Home / Browse projects / Pune, Maharashtra / OMKAR MEGHDOOT RESIDENCY

Registered No litigation declared Residential / Group Housing project

OMKAR MEGHDOOT RESIDENCY

By OMKAR LANDMARKS

RG-MH-92315 · RERA P52100055603 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
36 of 38Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

OMKAR MEGHDOOT RESIDENCY is a Residential / Group Housing project by OMKAR LANDMARKS in Pune, Maharashtra, registered with MahaRERA as P52100055603 on 4 Apr 2024. Possession is promised by 31 Mar 2027. 2 of the 38 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameOMKAR MEGHDOOT RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • RAJHANS SOCIETY
    • GULTEKDI
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411037
  • Pincode411037
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055603
  • ReraGenie IDRG-MH-92315

Builder

  • NameOMKAR LANDMARKS
  • Entity typePartnership
  • PartnerROHAN GOPIKISHAN AGARWAL

Key dates

this monthRegisteredApr 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Apr 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

5%2 of 38 units booked
15.9%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OMKAR MEGHDOOT RESIDENCYNA9738038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

OMKAR MEGHDOOT RESIDENCY: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed122

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots122
Closed/Covered103
Open Space19

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,086 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
RAJHANS CO-OPERATIVE HSG SOC LTDPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI3570.9
Proposed, not sanctioned3,571 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1,2,3 Gr Flr-4, 2149, Keyur Apartments, Sadashiv Peth, Pune- 411030
Estimated costRs 12.07 cr
Cost incurredRs 1.92 cr
Work done15.91%
BuildingWingEstimatedIncurred
OMKAR MEGHDOOT RESIDENCYNARs 12.07 crRs 1.92 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectankur associates
EngineerJIVAN GAIKWAD
Chartered AccountantSAC & CO LLP
Chartered AccountantRakesh Narendra Oswal
PartnerRole in project
OMKAR LANDMARKS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600138Ram GawaliOMKAR LANDMARKS11/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 Sign.pdf1 Jul 2026
Withdrawal Update Form 1File: Q4 FY 25-26 Form 1 Omr.pdf1 May 2026
Withdrawal Update Form 2File: Form 2 OMKAR MEGHDOOT RESIDENCY.pdf1 May 2026
Withdrawal Update Form 3File: Form 3 OMKAR MEGHDOOT RESIDENCY 31032026 sign.pdf1 May 2026
Withdrawal Update Form 1File: Form-1.pdf24 Jan 2026
Withdrawal Update Form 2File: Form-2.pdf24 Jan 2026
Withdrawal Update Form 3File: Final Form-3 31-12-2025_compressed.pdf24 Jan 2026
Building plan approvalFile: Building plan_compressed.pdf11 Dec 2025
Layout approvalFile: Ground Floor_compressed.pdf11 Dec 2025
Layout approvalFile: Floor 1st and 2nd_compressed.pdf11 Dec 2025
Layout approvalFile: Floor 3rd and 4th_compressed.pdf11 Dec 2025
Layout approvalFile: Floor 5th and 6th_compressed.pdf11 Dec 2025
Layout approvalFile: Floor 7th_compressed.pdf11 Dec 2025
Withdrawal Update Form 1File: Form-1.pdf11 Dec 2025
Withdrawal Update Form 2File: Form-2.pdf11 Dec 2025
Withdrawal Update Form 3File: Form-3_compressed.pdf11 Dec 2025
Withdrawal Update Form 1File: FORM 1.pdf19 Nov 2025
Withdrawal Update Form 2File: Form-2 Engineeru0027s Certificate.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3 OMKAR MEGHDOOT RESIDENCY 30-06-2025 sign.pdf19 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- compressed.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 30-09-2024.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 31-12-2024.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From -2 30-06-2024.pdf28 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OMKAR MEGHDOOT RESIDENCY 30-06-2024.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OMKAR MEGHDOOT RESIDENCY 30-09-2024.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OMKAR MEGHDOOT RESIDENCY 31-12-2024.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate OMR.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 .pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 .pdf19 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Other - Legal.pdf28 Mar 2024
Other - TechnicalFile: Annexure A -Order No 50.pdf28 Mar 2024
Other - TechnicalFile: 2 Commencement Certificates _ NA Order for plotted development (7).pdf28 Mar 2024
Other - LegalFile: Partnership Deed English True Copy.pdf19 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_11zon.pdf8 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A (2).pdf8 Mar 2024
Layout approvalFile: Sanction 1.pdf4 Mar 2024
Building plan approvalFile: Sanction 2.pdf4 Mar 2024
Building plan approvalFile: Sanction 3.pdf4 Mar 2024
Building plan approvalFile: Sanction 4.pdf4 Mar 2024
Building plan approvalFile: Sanction 5.pdf4 Mar 2024
Building plan approvalFile: Sanction 6.pdf4 Mar 2024
Copy of the legal title reportFile: 2 Title Report.pdf4 Mar 2024
Copy of Layout Approval (in case of layout)File: Sanction 1.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction 2.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction 3.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction 4.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction 5.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction 6.pdf4 Mar 2024
Declaration in FORM BFile: 9 Affidavit Form B Notary.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form 1 Architect Certtificate.pdf4 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Manusha Rohan Agarwal.pdf4 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A -Rohan Gopikishan Agarwal.pdf4 Mar 2024
Proforma of Allotment letterFile: Allotment Letter.pdf4 Mar 2024
Other - LegalFile: Annexure A Declaration Undertaking.pdf4 Mar 2024
Other - LegalFile: Mail Send Sch Shot.pdf1 Mar 2024
PAN CardFile: 1 Firm Pancards.pdf24 Feb 2024
Details of encumbrances concerned to FinanceFile: 3 Non Encumbrance Legal Finance Letter.pdf24 Feb 2024
Details of encumbrances concerned to LegalFile: 3 Non Encumbrance Legal Finance Letter.pdf24 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 6 Commencement Certificate.pdf24 Feb 2024
Declaration about Commencement CertificateFile: 7 Declaration Commencement Certificate.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 Engineer Certificate.pdf24 Feb 2024
CERSAI detailsFile: 11 No Security Interest Ceated.pdf24 Feb 2024
Proforma of Agreement for saleFile: AFS-Omkar Meghdoot Residency.pdf24 Feb 2024
Deviation Report with respect to Allotment letterFile: 15 Deviation Report Alloment Letter.pdf24 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report of AFS_Omkar Meghdoot Residency_Ms Omkar Landmark_19032024.pdf24 Feb 2024

How this compares with Pune

5%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OMKAR MEGHDOOT RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GULTEKDI13,700+ in Pune

2 kmOMKAR MEGHDOOT RESIDENCYCompleted 66Lapsed / revoked 39Other 110Dot size: filed unitsN

Filed coordinates, straight-line distance. 215 registered projects within 2 km.

Builder: OMKAR LANDMARKS

OMKAR LANDMARKS has 1 registration on MahaRERA, including OMKAR MEGHDOOT RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if OMKAR MEGHDOOT RESIDENCY is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OMKAR MEGHDOOT RESIDENCY?

The registered promoter entity is OMKAR LANDMARKS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OMKAR MEGHDOOT RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against OMKAR MEGHDOOT RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for OMKAR MEGHDOOT RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OMKAR MEGHDOOT RESIDENCY?

The professionals named in the filing: Architect: ankur associates; Engineer: JIVAN GAIKWAD; Chartered Accountant: SAC & CO LLP; Chartered Accountant: Rakesh Narendra Oswal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OMKAR MEGHDOOT RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OMKAR MEGHDOOT RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OMKAR MEGHDOOT RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.