Home / Browse projects / Palghar, Maharashtra / OSTWAL WOODS III

Registered No litigation declared Commercial project

OSTWAL WOODS III

By SHREE OSTWAL BUILDERS LTD

RG-MH-32180 · RERA P99000080244 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 19 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 30%
58 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

OSTWAL WOODS III is a Commercial project by SHREE OSTWAL BUILDERS LTD in Palghar, Maharashtra, registered with MahaRERA as P99000080244 on 13 May 2025. Possession is promised by 31 Dec 2029. 20 of the 78 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameOSTWAL WOODS III
  • TypeCommercial
  • Location
    • CHILLAR ROAD
    • OPP. UNION PARK
    • Betegaon
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000080244
  • ReraGenie IDRG-MH-32180

Builder

  • NameSHREE OSTWAL BUILDERS LTD
  • Entity typeCompany
  • CINU45200MH1989PLC050872
  • GSTIN27AAFCS2523N1Z4
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorUMRAOSINGH PRITHVIRAJ OSTWAL
  • DirectorsKULDEEP UMRAOSINGH Ostwal, KULDEEP UMRAOSINGH Ostwal, ASHA UMRAOSINGH OSTWAL, RAKESH SHANTILAL JAIN, SHAKENDRA VARDHMAN CHHAJED
  • Other registrations19 more →
  • Completed7 of 20
  • Past their filed date1
  • Declared earlier projects6 →

Key dates

this monthRegisteredMay 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 May 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed69 files

Current status

26%20 of 78 units booked
9.8%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OSTWAL WOODS III BUILDING NO 1 TYPE A WING-ANA87201939
OSTWAL WOODS III BUILDING NO 1 TYPE B WING-BNA87201939

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 30%.

OSTWAL WOODS III BUILDING NO 1 TYPE A WING-A30%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
OSTWAL WOODS III BUILDING NO 1 TYPE B WING-B30%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed105

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots105
Closed/Covered30
Open Space75
BuildingClosed/CoveredOpen SpaceTotal
OSTWAL WOODS III BUILDING NO 1 TYPE A WING-A184664
OSTWAL WOODS III BUILDING NO 1 TYPE B WING-B122941

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,688 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 May 2025

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE PALGHAR
Permissible FSI6720.95
Proposed, not sanctioned4,776 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 9 OSTWAL ORBIT CHSL MIRA BHAYANDER ROAD MIRA ROAD EAST 401107
Estimated costRs 19.04 cr
Cost incurredRs 1.87 cr
Work done9.83%
BuildingWingEstimatedIncurred
OSTWAL WOODS III BUILDING NO 1 TYPE A WING-ANARs 7.83 crRs 1.33 cr
OSTWAL WOODS III BUILDING NO 1 TYPE B WING-BNARs 7.21 crRs 42.03 lakh
-NARs 4.00 crRs 12.00 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTUSHILP
EngineerBHAVESH BHALCHANDRA TODANKAR
EngineerPRO TECHCONSULTANTS
EngineerBHAVESH TODANKAR BHAVESH BALCHANDRA TODANKAR
EngineerBHAVESH TODANKAR
EngineerSUNIL PAWAR MAHIPAL PAWAR
Chartered AccountantABHISHEK SURANA & CO
Chartered AccountantMadhubala Jain & Co
PartnerRole in project
SHREE OSTWAL BUILDERS LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Woods III_31032026.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2_Woods III_31032026.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3_Woods III_31032026.pdf24 Apr 2026
Withdrawal Update Form 1File: FORM-1_OSTWAL WOODS III_31122025.pdf21 Jan 2026
Withdrawal Update Form 2File: FORM-2_WOODS III_31122025.pdf21 Jan 2026
Withdrawal Update Form 3File: FORM-3_WOODS III_31122025.pdf21 Jan 2026
Withdrawal Update Form 1File: Form-1_Ostwal Woods III_30092025.pdf4 Dec 2025
Withdrawal Update Form 2File: FORM-2_OSTWAL WOODS III_30092025.pdf4 Dec 2025
Withdrawal Update Form 3File: FORM-3_OSTWAL WOODS III_30092025.pdf4 Dec 2025
Withdrawal Update Form 1File: Architect Certificate 30062024.pdf22 Sep 2025
Withdrawal Update Form 1File: Architect Certificate 30062024.pdf22 Sep 2025
Withdrawal Update Form 2File: FORM 2 _30062025_Woods III.pdf22 Sep 2025
Withdrawal Update Form 2File: FORM 2 _30062025_Woods III.pdf22 Sep 2025
Withdrawal Update Form 3File: Form 3 Ostwal Woods III 30062025.pdf22 Sep 2025
Withdrawal Update Form 3File: Form 3 Ostwal Woods III 30062025.pdf22 Sep 2025
Declaration about Commencement CertificateFile: Format D_ Commencement Certificate.pdf24 Apr 2025
Other - TechnicalFile: Gmail - CC Issued by collector Palghar on BPMS system at village Betegaon Gut No 148-B-2 o23 Apr 2025
Declaration in FORM BFile: Form-B_Revised.pdf8 Apr 2025
Declaration about Commencement CertificateFile: Format D_Revised.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ostwal woods III.pdf29 Mar 2025
Building plan approvalFile: Plan 1.pdf17 Mar 2025
Building plan approvalFile: Plan 2.pdf17 Mar 2025
Building plan approvalFile: Plan 3.pdf17 Mar 2025
Building plan approvalFile: Plan 4.pdf17 Mar 2025
Building plan approvalFile: Plan 5.pdf17 Mar 2025
Building plan approvalFile: Plan 6.pdf17 Mar 2025
Declaration in FORM BFile: FORM B.pdf17 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC-REVISED-07032025.pdf17 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf17 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf17 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf17 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf17 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf17 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf17 Mar 2025
Declaration about Commencement CertificateFile: Format D.pdf17 Mar 2025
Other - TechnicalFile: Annexure A-.pdf17 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Anamika 06082024.pdf5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: revised CA CERTIFICATE_ANAMIKA_11zon.pdf14 May 2024
Details of encumbrances concerned to FinanceFile: Financial Encrumbrances 25 04 2024.pdf3 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account_Ostwal Anamika.pdf3 May 2024
Details of encumbrances concerned to LegalFile: Financial Encrumbrances 25 04 2024.pdf3 May 2024
Other - TechnicalFile: Annexure A Order No 50.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: OSTWAL ANAMIKA FORM 3 RERA.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30062024.pdf17 Apr 2024
Deviation Report with respect to Allotment letterFile: Deviation Report_Allotment Lettere_Ostwal Anamika.pdf17 Apr 2024
Layout approvalFile: Layout Revised.pdf13 Apr 2024
Building plan approvalFile: ANAMIKA Grnd n 1st floor.pdf13 Apr 2024
Building plan approvalFile: ANAMIKA Basement.pdf13 Apr 2024
Building plan approvalFile: ANAMIKA 3rd to 4th floor.pdf13 Apr 2024
PAN CardFile: SOBL New Pan Card.pdf13 Apr 2024
Copy of the legal title reportFile: Financial Encrumbrances 25 04 2024.pdf13 Apr 2024
Details of encumbrances concerned to FinanceFile: Legal and Litigation Encumbrances.pdf13 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout Revised.pdf13 Apr 2024
Proforma of Allotment letterFile: Allotment Letter_RERA Format.pdf13 Apr 2024
Declaration in FORM BFile: Form B _Affidavit Cum Declaration.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate 30062024.pdf13 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_OSTWAL ANAMIKA.pdf13 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: ANAMIKA 3rd to 4th floor.pdf13 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: ANAMIKA Basement.pdf13 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: ANAMIKA Grnd n 1st floor.pdf13 Apr 2024
Other - LegalFile: Explanation about land_ RERA Format.pdf13 Apr 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificte.pdf13 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report.pdf13 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration about Separate Bank Account.pdf13 Apr 2024
Details of encumbrances concerned to LegalFile: Legal and Litigation Encumbrances.pdf13 Apr 2024
Other - TechnicalFile: Annexure A _ Order No 50.pdf13 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation of Draft Agreement_RERA Format.pdf13 Apr 2024
Proforma of Agreement for saleFile: Draft Agreement_RERA Format_11zon.pdf13 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST PRAMOTER.pdf13 Apr 2024

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
OSTWAL WOODSP99000019832OPP. UNION PARK, Palghar-Mar 2019CompletedDec 2024Jun 2023
OSTWAL DARSHANP51700004905BHAYANDER EAST, Thane-Aug 2017CompletedDec 2024Registered original: Dec 2023Jun 2024
OSTWAL GARDENKANAKIA ROAD MIRA ROAD EAST69-CompletedDec 2015Jun 2015
OSTWAL OASISMIRA ROAD EAST33-CompletedApr 2015Jan 2015
OSTWAL PRIDE IKANAKIA ROAD MIRA ROAD EAST63-CompletedMar 2015Mar 2015
OSTWAL HEIGHT BLDG 1 TO 4KANAKIA ROAD MIRA ROAD EAST195-CompletedDec 2013Dec 2013

How this compares with Palghar

26%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OSTWAL WOODS III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP. UNION PARK3,200+ in Palghar

2 kmOSTWAL WOODS IIICompleted 4Lapsed / revoked 18Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 51 registered projects within 2 km.

Builder: SHREE OSTWAL BUILDERS LTD

SHREE OSTWAL BUILDERS LTD has 20 registrations on MahaRERA, including OSTWAL DARSHAN and OSTWAL POINT. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if OSTWAL WOODS III is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OSTWAL WOODS III?

The registered promoter entity is SHREE OSTWAL BUILDERS LTD, a company as per the filing. Its CIN U45200MH1989PLC050872 and GSTIN 27AAFCS2523N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OSTWAL WOODS III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OSTWAL WOODS III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OSTWAL WOODS III?

The professionals named in the filing: Architect: VASTUSHILP; Engineer: BHAVESH BHALCHANDRA TODANKAR; Engineer: PRO TECHCONSULTANTS; Engineer: BHAVESH TODANKAR BHAVESH BALCHANDRA TODANKAR; Engineer: BHAVESH TODANKAR; Engineer: SUNIL PAWAR MAHIPAL PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OSTWAL WOODS III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OSTWAL WOODS III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OSTWAL WOODS III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.