ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / THE CENTRAL PARK PHASE -I

Registered Litigation declared Residential / Group Housing project

THE CENTRAL PARK PHASE -I

By R RETAIL VENTURES PRIVATE LIMITED

RG-MH-16124 · RERA P52100025260 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 6 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
55 of 55Construction stages doneacross 5 buildings; every applicable stage filed complete
8 of 785Units unsoldnot recorded sold or booked
6Complaints at MahaRERAon this registration
Jump to the 179 documents Report an error

THE CENTRAL PARK PHASE -I is a Residential / Group Housing project by R RETAIL VENTURES PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100025260 on 27 Mar 2020. Possession is promised by 30 Dec 2026. 777 of the 785 units on this registration are recorded sold or booked, and 55 of 55 construction stages are filed complete. 6 complaints are on record with the regulator.

At a glance

Project

  • NameTHE CENTRAL PARK PHASE -I
  • TypeResidential / Group Housing
  • Location
    • NH4 OLD MUMBAI PUNE HIGHWAY
    • Chinchwad
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411019
  • Pincode411019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100025260
  • ReraGenie IDRG-MH-16124

Builder

  • NameR RETAIL VENTURES PRIVATE LIMITED
  • Entity typeCompany
  • CINU70200MH2018PTC313615
  • GSTIN27AARCA2688J1Z0
  • DirectorSangeeta Prasad
  • Other registrations4 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredMar 2020PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Mar 2020
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings5 building records
  • Documents filed179 files

Current status

99%777 of 785 units booked
100.0%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C1NA41371420142
C2NA41371790179
C3NA41151410141
B1NA41371780178
B2NA41371450145

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

55 of 55 construction stages are filed complete across 5 buildings.

C1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed608

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots608
Closed/Covered608
BuildingClosed/CoveredTotal
C1108108
C2109109
C3106106
B1141141
B2144144

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,831 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Apr 2026

Approvals and building plan

Sanctioning authorityPCMC
Permissible FSI100343.68
Proposed, not sanctioned81,370 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 9 10 Maryland corner near Sion Circle Sion East Mumbai 400022
Estimated costRs 1,272.40 cr
Cost incurredRs 1,272.40 cr
Work done100.0%
BuildingWingEstimatedIncurred
C1NARs 237.77 crRs 237.77 cr
C2NARs 237.77 crRs 237.77 cr
C3NARs 237.77 crRs 237.77 cr
B1NARs 237.77 crRs 237.77 cr
B2NARs 237.77 crRs 237.77 cr
-NARs 83.54 crRs 83.54 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin Sutar
ArchitectUnusual Upaces
EngineerRaman Hariharan Iyer
EngineerSantosh Supekar
Chartered AccountantS P Gunjal & Associates
Chartered AccountantSSMG & Associates LLP Chartered Accountants
Chartered AccountantPrice Waterhouse & Co Chartered Accountants LLP
Chartered AccountantM B Agrawal & Co
PartnerRole in project
R RETAIL VENTURES PRIVATE LIMITED-

Litigation declared2

CaseCourtStatus
2789/2020High Court of BombayPending
6208/2021Bombay High CourtPending

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC005000000064827Mukesh BansalR Retail Ventures Pvt Ltd through its Director Mr. Sanjaya Dube and Mr. Sanjay Daga21/11/2020
CC005000000106421ashish shindeR Retail Ventures28/12/2021
CC005000000106687Ashish PacharneR Retail Ventures Pvt Ltd24/02/2022
CC005000000310521ASHISH NARMR. SANDEEP RUNWAL - DIRECTOR, R RETAIL VENTURES PVT LTD02/03/2024
CC12500688Amol Ashok ManchekarR RETAIL VENTURES PRIVATE LIMITED26/02/2025
CC12504130DINESH Prakash agrawalR RETAIL VENTURES PRIVATE LIMITED24/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed179

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 179 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf28 Apr 2026
Form 1File: Form 1.pdf4 Feb 2026
Form 2File: Form 2.pdf4 Feb 2026
Form 3File: Form 3.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf4 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf11 Dec 2025
Form 5 (FY 2024-2025)File: Form 5.pdf3 Dec 2025
Form 1File: Form 1.pdf30 Oct 2025
Form 2File: Form 2.pdf30 Oct 2025
Form 3File: CA Form 3.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf30 Oct 2025
Form 1File: Form 1.pdf31 Jul 2025
Form 2File: Form 2 June 2025.pdf31 Jul 2025
Form 3File: Form 3 June 2025.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf31 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form 2.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 18 04 2025.pdf18 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023 24 C.pdf24 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2024.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: sold unsold Dec 2024.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2024.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf13 Jan 2025
Proforma of Agreement for saleFile: Updated AFS Central Park Phase I dated 02 07 2024 1 to 90.pdf15 Nov 2024
Proforma of Agreement for saleFile: Updated AFS Central Park Phase I dated 02 07 2024 91 118.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 2023.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2024.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 2024.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 June 2024.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2024.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold June 2024_compressed.pdf19 Jul 2024
Building plan approvalFile: C1 Building plan.pdf31 May 2024
Building Plan Approval / NA Order for plotted developmentFile: C1 Building plan.pdf31 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC dtd 3 January 2024.pdf23 May 2024
Declaration about Commencement CertificateFile: TCP CC Declaration Jan 24 Phase I-II-III-1.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 24.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory March 2024.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mrach 24.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: sold Unsold Inventory compressed.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf17 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 compressed.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold 30 09 2023 Pg 1 to 8.pdf2 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold 30 09 2023 Pg 9 to 18.pdf2 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Phase 1.pdf30 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase I 30 09 2023.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 1 30 09 2023.pdf26 Oct 2023
Home Buyer /Allottee Grievance Redressal CellFile: Declaration Central Park Phase I.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for Central Park Phase I dtd 30 06 2023.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Phase I as on 30 June 2023.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold list of Central Park Phase I as on 30 June 2023.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase I 30 June 2023 compressed.pdf17 Jul 2023
Proforma of Agreement for saleFile: AFS Central Park Phase I - Revised 29 Dec 2022 for RERA.pdf22 May 2023
Layout approvalFile: Layout 25 11 2022.pdf11 May 2023
Copy of Layout Approval (in case of layout)File: Layout 25 11 2022.pdf11 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC 25 11 2022.pdf11 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 March 2020.pdf27 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Phase1 31 3 2023.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Phase 1 sold unsold inventory 31 03 2023.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase I 31 03 2023.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 1 march 2023.pdf5 Apr 2023
Disclosure of sold/ booked inventoryFile: Central Park Phase I 31 Dec 22.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Central Park Phase I.pdf16 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Central Park Phase I.pdf16 Jan 2023
Declaration about Commencement CertificateFile: FORM D - CENTRAL PARK PHASE I.pdf3 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - CENTRAL PARK PHASE I.pdf3 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Fomr 5 Pune Phase 1 2021-2022.pdf31 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Pune phase 1.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: sold unsold phase 1_compressed (1).pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pune Phase 1.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Central Park Phase I 30092022.pdf19 Oct 2022

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE CENTRAL PARK PHASE -I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chinchwad13,700+ in Pune

2 kmTHE CENTRAL PARK PHASE -Completed 56Lapsed / revoked 39Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 237 registered projects within 2 km.

Builder: R RETAIL VENTURES PRIVATE LIMITED

R RETAIL VENTURES PRIVATE LIMITED has 5 registrations on MahaRERA, including THE CENTRAL PARK PHASE -I and THE CENTRAL PARK PHASE - II. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if THE CENTRAL PARK PHASE -I is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE CENTRAL PARK PHASE -I?

The registered promoter entity is R RETAIL VENTURES PRIVATE LIMITED, a company as per the filing. Its CIN U70200MH2018PTC313615 and GSTIN 27AARCA2688J1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE CENTRAL PARK PHASE -I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against THE CENTRAL PARK PHASE -I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for THE CENTRAL PARK PHASE -I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE CENTRAL PARK PHASE -I?

The professionals named in the filing: Architect: Sachin Sutar; Architect: Unusual Upaces; Engineer: Raman Hariharan Iyer; Engineer: Santosh Supekar; Chartered Accountant: S P Gunjal & Associates; Chartered Accountant: SSMG & Associates LLP Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE CENTRAL PARK PHASE -I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE CENTRAL PARK PHASE -I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE CENTRAL PARK PHASE -I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.