Home / Browse projects / Palghar, Maharashtra / MAHAVIR ARCADE
MAHAVIR ARCADE
By MAHAVIR DEVELOPERS AND REALTORS
RG-MH-31836 · RERA P99000080160 · Last updated on MahaRERA portal: 22 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAHAVIR ARCADE is a Commercial project by MAHAVIR DEVELOPERS AND REALTORS in Palghar, Maharashtra, registered with MahaRERA as P99000080160 on 2 May 2025. Possession is promised by 31 Dec 2028. 0 of the 322 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.
At a glance
Project
- NameMAHAVIR ARCADE
- TypeCommercial
- Location
- NEAR RAILWAY STATION
- UMROLI EAST
- Umroli
- Palghar
- 401501
- Pincode401501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000080160
- ReraGenie IDRG-MH-31836
Builder
- NameMAHAVIR DEVELOPERS AND REALTORS
- Entity typePartnership
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 May 2025
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed51 files
Current status
Figures as on 22 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING 2 | NA | 3 | 3 | 0 | 15 | 15 |
| BUILDING 1 | NA | 3 | 0 | 0 | 307 | 307 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.
BUILDING 227%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 20% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING 15%
| Activity | Progress |
|---|---|
| Excavation | 30% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 30% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed207
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership11
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| HITIKSHA HEMANT PURAV | Umroli | Palghar |
| MAHESH DEVENDRA RAUT | Umroli | Palghar |
| RAJESH DEVENDRA RAUT | Umroli | Palghar |
| SANGITA HARESH RAUT | Dahanu (M Cl) | Palghar |
| SANYOG YASHVANT RAUT | Umroli | Palghar |
| VIDULA DEEPAK PATIL | Umroli | Palghar |
| JAYESH YASHWANT RAUT | Umroli | Palghar |
| MANSUKHLAL PRANJIVANDAS SHAH | Umroli | Palghar |
| JAYESH MANSHUKLAL SHAH | Boisar | Palghar |
| KALPESH MANSUKHLAL SHAH | Umroli | Palghar |
| NAYANIT DEVENDRA RAUT | Umroli | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING 1 | NA | Rs 26.24 cr | Rs 26.24 cr |
| - | NA | Rs 3.36 cr | - |
| BUILDING 2 | NA | Rs 1.74 cr | Rs 86.79 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NAMO VASTU DESIGN STUDIO |
| Engineer | DARSH CONSULT |
| Chartered Accountant | S M VISHWAKARMA & CO |
| Partner | Role in project |
|---|---|
| MAHAVIR DEVELOPERS AND REALTORS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed51
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 MARCH 2026.pdf | 22 May 2026 |
| Withdrawal Update Form 2File: FORM 2 MARCH 2026.pdf | 22 May 2026 |
| Withdrawal Update Form 3File: FORM 3 MARCH 2026.pdf | 22 May 2026 |
| Withdrawal Update Form 1File: Mahavir Arcade Form-1.pdf | 7 Mar 2026 |
| Withdrawal Update Form 2File: Mahavir Arcade Form-2.pdf | 7 Mar 2026 |
| Withdrawal Update Form 3File: Mahavir Arcade Form-3_compressed.pdf | 7 Mar 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 12 Nov 2025 |
| Withdrawal Update Form 2File: Form-2_compressed.pdf | 12 Nov 2025 |
| Withdrawal Update Form 3File: Form-3_compressed.pdf | 12 Nov 2025 |
| Copy of the legal title reportFile: 2 Other - Legal.pdf | 21 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: cc VERIFICATION MAIL SCREENSHOT.pdf | 8 Apr 2025 |
| Other - LegalFile: Notarized declaration pannibai_compressed.pdf | 8 Apr 2025 |
| Other - LegalFile: Declaration with Death certificate.pdf | 8 Apr 2025 |
| Other - LegalFile: Notarized Declaration chandrakala_compressed.pdf | 8 Apr 2025 |
| Other - TechnicalFile: cc VERIFICATION MAIL SCREENSHOT.pdf | 8 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Artech Cert20250320_19535779_0116.pdf | 21 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A20250320_19385629_0115.pdf | 21 Mar 2025 |
| Other - TechnicalFile: Untertaking 20250320_19311496_0114.pdf | 21 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Finance Declation20250320_14115684_0068.pdf | 20 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: legal Declation20250320_14043164_0064.pdf | 20 Mar 2025 |
| Declaration in FORM BFile: 500 stamp Declation Developer.pdf | 20 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_compressed.pdf | 20 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 20 Mar 2025 |
| Declaration about Commencement CertificateFile: Declaration CC.pdf | 20 Mar 2025 |
| CERSAI detailsFile: Scurity Declation20250320_14061468_0065.pdf | 20 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: Draft allotment Declation20250320_14073629_0066.pdf | 20 Mar 2025 |
| Details of encumbrances concerned to LegalFile: legal Declation20250320_14043164_0064.pdf | 20 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Finance Declation20250320_14115684_0068.pdf | 20 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Draft sale Declation20250320_14091272_0067.pdf | 20 Mar 2025 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE corrected(Mahavir Builders and Developers).pdf | 20 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Naresh Disclosure20250320_14011226_0063.pdf | 20 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Urmila Disclosure Declation20250320_14164926_0070.pdf | 20 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Bela Disclosure Declation20250320_14143213_0069.pdf | 20 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT-B.pdf | 20 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured 20250320_13244039_0054.pdf | 20 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: aPPENDIX-f mAHAVIR ARCADE.pdf | 18 Mar 2025 |
| Other - LegalFile: Partnership New ( Mahavir ) (1).pdf | 18 Mar 2025 |
| Other - TechnicalFile: aPPENDIX-f mAHAVIR ARCADE.pdf | 18 Mar 2025 |
| Layout approvalFile: SHEET NO1- SITE PLAN_compressed.pdf | 14 Dec 2024 |
| Building plan approvalFile: SHEET NO3- GROUND FLOOR PLAN(BUILDING 1)_compressed.pdf | 14 Dec 2024 |
| Building plan approvalFile: SHEET NO4-FIRST FLOOR PLAN(BUILDING-1)_compressed.pdf | 14 Dec 2024 |
| Building plan approvalFile: SHEET NO5- second and THIRD FLOOR(BUILDING-1)_compressed_compressed.pdf | 14 Dec 2024 |
| Building plan approvalFile: SHEET NO2- BUILDING 2_compressed.pdf | 14 Dec 2024 |
| PAN CardFile: Pan Card.pdf | 14 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: SHEET NO1- SITE PLAN_compressed.pdf | 14 Dec 2024 |
| Proforma of Allotment letterFile: dal.pdf | 14 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC ORIGINAL.pdf | 14 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: SHEET NO3- GROUND FLOOR PLAN(BUILDING 1)_compressed.pdf | 14 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: SHEET NO4-FIRST FLOOR PLAN(BUILDING-1)_compressed.pdf | 14 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: SHEET NO5- second and THIRD FLOOR(BUILDING-1)_compressed_compressed.pdf | 14 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: SHEET NO2- BUILDING 2_compressed.pdf | 14 Dec 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 51 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAHAVIR ARCADE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near UMROLI EAST3,200+ in Palghar
Filed coordinates, straight-line distance. 74 registered projects within 2 km.
Birla Mrida
Birla Estates Private Limited
Roop Rajat Park Phase 3
MAHAVIR ASSOCIATES
AGAMI INFINITY PARK
MAYURESH REALTY PRIVATE LIMITED
Luxury Empire Township Phase I
VEENAA DEVELOPERS PRIVATE LIMITED
SHANTI VISTA - II
SHAH REALTY CORPORATION
KRISHA ARCADE
Nine builders & developers
See every Palghar project, with the district possession charts
Builder: MAHAVIR DEVELOPERS AND REALTORS
MAHAVIR DEVELOPERS AND REALTORS has 1 registration on MahaRERA, including MAHAVIR ARCADE. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if MAHAVIR ARCADE is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAHAVIR ARCADE?
The registered promoter entity is MAHAVIR DEVELOPERS AND REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAHAVIR ARCADE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAHAVIR ARCADE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAHAVIR ARCADE?
The professionals named in the filing: Architect: NAMO VASTU DESIGN STUDIO; Engineer: DARSH CONSULT; Chartered Accountant: S M VISHWAKARMA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHAVIR ARCADE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.