Home / Browse projects / Thane, Maharashtra / OM SAMAPRIYA COMPLEX BLDG.NO-1

Registered No litigation declared Residential / Group Housing project

OM SAMAPRIYA COMPLEX BLDG.NO-1

By OMKAR REALTORS

RG-MH-28602 · RERA P51700026753 · Last updated on MahaRERA portal: 18 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 27 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 27 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 95%
24 of 53Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

OM SAMAPRIYA COMPLEX BLDG.NO-1 is a Residential / Group Housing project by OMKAR REALTORS in Thane, Maharashtra, registered with MahaRERA as P51700026753 on 22 Oct 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 27 months from the original filing. 29 of the 53 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameOM SAMAPRIYA COMPLEX BLDG.NO-1
  • TypeResidential / Group Housing
  • Location
    • SHIVAJI NAGAR
    • KALYAN
    • DOMBIVLI
    • Thane
    • 421202
  • Pincode421202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700026753
  • ReraGenie IDRG-MH-28602

Builder

  • NameOMKAR REALTORS
  • Entity typePartnership
  • GSTIN27AACFO1576H2Z6
  • Designated PartnersNARENDRA BHABHUTMAL SHAH, RAMESH SURAJMAL JAIN, NEETA JAGDISH VAITI
  • Other registrations3 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2020First promiseSep 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Oct 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Sep 2024)
  • Buildings1 building record
  • Documents filed151 files

Current status

55%29 of 53 units booked
88.5%Work done, per cost certificate

Figures as on 18 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OM SAMAPRIYA COMPLEX BLDG NO-1NA161453053

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.

OM SAMAPRIYA COMPLEX BLDG NO-1: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor95%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,140 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Apr 2026
LandownerVillageDistrict
LAXMAN VALKYA BHOIR and MRS SARIKA RAVINDRA BHOIRDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan-Dombivli Municipal Corporation
Permissible FSI3123.32
Proposed, not sanctioned3,123 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOREGAON WAST
Estimated costRs 12.00 cr
Cost incurredRs 10.62 cr
Work done88.52%
BuildingWingEstimatedIncurred
OM SAMAPRIYA COMPLEX BLDG NO-1NARs 10.20 crRs 9.69 cr
-NARs 1.80 crRs 93.29 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLANDMARK GROUP
EngineerRAJESH THAKARE AND ASSOCIATES THAKARE
Chartered AccountantAJAY SHAH AND CO
Chartered AccountantADIT AJAY SHAH
PartnerRole in project
OMKAR GRUH NIRMAN LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700026005Sep 2024 → Dec 2025

Reason as filed by the promoterReasons for delay in completion of our project G + 14 floors- 1. We have revised the plan for the complex having - 4 Numbers of buildings, including the present ongoing building (Stilt +14 floors) and for the said complex we have taken permission from SEIAA Maharashtra having EC identification No. EC23B038MH160813 dated: 11/12/2023. An approval & sanction from Municipal Corporation of Kalyan Dombivli is under process and the same is expected to be finalized within months’ time. 2. Bookings have slowed down in the past few months. We are having a shortage of funds due to low or no bookings in t

EA29042620769Sep 2024 → Dec 2026

Reason as filed by the promoterThe promoter, Omkar Gruh Nirman LLP, seeks a completion date extension for the project Om Sampriya Complex Bldg No. 1 (P51700026753) from 31.12.2025 to 31.12.2026 under Section 7(3) of the RERA Act, 2016. 1. 100 Percent Allottee Consent The primary basis for this request is the proactive support of our homebuyers. As of 25th Dec 2025, we secured 100 percent written consent from all allottees. Stakeholders are fully aware of progress and collectively desire project completion. Granting this serves the Greater Public Interest (MahaRERA Order 40/2022) by avoiding complications of a stalled projec

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate.pdf18 May 2026
Withdrawal Update Form 2File: engineers certificate.pdf18 May 2026
Withdrawal Update Form 3File: From 3 CA.pdf18 May 2026
Form 5 (FY 2025-2026)File: FY 2025 26.pdf23 Apr 2026
Form 5 (FY 2024-2025)File: 2024-25.pdf30 Mar 2026
Form 1File: 30 06 2022.pdf28 Mar 2026
Form 2File: 30 06 2022.pdf28 Mar 2026
Form 3File: 30 6 2022.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 30 06 2022.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 30 09 2022.pdf28 Mar 2026
Form 1File: 30 09 2022.pdf28 Mar 2026
Form 2File: 30 09 2022.pdf28 Mar 2026
Form 3File: 30 9 2022.pdf28 Mar 2026
Form 3File: 31 12 2022.pdf28 Mar 2026
Form 1File: 31 12 2022.pdf28 Mar 2026
Form 2File: 31 12 2022.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 31 12 2022.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 31 03 2023.pdf28 Mar 2026
Form 1File: 31 03 2023.pdf28 Mar 2026
Form 2File: 31 03 2023.pdf28 Mar 2026
Form 3File: 31 03 2023.pdf28 Mar 2026
Form 3File: 30 06 2023.pdf28 Mar 2026
Form 1File: 30 06 2023.pdf28 Mar 2026
Form 2File: 30 06 2023.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 30 06 2023.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 30 09 2023.pdf28 Mar 2026
Form 1File: 30 09 2023.pdf28 Mar 2026
Form 2File: 30 09 2023.pdf28 Mar 2026
Form 3File: 30 09 2023.pdf28 Mar 2026
Form 3File: 31 12 2023.pdf28 Mar 2026
Form 1File: 31 12 2023.pdf28 Mar 2026
Form 2File: 31 12 2023.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 31 12 2023.pdf28 Mar 2026
Form 1File: 31 03 2024.pdf28 Mar 2026
Form 2File: 31 03 2024.pdf28 Mar 2026
Form 3File: 31 03 2024.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 31 03 2024.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 30 06 2024.pdf28 Mar 2026
Form 1File: 30 06 2024.pdf28 Mar 2026
Form 2File: 30 06 2024.pdf28 Mar 2026
Form 3File: 30 06 2024.pdf28 Mar 2026
Form 3File: 30 09 2024.pdf28 Mar 2026
Form 1File: 30 09 2024.pdf28 Mar 2026
Form 2File: 30 09 2024.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 30 09 2024.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 31 12 2024.pdf28 Mar 2026
Form 1File: 31 12 2024.pdf28 Mar 2026
Form 2File: 31 12 2024.pdf28 Mar 2026
Form 3File: 31 12 2024.pdf28 Mar 2026
Form 3File: 31 03 2025.pdf28 Mar 2026
Form 1File: 31 03 2025.pdf28 Mar 2026
Form 2File: 31 03 2025.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 31 03 2025.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 30 06 2025.pdf28 Mar 2026
Form 1File: 30 06 2025.pdf28 Mar 2026
Form 2File: 30 06 2025.pdf28 Mar 2026
Form 3File: 31 06 2025.pdf28 Mar 2026
Form 3File: 30 09 2025.pdf28 Mar 2026
Form 1File: 30 09 2025.pdf28 Mar 2026
Form 2File: 30 09 2025.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 30 09 2025.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: 31 12 2025.pdf28 Mar 2026
Form 1File: 31 12 2025.pdf28 Mar 2026
Form 2File: 31 12 2025.pdf28 Mar 2026
Form 3File: 31 12 2025.pdf28 Mar 2026
Form 2A (FY 2025-2026)File: 31 12 2025.pdf28 Mar 2026
Form 5 (FY 2022-2023)File: 1 04 2022 31 03 2023.pdf28 Mar 2026
Form 5 (FY 2023-2024)File: 1 04 2023 31 03 2024.pdf28 Mar 2026
Form 1File: 31 12 2020.pdf27 Mar 2026
Form 2File: 31 12 2020.pdf27 Mar 2026
Disclosure of Sold and Booked InventoryFile: 31 12 2020.pdf27 Mar 2026
Form 3File: 31 12 2020-compressed.pdf27 Mar 2026
Form 1File: 31 03 2021.pdf27 Mar 2026
Form 2File: 31 03 2021.pdf27 Mar 2026
Form 3File: 31 03 2021-compressed.pdf27 Mar 2026
Disclosure of Sold and Booked InventoryFile: 31 03 2021.pdf27 Mar 2026
Form 1File: 30 06 2021.pdf27 Mar 2026
Form 2File: 30 06 2021.pdf27 Mar 2026
Form 3File: 30 06 2021_compressed.pdf27 Mar 2026
Disclosure of Sold and Booked InventoryFile: 30 06 2021.pdf27 Mar 2026

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
KRUSHNAIP51700010252DOMBIVLI, Thane26Aug 2017CompletedOct 2020Registered original: Apr 2018Jan 2020
PRAMOD SMRUTIP51700009396DOMBIVLI, Thane20Aug 2017CompletedMar 2019Late, Jun 2019

How this compares with Thane

55%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 27 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OM SAMAPRIYA COMPLEX BLDG.NO-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALYAN7,600+ in Thane

2 kmOM SAMAPRIYA COMPLEX BLDCompleted 47Lapsed / revoked 39Other 71Dot size: filed unitsN

Filed coordinates, straight-line distance. 157 registered projects within 2 km.

Builder: OMKAR REALTORS

OMKAR REALTORS has 4 registrations on MahaRERA, including OM SAMAPRIYA COMPLEX BLDG.NO-1 and SHREE JAGANNATH TOWER. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if OM SAMAPRIYA COMPLEX BLDG.NO-1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM SAMAPRIYA COMPLEX BLDG.NO-1?

The registered promoter entity is OMKAR REALTORS, a partnership as per the filing. Its GSTIN 27AACFO1576H2Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM SAMAPRIYA COMPLEX BLDG.NO-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OM SAMAPRIYA COMPLEX BLDG.NO-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM SAMAPRIYA COMPLEX BLDG.NO-1?

The professionals named in the filing: Architect: LANDMARK GROUP; Engineer: RAJESH THAKARE AND ASSOCIATES THAKARE; Chartered Accountant: AJAY SHAH AND CO; Chartered Accountant: ADIT AJAY SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM SAMAPRIYA COMPLEX BLDG.NO-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM SAMAPRIYA COMPLEX BLDG.NO-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM SAMAPRIYA COMPLEX BLDG.NO-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.