ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Palaash Aayush

Registered No litigation declared Residential / Group Housing project

Palaash Aayush

By S P B INFRA

RG-MH-60440 · RERA P52100053394 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedno revision filed
25 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 0%
63 of 132Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

Palaash Aayush is a Residential / Group Housing project by S P B INFRA in Pune, Maharashtra, registered with MahaRERA as P52100053394 on 31 Oct 2023. Possession is promised by 31 Jan 2027. 69 of the 132 units on this registration are recorded sold or booked, and 25 of 33 construction stages are filed complete.

At a glance

Project

  • NamePalaash Aayush
  • TypeResidential / Group Housing
  • Location
    • Chinchwad
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411019
  • Pincode411019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053394
  • ReraGenie IDRG-MH-60440

Builder

  • NameS P B INFRA
  • Entity typePartnership
  • PartnersSulochana Gurubux Pahlani, Sachin Murli Bathija, Murli Khushiram Bathija, Hiraman Nivrutti Bhujbal
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2023PromisedJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Oct 2023
  • Promised completion31 Jan 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed105 files

Current status

52%69 of 132 units booked
203.4%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA111144044
B WingNA121144044
C WingNA111144044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.

A Wing82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Wing73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C Wing73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership23

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,828 sq m
Land owned byThe promoter, with other names on the file
Named landowners23
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jun 2025
LandownerVillageDistrict
Mr Rajendra alias Rajabhau Rambhau GolandePimpri Chinchawad (M Corp.)Pune
Mr Vijay Rambhau GolandePimpri Chinchawad (M Corp.)Pune
Mr Ankush Moreshwar GolandePimpri Chinchawad (M Corp.)Pune
Mr Umesh Moreshwar GolandePimpri Chinchawad (M Corp.)Pune
Mr Avinash Moreshwar GolandePimpri Chinchawad (M Corp.)Pune
Mr Ramesh Moreshwar GolandePimpri Chinchawad (M Corp.)Pune
Mrs Gital Rajendra GolandePimpri Chinchawad (M Corp.)Pune
Mr Siddhesh Rajendra GolandePimpri Chinchawad (M Corp.)Pune
Ms Shruti Rajendra GolandePimpri Chinchawad (M Corp.)Pune
Mrs Sujata Vijay GolandePimpri Chinchawad (M Corp.)Pune
Ms Payal Vijay GolandePimpri Chinchawad (M Corp.)Pune
Mr Vishwajeet Vijay GolandePimpri Chinchawad (M Corp.)Pune
Mrs Rupali Ankush GolandePimpri Chinchawad (M Corp.)Pune
Mr Palak Ankush GolandePimpri Chinchawad (M Corp.)Pune
Mr Shantanu Umesh GolandePimpri Chinchawad (M Corp.)Pune
Ms Pranjal Umesh GolandePimpri Chinchawad (M Corp.)Pune
Mr Kartik Avinash GolandePimpri Chinchawad (M Corp.)Pune
Mrs Sonal Kartik GolandePimpri Chinchawad (M Corp.)Pune
Mrs Maya Ramesh GolandePimpri Chinchawad (M Corp.)Pune
Mr Mayur Ramesh GolandePimpri Chinchawad (M Corp.)Pune
Mr Ashutosh Ramesh GolandePimpri Chinchawad (M Corp.)Pune
Mr Vishesh Ankush GolandePimpri Chinchawad (M Corp.)Pune
Mrs Shubhada Avinash GolandePimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI6697.6
Proposed, not sanctioned6,698 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJarvari Mezzanine Pune
Estimated costRs 24.00 cr
Cost incurredRs 48.81 cr
Work done203.39%
BuildingWingEstimatedIncurred
A WingNARs 8.14 crRs 16.56 cr
C WingNARs 6.84 crRs 13.91 cr
B WingNARs 6.78 crRs 13.79 cr
-NARs 2.24 crRs 4.56 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr N D Joshi Joshi
ArchitectYOJANA ARCHITECTS ASSOCIATES
EngineerMr Appasha Kote Kote
Chartered AccountantCA Mahesh Khandekar and Co
Chartered AccountantCA AZAM MULANI Mulani
Chartered AccountantM/s Rinkesh Gupta & Associates
PartnerRole in project
S P B INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2027

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 SPB PHASE 1.pdf17 Jul 2026
Withdrawal Update Form 2File: FORM 2 SPB INFRA PHASE 1.pdf17 Jul 2026
Withdrawal Update Form 3File: FORM3 SPB INFRA PHASE 1.pdf17 Jul 2026
Form 2A (FY 2025-2026)File: Form-2A Phase-1.pdf17 Jul 2026
Withdrawal Update Form 1File: SPB-PHASE-1 ARCHITECH CERTIFICATE.pdf20 Apr 2026
Withdrawal Update Form 2File: form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: ph-1 spb infra (1) (1).pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf20 Jan 2026
Withdrawal Update Form 1File: form 1 ph 1.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 ph1.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 ph 1-compressed.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: SBP Infra form 5.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1 signed.pdf19 Jul 2025
Withdrawal Update Form 2File: Signed form 2 - SPB INfra Phase 1.pdf19 Jul 2025
Withdrawal Update Form 3File: Signed SPB PHASE-1 FORM-3_compressed (1).pdf19 Jul 2025
Form 5 (FY 2023-2024)File: FORM 5.pdf24 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPB INFRA-compressed.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf3 Apr 2025
Disclosure of sold/ booked inventoryFile: statement spb.pdf3 Apr 2025
Layout approvalFile: LAYOUT A.pdf20 Mar 2025
Layout approvalFile: LAYOUT B.pdf20 Mar 2025
Layout approvalFile: LAYOUT CLUBHOUSE.pdf20 Mar 2025
Layout approvalFile: LAYOUT.pdf20 Mar 2025
Layout approvalFile: LAYOUT.pdf20 Mar 2025
Layout approvalFile: MAIN LAYOUT_compressed.pdf20 Mar 2025
Layout approvalFile: PARKING B_compressed.pdf20 Mar 2025
Layout approvalFile: PARKING C_compressed.pdf20 Mar 2025
Layout approvalFile: WING A_compressed.pdf20 Mar 2025
Building plan approvalFile: BLDG C.pdf20 Mar 2025
Building plan approvalFile: BLG A_compressed.pdf20 Mar 2025
Building plan approvalFile: BLG B_compressed.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: LAYOUT A.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: LAYOUT B.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: LAYOUT CLUBHOUSE.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: MAIN LAYOUT_compressed.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: PARKING B_compressed.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: PARKING C_compressed.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: WING A_compressed.pdf20 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: BLDG C.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: BLG A_compressed.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: BLG B_compressed.pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: statement-merged-compressed.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE SPB-DEC-24.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SPB INFRA -CA-FORM-3.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE SPB-DEC-24.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 1.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: STATEMENT.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed (8).pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (3).pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (3).pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: STATEMENT.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Signed copy.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (2).pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (2).pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3.pdf8 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow8 Feb 2024
Proforma of Agreement for saleFile: RERA Draft (1).pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FINAL.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE JAN2024 (1).pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold unsold flats.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: declaration rera for nil withdrawl.pdf11 Jan 2024
Other - TechnicalFile: scan0357_compressed.pdf29 Jun 2023
Other - TechnicalFile: scan0358_compressed.pdf29 Jun 2023
Layout approvalFile: scan (1)_compressed.pdf17 Jun 2023
Building plan approvalFile: scan0359_compressed.pdf17 Jun 2023
Building plan approvalFile: scan0360_compressed.pdf17 Jun 2023
Building plan approvalFile: scan0362_compressed.pdf17 Jun 2023
Building plan approvalFile: scan0361_compressed.pdf17 Jun 2023

How this compares with Pune

52%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Palaash Aayush on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chinchwad13,700+ in Pune

2 kmPalaash AayushCompleted 51Lapsed / revoked 36Other 139Dot size: filed unitsN

Filed coordinates, straight-line distance. 226 registered projects within 2 km.

Builder: S P B INFRA

S P B INFRA has 2 registrations on MahaRERA, including Palaash Aayush and Palaash Aayush Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Palaash Aayush is delayed beyond 31 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Palaash Aayush?

The registered promoter entity is S P B INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Palaash Aayush?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Palaash Aayush?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Palaash Aayush?

The professionals named in the filing: Architect: Ar N D Joshi Joshi; Architect: YOJANA ARCHITECTS ASSOCIATES; Engineer: Mr Appasha Kote Kote; Chartered Accountant: CA Mahesh Khandekar and Co; Chartered Accountant: CA AZAM MULANI Mulani; Chartered Accountant: M/s Rinkesh Gupta & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Palaash Aayush?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Palaash Aayush. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Palaash Aayush to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.