ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Luxury Empire Township Phase I

Registered No litigation declared Others project

Luxury Empire Township Phase I

By VEENAA DEVELOPERS PRIVATE LIMITED

RG-MH-24156 · RERA P99000012256 · Last updated on MahaRERA portal: 3 Aug 2026

Source: official MahaRERA filing

Red flags

  • 8 complaints at MahaRERA
  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 36 months from the original
92 of 154Construction stages doneacross 14 buildings; furthest along: Slabs of Super Structure, 85%
0 of 341Units unsoldnot recorded sold or booked
8Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Luxury Empire Township Phase I is a Others project by VEENAA DEVELOPERS PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000012256 on 1 Sep 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 36 months from the original filing. 341 of the 341 units on this registration are recorded sold or booked, and 92 of 154 construction stages are filed complete. 8 complaints are on record with the regulator.

At a glance

Project

  • NameLuxury Empire Township Phase I
  • TypeOthers
  • Location
    • Opposite Eklavya School Village Kambhalgaon
    • Opposite Eklavya School
    • Kambalgaon
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000012256
  • ReraGenie IDRG-MH-24156

Builder

  • NameVEENAA DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorMeeta Bhavesh Panchal
  • Managing DirectorKaushal Prakash Panchal

Key dates

this monthRegisteredSep 2017First promiseDec 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2025)
  • Buildings14 building records
  • Documents filed81 files

Current status

100%341 of 341 units booked
78.6%Work done, per cost certificate

Figures as on 3 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1 Wing ANA55171532
Building no 1 Wing BNA5518422
Building no 2 Wing ANA5519322
Building no 2 Wing BNA5527936
Building no 2 Wing CNA5518725
Building no 2 Wing DNA4417926
Building no 3 Wing ANA5520020
Building no 1 Wing CNA5518321
Building no 3 Wing BNA5528735
Building no 3 Wing CNA5518725
Building no 4 Wing ANA4420020
Building no 4 Wing BNA5520020
Building no 4 Wing CNA5520020
Building no 4 Wing DNA0012517

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building14

As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

92 of 154 construction stages are filed complete across 14 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

Building No 1 Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building no 1 Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building no 2 Wing A63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Building no 2 Wing B63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Building no 2 Wing C62%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Building no 2 Wing D62%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Building no 3 Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building no 1 Wing C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building no 3 Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building no 3 Wing C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building no 4 Wing A55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Building no 4 Wing B55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Building no 4 Wing C55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Building no 4 Wing D55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes0%
Street LightingYes35%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10
BuildingClosed/CoveredTotal
Building no 1 Wing B11
Building no 2 Wing A11
Building no 2 Wing B11
Building no 2 Wing C11
Building no 3 Wing A11
Building no 1 Wing C11
Building no 3 Wing B11
Building no 3 Wing C11
Building no 4 Wing B11
Building no 4 Wing C11

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area15,660 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Oct 2025
LandownerVillageDistrict
Cosmo InvestmentAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityDistrict Collector Palghar
Permissible FSI19001.77
Proposed, not sanctioned14,002 sq m
Buildings approved14
Buildings sanctioned14

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBund Garden road
Estimated costRs 109.22 cr
Cost incurredRs 85.88 cr
Work done78.63%
BuildingWingEstimatedIncurred
Building no 2 Wing ANARs 9.02 crRs 6.32 cr
Building no 2 Wing BNARs 9.02 crRs 6.32 cr
Building no 2 Wing CNARs 9.02 crRs 6.32 cr
Building no 2 Wing DNARs 9.02 crRs 6.32 cr
Building no 4 Wing ANARs 8.26 crRs 5.45 cr
Building no 4 Wing BNARs 8.26 crRs 5.45 cr
Building no 4 Wing CNARs 8.26 crRs 5.45 cr
Building no 4 Wing DNARs 8.26 crRs 5.45 cr
Building No 1 Wing ANARs 6.41 crRs 6.41 cr
Building no 1 Wing BNARs 6.41 crRs 6.41 cr
Building no 1 Wing CNARs 6.41 crRs 6.41 cr
Building no 3 Wing ANARs 6.24 crRs 6.24 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKetan Sawant
EngineerC L Chheda
Chartered AccountantAshutosh Somani
PartnerRole in project
VEENAA DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA10122518590Dec 2025 → Dec 2028

Reason as filed by the promoter•The project was originally launched by Goldstar Realtors, who abandoned the work midway, affecting over 150 allottees. •After continuous efforts by the Association of Allottees, our company took over the project for revival and completion. •The promoter change under Section 15 was completed in March 2025, after a year-long approval process. •Tripartite Agreements with the Association and individual allottees were executed, providing a realistic completion period of 18-24 months from June 2025, when site work resumed. •Due to the project’s long abandonment, several structures (including previo

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000055652SARIKA DALVIGOLD STAR REALTOR04/08/2018
CC006000000161375Pradeep R DivekarGoldstar Realtors05/11/2019
CC006000000161429Amit Pradeep DivekarGoldstar Realtors05/11/2019
CC006000000395471PRITESH RAMESH DARBARGOLDSTAR REALTORS01/06/2023
CC006000000397243Luxury Empire Phase I Association AllotteeGoldstar Realtors26/08/2023
CC12400122Kunal Pratap ShahGoldstar Realtors16/09/2024
CC12400125Hasmukh Mafatlal GandhiGoldstar Realtors16/09/2024
CC12400297Priti Nimesh SinghGoldstar Realtors01/10/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 -Q1.pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2 - Q1 .pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3- Q1_ Luxury empire.pdf3 Aug 2026
Withdrawal Update Form 1File: Luxury Empire - Form 1 Q-4 .pdf20 Jul 2026
Withdrawal Update Form 2File: luxury Empire - Form 2 Q-4.pdf20 Jul 2026
Withdrawal Update Form 3File: Luxury Empire - Form 3 Q-4 Luxury empire.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 Dec- final.pdf2 Mar 2026
Withdrawal Update Form 2File: VEENA DEVELOPERS RERA-FORM 2 Final.pdf2 Mar 2026
Withdrawal Update Form 3File: Luxury Empire Township_Form-3_31-12-2025_sd_sd.pdf2 Mar 2026
Withdrawal Update Form 1File: 3u003dLuxury Empire Township-Phase-1u003d20251009.pdf4 Dec 2025
Withdrawal Update Form 2File: VEENAA DEVELOPERS-1.pdf4 Dec 2025
Withdrawal Update Form 3File: Form 3 spt 2025 veena devlp..pdf4 Dec 2025
Form 2A (FY 2017-2018)File: Form 2A (3).pdf30 Sep 2025
Form 2A (FY 2018-2019)File: Form 2A (3).pdf30 Sep 2025
Form 2A (FY 2019-2020)File: Form 2A (3).pdf30 Sep 2025
Form 2A (FY 2020-2021)File: Form 2A (3).pdf30 Sep 2025
Form 2A (FY 2021-2022)File: Form 2A (3).pdf30 Sep 2025
Form 2A (FY 2022-2023)File: Form 2A (3).pdf30 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A (3).pdf30 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A (3).pdf30 Sep 2025
Form 2A (FY 2025-2026)File: Form 2A (3).pdf30 Sep 2025
Form 1File: Form 1- Luxury empire.pdf22 Sep 2025
Form 2File: FORM -2 - Luxury empire.pdf22 Sep 2025
Form 3File: Luxury Empire - Form 3_sd (1)_compressed.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Letter-sold unsold inventory submission.pdf22 Sep 2025
Self-declaration of Quarterly ProgressFile: Letter-self declaration on QPR submission.pdf22 Sep 2025
OthersFile: Letter-other year QPR.pdf22 Sep 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)-.pd10 Mar 2025
Other - LegalFile: Undertaking LTR-Asociation (1).pdf20 Feb 2025
Other - LegalFile: Final Order.pdf20 Feb 2025
Other - LegalFile: Gmail - P99000012256 Request for Change of Promoter for Luxury Empire Township Phase 1 Pro20 Feb 2025
Other - LegalFile: RERA Format C Consent-.pdf20 Feb 2025
Other - LegalFile: Correction Consent Stamp (1)_compressed.pdf6 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A with stamp.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (2).pdf6 Feb 2025
Other - LegalFile: Consent with stamp_compressed.pdf1 Feb 2025
Other - LegalFile: Disclosure on query recieve on CC.pdf1 Feb 2025
Other - FinanceFile: Disclosure on query recieve on CC.pdf1 Feb 2025
Layout approvalFile: Sanctioned layout.pdf30 Jan 2025
Layout approvalFile: floor plans B No 1 4 in plot no 43.pdf30 Jan 2025
Copy of Layout Approval (in case of layout)File: Sanctioned layout.pdf30 Jan 2025
Copy of Layout Approval (in case of layout)File: floor plans B No 1 4 in plot no 43.pdf30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 43 Latest CC (1).pdf30 Jan 2025
PAN CardFile: PAN CARD VEENA.pdf22 Jan 2025
Copy of the legal title reportFile: Title Certificate Advocate Certified.pdf22 Jan 2025
Details of encumbrancesFile: Details of encumbrance.pdf22 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrance finance.pdf22 Jan 2025
Details of encumbrancesFile: NIL encumbrance.pdf22 Jan 2025
Details of encumbrances concerned to FinanceFile: Details of encumbrance.pdf22 Jan 2025
Proforma of Allotment letterFile: Annexure I allotment model_compressed.pdf22 Jan 2025
Declaration in FORM BFile: Form B promoter.pdf22 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Architect Certified .pdf22 Jan 2025
Certificates of CA (Form 3)File: Form 3- CA Certified.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certified.pdf22 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Full CC plot 43.pdf22 Jan 2025
Declaration about Commencement CertificateFile: Declare commencement cert.pdf22 Jan 2025
CERSAI detailsFile: CERSAI_Search_Report_200336568092_For_Asset_Based_Search_22_01_2025_22_01_57_980.pdf22 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A separate acc.pdf22 Jan 2025
Deviation Report with respect to Allotment letterFile: Deviation on allotment.pdf22 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrance finance.pdf22 Jan 2025
Details of encumbrances concerned to LegalFile: Details of encumbrance.pdf22 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Deviation on agreement.pdf22 Jan 2025
Proforma of Agreement for saleFile: Final-AFS-RERA-AFS-Luxury Empire.pdf22 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A disclosure of interest.pdf22 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format B Veena developer-Banks letter.pdf22 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured finance.pdf22 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Architect - veenaa.pdf2 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 2 - Engineer Certify-veenaa.pdf2 Jan 2025
Other - FinanceFile: Form 3- CA Certify- veenaa_compressed (1).pdf2 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase 1 Luxury Empire Township-min.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Declaration E I.pdf30 Jul 2017
Certificates of CA (Form 3)File: Declaration I.pdf30 Jul 2017
Building plan approvalFile: 43 CC.pdf29 Jul 2017
Building Plan Approval (IOD)File: 43 CC.pdf29 Jul 2017
Layout approvalFile: 43 Plan Layout.pdf28 Jul 2017
PAN CardFile: GSR PAN CARD.pdf28 Jul 2017
Copy of the legal title reportFile: Legal Tittle of 43.pdf28 Jul 2017
Details of encumbrancesFile: Encumbrances.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: 43 Plan Layout.pdf28 Jul 2017
Declaration in FORM BFile: Form B of 43.pdf28 Jul 2017

How this compares with Palghar

100%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 36 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Luxury Empire Township Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opposite Eklavya School3,200+ in Palghar

2 kmLuxury Empire Township PCompleted 12Lapsed / revoked 13Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: VEENAA DEVELOPERS PRIVATE LIMITED

VEENAA DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including Luxury Empire Township Phase I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Luxury Empire Township Phase I is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Luxury Empire Township Phase I?

The registered promoter entity is VEENAA DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Luxury Empire Township Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Luxury Empire Township Phase I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Luxury Empire Township Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Luxury Empire Township Phase I?

The professionals named in the filing: Architect: Ketan Sawant; Engineer: C L Chheda; Chartered Accountant: Ashutosh Somani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Luxury Empire Township Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Luxury Empire Township Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Luxury Empire Township Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.