Home / Browse projects / Pune, Maharashtra / OSIAN ONE AND ONLY PHASE I

Completed No litigation declared Others project

OSIAN ONE AND ONLY PHASE I

By AHURA BUILDERS

RG-MH-22190 · RERA P52100030568 · Last updated on MahaRERA portal: 7 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
11 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
1 of 96Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

OSIAN ONE AND ONLY PHASE I is a Others project by AHURA BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100030568 on 1 Sep 2021. The registration is recorded completed; possession was promised by 30 Jun 2026. 95 of the 96 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete.

At a glance

Project

  • NameOSIAN ONE AND ONLY PHASE I
  • TypeOthers
  • Location
    • S.NO 85/4
    • CTS NO 1552(PART)
    • MUNDHWA
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030568
  • ReraGenie IDRG-MH-22190

Builder

  • NameAHURA BUILDERS
  • Entity typePartnership
  • PartnersPANKAJ DALICHAND VOHRA, RUKAIYA PARVEZ INAMDAR, KIRTIKUMAR DHARAMCHAND OSWAL, PARVEZ PEERPASHA INAMDAR, PEERPASHA HUSENI ABDULRAZAK INAMDAR, Nilesh Pankaj Vohra, Sameena Hafeez Ahmed
  • Other registrations5 more →
  • Completed4 of 6
  • Declared earlier projects3 →

Key dates

this monthRegisteredSep 2021PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Sep 2021
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed108 files

Current status

99%95 of 96 units booked
99.7%Work done, per cost certificate

Figures as on 7 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
FNA221248048
ENA221248048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

F92%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
E93%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 7 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed96

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots96
Closed/Covered96
BuildingClosed/CoveredTotal
F4848
E4848

Land and ownership20

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,110 sq m
Land owned byThe promoter, with other names on the file
Named landowners20
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Sep 2025
LandownerVillageDistrict
KISHOR VITTHAL DHARWANDKARPune (M Corp.)Pune
EKNATH BALU KHEDEKARPune (CB)Pune
SHIVAPPA S ASANGGIHALPune (M Corp.)Pune
BHIMSHA BAGAPPA DORIGOLPune (M Corp.)Pune
JAFAR ABDUL KADAR KHANPune (M Corp.)Pune
YASMIN A. KADAR KHANPune (M Corp.)Pune
ALIM A. KADAR KHANPune (M Corp.)Pune
RESHMA MOHAMMED ASHRAF KHANPune (M Corp.)Pune
MUZMIL MOHAMMED ASHRAF KHANPune (M Corp.)Pune
MAST.MOHAMMEDKHAIF MOHAMMED ASHRAF KHANPune (M Corp.)Pune
SUDHAKAR TUKARAM KAMBLEPune (M Corp.)Pune
SHANKAR T. KUMBHARPune (M Corp.)Pune
BHIMAPPA VAINKAPPA KRUSHNAPPANWARPune (M Corp.)Pune
VAIJNATH T. KUMBHARPune (M Corp.)Pune
SHIVAPPA S. NASHIPune (M Corp.)Pune
TEJ NARAYAN PANDEPune (M Corp.)Pune
SHAIKH NAEMUNISSA MUNWARPune (M Corp.)Pune
SHAIKH YASMEEN ISAPune (M Corp.)Pune
KHAN MOAHAMMED JAFFAR ABDUL KARDARPune (M Corp.)Pune
ALIM A.KADAR KHANPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI10920.54
Proposed, not sanctioned10,921 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAxis Bank Ltd, Sacred Heart Town, Wanawadi, Pune
Estimated costRs 34.40 cr
Cost incurredRs 34.29 cr
Work done99.68%
BuildingWingEstimatedIncurred
FNARs 15.97 crRs 15.90 cr
ENARs 15.92 crRs 15.89 cr
-NARs 2.50 crRs 2.50 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDEEP HARDIKAR AND ASSOCIATES
ArchitectCubix Architects Associates
EngineerVISHWAGHOSH AHIRE
EngineerCore Management Services
Chartered AccountantCA DILIP K JAIN
Chartered AccountantJatin K. Oswal & Associates
Chartered AccountantManish Ahuja and Associates
PartnerRole in project
AHURA BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Ahura Phase 1 form 1.pdf7 Feb 2026
Withdrawal Update Form 2File: Ahura Phase 1 Form 2 June25 - converted.pdf7 Feb 2026
Withdrawal Update Form 3File: Ahura Form 3_Quarter 2 Phase 1 2025-26 - converted (1).pdf7 Feb 2026
Occupational CertificateFile: Completion Certificate Wing E F and D.pdf7 Feb 2026
Withdrawal Update Form 1File: Form 1 Ahura Phase 1 sept 25 - converted.pdf13 Nov 2025
Withdrawal Update Form 1File: Ahura Phase 1 form 1.pdf13 Nov 2025
Withdrawal Update Form 2File: Form 2 Ahura Phase 1 Sept 25 - converted.pdf13 Nov 2025
Withdrawal Update Form 2File: Ahura Phase 1 Form 2 June25 - converted.pdf13 Nov 2025
Withdrawal Update Form 3File: Ahura Form 3_Quarter 2 Phase 1 2025-26 - converted (1).pdf13 Nov 2025
Withdrawal Update Form 3File: Ahura Form 3_Quarter 2 Phase 1 2025-26 - converted (1).pdf13 Nov 2025
Form 5 (FY 2024-2025)File: ONE AND ONLY PHASE 1_compressed.pdf6 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Phase 1 Ahura_compressed (1).pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Quarter 4 Phase 1 Ahrua_compressed.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Phase 1 Ahura_compressed.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Ahura Mar 25 Phase 1.PDF16 Apr 2025
Other - TechnicalFile: FORM 2A Phase 1 Ahura.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 1 Ahura - converted.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 1 Ahura.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- PHASE 1 Ahura.PDF24 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Ahura Phase 1.PDF24 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- PHASE 1 Ahura.PDF24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sep 24.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sep 24.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep 24.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure- Sep 24.pdf21 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Sep 24.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 .pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate - converted.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate - converted.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- June 24.PDF20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure Ahura builders P1.PDF20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1 Ahura Form 2.PDF6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Phase 1 Ahura Form 2a.PDF6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 1 ahura form 3_compressed.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Phase 1_Ocean one and only.pdf20 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Ahura Phase 1 FY 22-23.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 1 Form 1 Ahura.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1 Form 2 Ahura.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Phase 1 Form 2a Ahura.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Phase 1 Ahura disclosure of sold booked inventory.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 1 form 3 Ahura_compressed.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1 Form 2.pdf27 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Phase 1 Form 2a.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 1 form 3 New_compressed.pdf27 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OSIAN ONE AND ONLY Form 1 PHASE 1.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Phase 1 Ahura disclosure of sold booked inventory.PDF20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_PHASE 1_OSIAN ONE AND ONLY_Q1 JUNE 2023.pdf3 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_PHASE 1_OSIAN ONE AND ONLY_Q1 JUNE 2023.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_PHASE 1_OSIAN ONE AND ONLY_Q1 JUNE 2023.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ahura_Form1_Phase 1.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Phase 1 Ahura disclosure of sold booked inventory.PDF21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 1 Architect Osian one and only.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 1 Engr Cert E and F 31mar23.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Phase 1 Q A _cert_ E and F wings_31mar23.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory Phase 1 Ahura.PDF20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 1 CA certificate.PDF20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality.pdf3 Apr 2023
Other - LegalFile: Reply to show cause notice dated 23_01_2023 _compressed.pdf3 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_Ahura.pdf31 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM_5_AHURA_PHASE_1 FY 2021-22.pdf31 Mar 2023
Details of encumbrances concerned to FinanceFile: PHASE1_DECLARATION OF LEGAL ENCUMBRANCE_OSIAN ONE AND ONLY.PDF6 Mar 2023
Details of encumbrances concerned to LegalFile: PHASE1_DECLARATION OF LEGAL ENCUMBRANCE_OSIAN ONE AND ONLY.PDF6 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: PHASE 1_DECLARATION BANK AC_OSIAN.PDF6 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_PHASE 1_ENGINEERS CERTIFICATE_compressed.pdf3 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A_PHASE 1_QUALITY ASSURANCE.PDF3 Mar 2023
Disclosure of sold/ booked inventoryFile: Disc of Sold Inventary_PHASE 1_Osian One and Only.pdf3 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_PHASE 1_CA_Osian One and Only.pdf3 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: 2 Status of Formation of Legal Entity (Society_Co Op etc.pdf20 Jan 2023
Status of ConveyanceFile: 2 Status of Conveyance (1).pdf20 Jan 2023
Layout approvalFile: scan1321 Layout_compressed.pdf25 Nov 2022
Building plan approvalFile: scan1330 f bldg.pdf25 Nov 2022
Building plan approvalFile: scan1328-E Bldg.pdf25 Nov 2022
Copy of Layout Approval (in case of layout)File: scan1321 Layout_compressed.pdf25 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: scan1330 f bldg.pdf25 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: scan1328-E Bldg.pdf25 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf25 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ahura Builders (2)_compressed.pdf1 Oct 2022

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OSIAN ONE AND ONLY PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUNDHWA13,700+ in Pune

2 kmOSIAN ONE AND ONLY PHASECompleted 19Lapsed / revoked 12Other 89Dot size: filed unitsN

Filed coordinates, straight-line distance. 120 registered projects within 2 km.

Builder: AHURA BUILDERS

AHURA BUILDERS has 6 registrations on MahaRERA, including THE LATITUDE - D and CORE. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if OSIAN ONE AND ONLY PHASE I is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OSIAN ONE AND ONLY PHASE I?

The registered promoter entity is AHURA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OSIAN ONE AND ONLY PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OSIAN ONE AND ONLY PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OSIAN ONE AND ONLY PHASE I?

The professionals named in the filing: Architect: SANDEEP HARDIKAR AND ASSOCIATES; Architect: Cubix Architects Associates; Engineer: VISHWAGHOSH AHIRE; Engineer: Core Management Services; Chartered Accountant: CA DILIP K JAIN; Chartered Accountant: Jatin K. Oswal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OSIAN ONE AND ONLY PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OSIAN ONE AND ONLY PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OSIAN ONE AND ONLY PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.