ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / OM TRIMURTI DARSHAN

Registered No litigation declared Residential / Group Housing project

OM TRIMURTI DARSHAN

By PRACHI GROUP

RG-MH-06649 · RERA P51700053133 · Last updated on MahaRERA portal: 19 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedmoved 12 months from the original
6 of 11Construction stages donefurthest along: Staircases, 80%
28 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

OM TRIMURTI DARSHAN is a Residential / Group Housing project by PRACHI GROUP in Thane, Maharashtra, registered with MahaRERA as P51700053133 on 16 Oct 2023. Possession is promised by 30 Aug 2027. The completion date has moved by 12 months from the original filing. 7 of the 35 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameOM TRIMURTI DARSHAN
  • TypeResidential / Group Housing
  • Location
    • NANDIVALI PANCHANAND
    • DOMBIVLI EAST
    • NANDIVALI
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053133
  • ReraGenie IDRG-MH-06649

Builder

  • NamePRACHI GROUP
  • Entity typePartnership
  • PartnersGAUTAM KUMAR PRATAPMAL MALVIYA, EJAZ FAROOQ PATEL, SUMIT ASHOK PATIL, RAVINDRA DASARATH PATIL

Key dates

this monthRegisteredOct 2023First promiseAug 2026Revised toAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2023
  • Promised completion30 Aug 2027
  • Revised completionRevised to 30 Aug 2027 (originally 30 Aug 2026)
  • Buildings1 building record
  • Documents filed59 files

Current status

20%7 of 35 units booked
59.5%Work done, per cost certificate

Figures as on 19 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OM TRIMURTI DARSHANNA8735035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

OM TRIMURTI DARSHAN: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered14
Open Space42

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area835 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 May 2026
LandownerVillageDistrict
GAJANAN AMBO MHATREDOMBIVLIThane
OM TRIMURTI DARSHAN CO OP HOUSING SOCIETYDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI1939.26
Proposed, not sanctioned1,939 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHE UNITED WESTERN BANK LTD., RAMNAGAR DOMBIVALI BRANCH,, COMMERCE CENTRE, TANDON ROAD, OPP PARKAR SADAN, DOMBIVALI-E, PINCODE - 421201
Estimated costRs 6.00 cr
Cost incurredRs 3.57 cr
Work done59.5%
BuildingWingEstimatedIncurred
OM TRIMURTI DARSHANNARs 5.10 crRs 3.57 cr
-NARs 90.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectU C ASSOCIATES
EngineerRAJESH THAKARE & ASSOCIATES
Chartered AccountantCA HIREN K CHHEDA
Chartered AccountantRAMBHIA & DEDHIA
PartnerRole in project
PRACHI GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA10092622502Aug 2026 → Aug 2027

Reason as filed by the promoterFinancial constraints, supply chain disruptions and same was affecting booking and secondly, revised CC received on 24th June, 2026, we have applied for correction of project but process got delayed and extension period near to expire and we are waiting to approve correction application and thereafter can file extension of project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Aug 2027

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form_2A_31_03_2025.pdf19 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A_31_03_2026.pdf19 Aug 2026
Form 5 (FY 2025-2026)File: FORM 5_31_03_2026.pdf19 Aug 2026
Withdrawal Update Form 1File: Form 1_30_06_2026.pdf17 Aug 2026
Withdrawal Update Form 2File: Form_2_30_06_2026.pdf17 Aug 2026
Withdrawal Update Form 3File: Form_3_30_06_2026.pdf17 Aug 2026
Building plan approvalFile: Revised Layout.pdf13 May 2026
Withdrawal Update Form 1File: Form_1_Prachi Group.pdf8 May 2026
Withdrawal Update Form 2File: Form 2_Prachi Group.pdf8 May 2026
Withdrawal Update Form 3File: Form 3_Prachi Group.pdf8 May 2026
Withdrawal Update Form 1File: Form_1_30_06_2025.pdf24 Mar 2026
Withdrawal Update Form 1File: Form_1_30_09_2025.pdf24 Mar 2026
Withdrawal Update Form 1File: Form_1_31_12_2025.pdf24 Mar 2026
Withdrawal Update Form 2File: Form_2_30_06_2025.pdf24 Mar 2026
Withdrawal Update Form 2File: Form 2_30_09_2025.pdf24 Mar 2026
Withdrawal Update Form 2File: Form_2_31_12_2025.pdf24 Mar 2026
Withdrawal Update Form 3File: Form_3_30_06_2025.pdf24 Mar 2026
Withdrawal Update Form 3File: Form_3_30_09_2025.pdf24 Mar 2026
Withdrawal Update Form 3File: Form_3_31-12-2025.pdf24 Mar 2026
Form 5 (FY 2024-2025)File: FORM 5_31_03_2025_Signed.pdf24 Mar 2026
Form 5 (FY 2023-2024)File: Form_5_31_03_2024.pdf24 Mar 2026
Form 1File: Form_1_31_03_2025.pdf13 Jun 2025
Form 2File: Form_2_31_03_2025.pdf13 Jun 2025
Form 3File: CA Certificate_Form 3_Signed.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and Book Inventory_Om Trimurti_31_03_2025.pdf13 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration_Om Trimurti_31_03_2025.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_30_09_2024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_31_12_2024.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30_09_2024.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_31_12_2024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_1_30_09_2024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_31_12_2024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf3 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Structurer Engineer Certificate.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf3 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual Report.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certificate_Prachi Group.pdf5 Oct 2023
Copy of the legal title reportFile: Legal Title Report_238.pdf16 Sep 2023
Declaration in FORM BFile: Affidavit_Form B.pdf16 Sep 2023
Layout approvalFile: Layout Approval.pdf2 Sep 2023
Building plan approvalFile: Layout Approval.pdf2 Sep 2023
PAN CardFile: PAN_Prachi Group.pdf2 Sep 2023
Copy of the legal title reportFile: Legal Title Report .pdf2 Sep 2023
Details of encumbrances concerned to FinanceFile: Encumbrance.pdf2 Sep 2023
Details of encumbrances concerned to LegalFile: Encumbrance.pdf2 Sep 2023
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf2 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout Approval.pdf2 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf2 Sep 2023
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate.pdf2 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf2 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate.pdf2 Sep 2023
CERSAI detailsFile: CERSAI.pdf2 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Projects.pdf2 Sep 2023
Proforma of Agreement for saleFile: SALE AGREEMENT_As Per RERA.pdf2 Sep 2023
Proforma of Allotment letterFile: Allotment Letter.pdf2 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Account.pdf2 Sep 2023
Deviation Report with respect to Allotment letterFile: NO Deviation in Allotment Letter.pdf2 Sep 2023
Deviation Report with respect to model copy of AgreementFile: NO Deviation in Sale Agreement.pdf2 Sep 2023

How this compares with Thane

20%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OM TRIMURTI DARSHAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DOMBIVLI EAST7,600+ in Thane

Builder: PRACHI GROUP

PRACHI GROUP has 1 registration on MahaRERA, including OM TRIMURTI DARSHAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if OM TRIMURTI DARSHAN is delayed beyond 30 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM TRIMURTI DARSHAN?

The registered promoter entity is PRACHI GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM TRIMURTI DARSHAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OM TRIMURTI DARSHAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM TRIMURTI DARSHAN?

The professionals named in the filing: Architect: U C ASSOCIATES; Engineer: RAJESH THAKARE & ASSOCIATES; Chartered Accountant: CA HIREN K CHHEDA; Chartered Accountant: RAMBHIA & DEDHIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM TRIMURTI DARSHAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM TRIMURTI DARSHAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM TRIMURTI DARSHAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.