PALAVA CLARA A to D, D1
By Palava Dwellers Private Limited
RG-MH-10473 · RERA P51700000448 · Last updated on MahaRERA portal: 28 May 2024
Source: official MahaRERA filing
Red flags
- 5 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PALAVA CLARA A to D, D1 is a Residential / Group Housing project by Palava Dwellers Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700000448 on 18 Jul 2017. The registration is recorded completed; possession was promised by 28 Feb 2022. 5 complaints are on record with the regulator.
At a glance
Project
- NamePALAVA CLARA A to D, D1
- TypeResidential / Group Housing
- Location
- Kalyan-Shilphata Road
- Palava
- Khoni
- Kalyan
- Thane
- 421202
- Pincode421202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700000448
- ReraGenie IDRG-MH-10473
Builder
- NamePalava Dwellers Private Limited
- Entity typeCompany
- CINL45200MH1995PLC093041
- GSTIN27AAACL1490J1ZG
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- ChairpersonsPIYUSH VORA, PIYUSH VORA, PIYUSH VORA
- Other registrations54 more →
- Completed51 of 55
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Jul 2017
- Promised completion28 Feb 2022
- Revised completionNone
- Buildings5 building records
- Documents filed54 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CLARA A | NA | 18 | 0 | 0 | 0 | 0 |
| CLARA B | NA | 18 | 0 | 0 | 0 | 0 |
| CLARA C | NA | 18 | 0 | 0 | 0 | 0 |
| CLARA D | NA | 18 | 0 | 0 | 0 | 0 |
| CLARA D1 | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 28 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
45 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.
CLARA A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CLARA B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CLARA C82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CLARA D82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CLARA D182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities19
As on 28 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 80% |
| Sports Complex | Yes | 20% |
| Club House | Yes | 2% |
| Woodland Park | No | Not applicable |
| Temple | Yes | 50% |
Parking filed420
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| CLARA A | 89 | 16 | 105 |
| CLARA B | 54 | 16 | 70 |
| CLARA C | 54 | 16 | 70 |
| CLARA D | 54 | 16 | 70 |
| CLARA D1 | 89 | 16 | 105 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PALAVA DWELLERS PVT LTD (LODHA DEVELOPERS PVT LTD) | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VILAS DESAI & ASSOCIATES |
| Engineer | K C SHAH CONSULTANTS |
| Chartered Accountant | B B JAIN & ASSOCIATES |
| Chartered Accountant | MSKA & ASSOCIATESMSKA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Lodha Developers Limited | - |
Litigation declared5
| Case | Court | Status |
|---|---|---|
| 203/2013 | Civil Judge JD Kalyan | WS filed along with application under Order Thirty Nine Rule Eleven |
| 12/2017 | Civil Judge JD Kalyan | Exhibit Five partly allowed we have filed Writ against the said order in the High Court |
| 294/2013 | Civil Judge SD Kalyan | MCA Ninty four by Two Thousand Seventeen Rejected |
| 362/2013 | Civil Judge SD Kalyan | MCA Ninty five by Two Thousand Seventeen Rejected |
| 37/2015 | Civil Judge SD Kalyan | Exhibit five of the Plaintiff rejected the Plaintiff filed appeal in the High court |
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000001493 | Jitesh Adiani | PERSHID KATGARA | 08/11/2017 |
| CC006000000000731 | SHEO PRATAP SINGH | LODHA ESTATE PVT LTD | 19/09/2017 |
| CC006000000001830 | satish Tiwari | Satish Tiwari | 13/11/2017 |
| CC006000000012307 | Ramesh Parashram Punekar | Lodha Group | 05/12/2017 |
| CC006000000078921 | Clive Oliver Dsouza | Lodha Developers | 16/04/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Nov 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Aug 2022
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Sold Unsold - PALAVA CLARA A - D, D1 - P51700000448 - March 24.pdf | 28 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - PALAVA CLARA A - D, D1 - P51700000448 - Dec23.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Palava Clara A - D, D1 - P51700000448.pdf | 30 Nov 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registartion Certificate-Casa Clara A to M.pdf | 12 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PALAVA OC dated 2019_11_21_compressed.pdf | 6 Aug 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 104 Palava Clara A D1.pdf | 27 Oct 2020 |
| Form 2AFile: Palava Clara A to D D1.pdf | 27 Aug 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: CLARA A_B_C_D_D1.pdf | 23 Dec 2019 |
| Details of encumbrancesFile: Palava CLara A to D D1.pdf | 12 Nov 2019 |
| Form 2AFile: CLARA A TO D.pdf | 17 Jun 2019 |
| Details of encumbrancesFile: Clara A - D.pdf | 22 May 2019 |
| Details of encumbrancesFile: PALAVA CLARA A D D1.pdf | 25 Feb 2019 |
| Building plan approvalFile: C36.pdf | 19 Nov 2018 |
| Building plan approvalFile: C37.pdf | 19 Nov 2018 |
| Building plan approvalFile: C38.pdf | 19 Nov 2018 |
| Building plan approvalFile: C39.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C36.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C37.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C38.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: C39.pdf | 19 Nov 2018 |
| Details of encumbrancesFile: Clara A to D D1.pdf | 16 Nov 2018 |
| Certificates of CA (Form 5)File: Palava Clara A-D,D1.pdf | 1 Oct 2018 |
| Details of encumbrancesFile: Clara A to D D1.pdf | 13 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Clara A to D D1.pdf | 11 Aug 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F2 Clara A to D1.pdf | 11 Aug 2018 |
| Certificates of CA (Form 3)File: F3 Clara A to D D1.pdf | 11 Aug 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Clara.pdf | 25 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PALAVA CLARA A TO D.pdf | 6 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PALAVA CLARA A TO D D1.pdf | 6 Apr 2018 |
| Details of encumbrancesFile: CLARA A-D D1.pdf | 30 Mar 2018 |
| Certificates of CA (Form 3)File: Clara A to D1.pdf | 29 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 A.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 B.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 C.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 D.pdf | 26 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Mar 2018 E.pdf | 26 Mar 2018 |
| Building plan approvalFile: Cl a.pdf | 14 Jul 2017 |
| Building plan approvalFile: Cl b.pdf | 14 Jul 2017 |
| Building plan approvalFile: Cl c.pdf | 14 Jul 2017 |
| Layout approvalFile: Cl-Clara A-D,D1.pdf | 14 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Cl-Clara A-D,D1.pdf | 14 Jul 2017 |
| Building Plan Approval (IOD)File: Cl a.pdf | 14 Jul 2017 |
| Building Plan Approval (IOD)File: Cl b.pdf | 14 Jul 2017 |
| Building Plan Approval (IOD)File: Cl c.pdf | 14 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Segment 001 of Palava Clara A to D D1 Form 1.pdf | 14 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Segment 002 of Palava Clara A to D D1 Form 1.pdf | 14 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Segment 003 of Palava Clara A to D D1 Form 1.pdf | 14 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Palava Clara A to D D1 Form-2.pdf | 14 Jul 2017 |
| PAN CardFile: lodha estate pvt ltd.pdf | 13 Jul 2017 |
| Copy of the legal title reportFile: Title Report Final.pdf | 13 Jul 2017 |
| Details of encumbrancesFile: Palava Clara A-D, D1.pdf | 13 Jul 2017 |
| Declaration in FORM BFile: Form B Clara A to D1.pdf | 13 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 Clara A to D1.pdf | 13 Jul 2017 |
| Proforma of Allotment letterFile: Agreement to Sale and Allotment Letter.pdf | 13 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Liana BP51700033964 | Dombivali, Thane | 140 | Mar 2022 | Completed | Feb 2026 | Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 54 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
Keep PALAVA CLARA A to D, D1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Palava7,600+ in Thane
Filed coordinates, straight-line distance. 58 registered projects within 2 km.
Swaminarayan City Phase 1C
Swaminarayan Life Space LLP
Swaminarayan City Phase I
Swaminarayan Life Space LLP
BHOIR JEWELS
SHANKAR NAMAJI BHOIR
Swaminarayan City Phase 1D
Swaminarayan Life Space LLP
Amar Galaxy Bldg No. 2 Wing B and C
AMAR REALTY
Swaminarayan City Phase 1B
Swaminarayan Life Space LLP
See every Thane project, with the district possession charts
Builder: Palava Dwellers Private Limited
Palava Dwellers Private Limited has 55 registrations on MahaRERA, including PALAVA VISTA A to D and Palava Cielo A - F. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if PALAVA CLARA A to D, D1 is delayed beyond 28 Feb 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PALAVA CLARA A to D, D1?
The registered promoter entity is Palava Dwellers Private Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PALAVA CLARA A to D, D1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PALAVA CLARA A to D, D1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PALAVA CLARA A to D, D1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PALAVA CLARA A to D, D1?
The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATESMSKA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PALAVA CLARA A to D, D1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.