ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Omkar Heights

Registration lapsed No litigation declared Others project

Omkar Heights

By Ganga Estate Developers

RG-MH-85674 · RERA P51700010265 · Last updated on MahaRERA portal: 15 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 3 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
8 of 11Construction stages donefurthest along: Staircases, 90%
3Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Omkar Heights is a Others project by Ganga Estate Developers in Thane, Maharashtra, registered with MahaRERA as P51700010265 on 24 Aug 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 48 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameOmkar Heights
  • TypeOthers
  • Location
    • Bhopar
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010265
  • ReraGenie IDRG-MH-85674

Builder

  • NameGanga Estate Developers
  • Entity typePartnership
  • PartnerAnand Mulraj Thakkar

Key dates

22 months past promisethis monthRegisteredAug 2017First promiseDec 2020Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Aug 2017
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Dec 2020)
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Omkar A wing B wing and B1 wingNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

Omkar A wing B wing and B1 wing: 96% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 15 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Closed/Covered1
Open Space60

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,480 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI16327.94
Proposed, not sanctioned6,654 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLBS Road, Ghatkopar West, Mumbai - 400086

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDilip D Deshmukh
EngineerMs S V Patel and Associates
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantGaurav S Rajpal & Co
PartnerRole in project
Ganga Estate Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700011229Dec 2020 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 65.25% allottees for purpose of extension of RERA registration period of the said project

EXT51700009140Dec 2020 → Dec 2021

Reason as filed by the promoterWe would like to extend the completion date of our project Omkar Heights bearing RERA Number P51700010265. The revised date of completion shall be 30th December 2021. The delay is on the account of procedural delay in application of Occupation Certificate.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000199154Pravin Hindurao ShindeAnand Mulraj Thakkar11/01/2022
CC12501509HT MEDIA LIMITEDGanga Estate Developers06/05/2025
CC12501511HT MEDIA LIMITEDGanga Estate Developers06/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf15 Feb 2025
Certificates of CA (Form 3)File: 11 Certificates of CA (Form 3).pdf15 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf15 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf16 Jul 2024
Certificates of CA (Form 3)File: 10 Certificates of CA (Form 3).pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Omkar Heights as on Sept 2023.pdf31 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Omkar Heights as on Dec 2023.pdf31 Jan 2024
Certificates of CA (Form 3)File: Form 3 - Omkar Heights as on Dec 2023.pdf31 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Omkar Heights as on June 2023.pdf28 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Omkar Heights as on Sept 2023.pdf28 Dec 2023
Certificates of CA (Form 3)File: Form 3 Omkar Heights 30th June 2023.pdf28 Dec 2023
Certificates of CA (Form 3)File: Form 3 Omkar Heights 30th September 2023.pdf28 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf19 Aug 2023
Declaration about Commencement CertificateFile: Declaration of CC.pdf11 Aug 2023
Declaration in FORM BFile: GED Rera Affidavit cum Declaration -2023.pdf11 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (Dec 2021).pdf11 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (March 2022).pdf11 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (June 2022).pdf11 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (Sep 2022).pdf11 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (Dec 2022).pdf11 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (March 2023).pdf11 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A (19-20).pdf11 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A (20-21).pdf11 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A (21-22).pdf11 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A (22-23).pdf11 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf11 Aug 2023
Certificates of CA (Form 3)File: Form 3 (Dec 21)_compressed.pdf11 Aug 2023
Certificates of CA (Form 3)File: Form 3 (March 22)_11zon.pdf11 Aug 2023
Certificates of CA (Form 3)File: Form 3 (June 22)_11zon.pdf11 Aug 2023
Certificates of CA (Form 3)File: Form 3 (Sep22)_11zon.pdf11 Aug 2023
Certificates of CA (Form 3)File: Form 3 (Dec 22)_11zon.pdf11 Aug 2023
Certificates of CA (Form 3)File: Form 3 (March 23)_11zon.pdf11 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: ilovepdf_merged (19).pdf4 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 2017-2018.pdf18 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-2019.pdf18 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-2020.pdf18 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-2021.pdf18 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-2022.pdf18 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 2022-2023.pdf18 Jul 2023
CERSAI detailsFile: Omkar Heights.pdf23 Dec 2022
Building plan approvalFile: CC-1.pdf31 Jul 2017
Layout approvalFile: Layout GED.pdf31 Jul 2017
Building plan approvalFile: CC-2.pdf31 Jul 2017
PAN CardFile: PAN- GED.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrance.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout GED.pdf31 Jul 2017
Building Plan Approval (IOD)File: CC-1.pdf31 Jul 2017
Building Plan Approval (IOD)File: CC-2.pdf31 Jul 2017
Declaration in FORM BFile: Affidavit Cum Declaration (1).pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert GED_pg1.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert GED_pg2and3.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert GED_pg4and5.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GED_SE_Pg1.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GED_SE_Pg2.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GED_SE_Pg3.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Cert GED.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment Letter GED.pdf31 Jul 2017
Proforma of Allotment letterFile: Proforma Flat Sale Agreement GED.pdf31 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 48 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Omkar Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhopar7,600+ in Thane

2 kmOmkar HeightsCompleted 10Lapsed / revoked 11Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 53 registered projects within 2 km.

Builder: Ganga Estate Developers

Ganga Estate Developers has 1 registration on MahaRERA, including Omkar Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Omkar Heights shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Omkar Heights is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Omkar Heights?

The registered promoter entity is Ganga Estate Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Omkar Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Omkar Heights?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Omkar Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Omkar Heights?

The professionals named in the filing: Architect: Dilip D Deshmukh; Engineer: Ms S V Patel and Associates; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: Gaurav S Rajpal & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Omkar Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Omkar Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Omkar Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.