | 20 | 0 | 0 | 0 | 0 |
| ESTELA I | NA | 20 | 0 | 0 | 0 | 0 |
| ESTELA J | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 28 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
ESTELA H82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ESTELA I82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ESTELA J82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities19
As on 28 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
| Sports Complex | Yes | 0% |
| Temple | Yes | 0% |
| Closing Parking | Yes | 100% |
| Clubhouse | Yes | 0% |
Parking filed280
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| ESTELA H | 94 | 11 | 105 |
| ESTELA I | 60 | 11 | 71 |
| ESTELA J | 93 | 11 | 104 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Palava Dwellers Pvt Ltd | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Palava Dwellers Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Apr 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Nov 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 Sep 2022
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Sold Unsold - PALAVA ESTELA H, I, J - P51700013145 - March 24.pdf | 28 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - PALAVA ESTELA H, I, J - P51700013145 - Dec23.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Palava Estela H, I, J - P51700013145 - Sep23.pdf | 21 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Palava - Estella - H,I,J.pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 12 PALAVA - ESTELLA - H,I,J.pdf | 12 Nov 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Palava OC Sept 2022.pdf | 29 Sep 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: PALAVA ESTELA H, I, J.pdf | 29 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PALAVA ESTELA H, I, J.pdf | 26 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12 PALAVA - ESTELLA - H,I,J.pdf | 29 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: PALAVA ESTELA H, I, J.pdf | 27 Dec 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 22 PALAVA ESTELA H,I,J.pdf | 17 Dec 2021 |
| Certificates of CA (Form 3)File: 12 PALAVA - ESTELLA - H,I,J.pdf | 15 Dec 2021 |
| Form 2AFile: 46 PALAVA ESTELA H,I,J.pdf | 18 Nov 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 22 PALAVA ESTELA H,I,J.pdf | 3 Nov 2021 |
| Certificates of CA (Form 3)File: PALAVA - ESTELLA - H,I,J.pdf | 3 Nov 2021 |
| Details of encumbrancesFile: PALAVA ESTELA H, I, J.pdf | 27 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 21_ESTELA H,I,J.pdf | 15 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 104 PALAVA - ESTELLA - H,I,J.pdf | 15 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: P51700013145.pdf | 14 Oct 2021 |
| Details of encumbrancesFile: Estela G, H and I.pdf | 28 Sep 2021 |
| Form 2AFile: P51700013145.pdf | 13 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 123 Palava Estella H I J.pdf | 27 Oct 2020 |
| Form 2AFile: Palava Estela H I J.pdf | 27 Aug 2020 |
| Certificates of CA (Form 5)File: Palava Estela H I J.pdf | 30 Sep 2019 |
| Form 2AFile: ESTELA H I J.pdf | 17 Jun 2019 |
| Details of encumbrancesFile: PALAVA ESTELA H I J.pdf | 25 Feb 2019 |
| Building plan approvalFile: C36.pdf | 19 Nov 2018 |
| Building plan approvalFile: C37.pdf | 19 Nov 2018 |
| Building plan approvalFile: C38.pdf | 19 Nov 2018 |
| Building plan approvalFile: C39.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C36.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C37.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C38.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C39.pdf | 19 Nov 2018 |
| Details of encumbrancesFile: Palava Estela H I J.pdf | 16 Nov 2018 |
| Certificates of CA (Form 5)File: PALAVA ESTELA H I J.pdf | 1 Oct 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: ESTELA CHS LTD.pdf | 21 Aug 2018 |
| Details of encumbrancesFile: Estela H I J.pdf | 13 Aug 2018 |
| Copy of the legal title reportFile: 08_Estella_Sector_5_Second Supplemental.pdf | 30 Apr 2018 |
| Details of encumbrancesFile: ESTELA H I J.pdf | 30 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 A.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 B.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 C.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 D.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 E.pdf | 26 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PALAVA ESTELA - H I J.pdf | 26 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PALAVA ESTELA H I J.pdf | 19 Feb 2018 |
| Declaration in FORM BFile: Form B - Estela H I J .pdf | 8 Sep 2017 |
| Layout approvalFile: Estela H I J_Layout.pdf | 24 Aug 2017 |
| Building plan approvalFile: IOD H J_1.pdf | 24 Aug 2017 |
| Building plan approvalFile: IOD I_2.pdf | 24 Aug 2017 |
| PAN CardFile: SAMVARA BUILDTECH PVT LTD PAN CARD.pdf | 24 Aug 2017 |
| Copy of the legal title reportFile: TR- AURELIA November 2016.PDF | 24 Aug 2017 |
| Copy of the legal title reportFile: First Supplemental _Aurelia 31 May 2017.pdf | 24 Aug 2017 |
| Copy of the legal title reportFile: Second Supplemental TR.pdf | 24 Aug 2017 |
| Copy of the legal title reportFile: Corrigendum_Aurelia.pdf | 24 Aug 2017 |
| Details of encumbrancesFile: Encumbrances_Estela H I J.pdf | 24 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Estela H I J_Layout.pdf | 24 Aug 2017 |
| Building Plan Approval (IOD)File: IOD H J_1.pdf | 24 Aug 2017 |
| Building Plan Approval (IOD)File: IOD I_2.pdf | 24 Aug 2017 |
| Certificates of CA (Form 3)File: Estela H I J.pdf | 24 Aug 2017 |
| Proforma of Allotment letterFile: ATS_ESTELA.pdf | 24 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 54 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
Keep PALAVA ESTELA H, I, J on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Palava7,600+ in Thane
Filed coordinates, straight-line distance. 32 registered projects within 2 km.
Swaminarayan City Phase 1C
Swaminarayan Life Space LLP
Swaminarayan City Phase I
Swaminarayan Life Space LLP
BHOIR JEWELS
SHANKAR NAMAJI BHOIR
Swaminarayan City Phase 1D
Swaminarayan Life Space LLP
Amar Galaxy Bldg No. 2 Wing B and C
AMAR REALTY
Swaminarayan City Phase 1B
Swaminarayan Life Space LLP
See every Thane project, with the district possession charts
Builder: Palava Dwellers Private Limited
Palava Dwellers Private Limited has 55 registrations on MahaRERA, including PALAVA VISTA A to D and Palava Cielo A - F. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if PALAVA ESTELA H, I, J is delayed beyond 30 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PALAVA ESTELA H, I, J?
The registered promoter entity is Palava Dwellers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PALAVA ESTELA H, I, J?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PALAVA ESTELA H, I, J?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in PALAVA ESTELA H, I, J?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback