Home / Browse projects / Mumbai City, Maharashtra / Om Gopal - Floor 3 to 9
Om Gopal - Floor 3 to 9
By Omkar Realtors and Developers Private Limited
RG-MH-21197 · RERA P51900012360 · Last updated on MahaRERA portal: 30 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 7 complaints at MahaRERA
- Completion date moved by 66 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Om Gopal - Floor 3 to 9 is a Commercial project by Omkar Realtors and Developers Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900012360 on 1 Sep 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 66 months from the original filing. 7 complaints are on record with the regulator.
At a glance
Project
- NameOm Gopal - Floor 3 to 9
- TypeCommercial
- Location
- GNorth-400028
- Ward GNorth
- Mumbai City
- 400028
- Pincode400028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900012360
- ReraGenie IDRG-MH-21197
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on1 Sep 2017
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2020)
- Buildings1 building record
- Documents filed251 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Om Gopal | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.
Om Gopal: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed103
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anand Dhokay |
| Engineer | Mr. Harshad Gokhani |
| Engineer | PRASAD SHETTY |
| Chartered Accountant | SSMG & ASSOCIATES LLP |
| Chartered Accountant | CHETAN S TAK & COMPANY |
| Chartered Accountant | NILESH JAIN & ASSOCIATES |
| Chartered Accountant | N SOMANI & CO |
| Chartered Accountant | G Y & CO |
| Chartered Accountant | N A SHAH ASSOCIATES LLP |
| Partner | Role in project |
|---|---|
| Omkar Realtors and Developers Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterA. Economic downturn and Demonetization:- Due to economic downturn / crises and demonetization, the flats could not be sold in the market and hence the Promoter could not generate the required funds for construction purpose which caused delay in the Project. B. Force majeure (COVID 19 Pandemic):- Due to Covid -19 pandemic all construction activities was stalled. For this neither the Promoter nor any authority could provide any assistance. C. Eligibility Process was delayed:- This being a slum rehabilitation project, FSI is generated from eligibility of the slum dwellers. In our case, the eligi
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 6231/2016 | High Court | Pending |
| 20646/2013 | High Court | Pending |
| 5499/2006 | City Civil Court | Pending |
| 2698/2011 | City Civil Court | Pending |
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12602295 | AJAYKUMAR ABHAY JAIN | Omkar Realtors and Developers Private Limited | 18/04/2026 |
| CC12602296 | AJAYKUMAR ABHAY JAIN | Omkar Realtors and Developers Private Limited | 18/04/2026 |
| CC12602353 | Aniket Deepak Maru | Omkar Realtors and Developers Private Limited | 21/04/2026 |
| CC12602769 | Ashok Rameshchandra Mehta | Omkar Realtors and Developers Private Limited | 12/05/2026 |
| CC12602678 | Ashok Rameshchandra Mehta | Omkar Realtors and Developers Private Limited | 08/05/2026 |
| CC12602771 | Vrajlal Dharmshibhai Vora | Omkar Realtors and Developers Private Limited | 12/05/2026 |
| CC12603396 | Rajesh Thanmal Jain | Omkar Realtors and Developers Private Limited | 03/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 May 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed251
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 251 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 31-03-2024.pdf | 30 Apr 2026 |
| Form 2File: 31-03-2024.pdf | 30 Apr 2026 |
| Form 3File: Nikamwadi Form 3 March 2024 Signed.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2023-2024 Q4.pdf | 30 Apr 2026 |
| Form 1File: 30-06-2018_.pdf | 14 Apr 2026 |
| Form 2File: 30062018.pdf | 14 Apr 2026 |
| Form 3File: May 18 Nikamwadi Form 3 NS.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2018-2019 Q1.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2018-2019 Q2.pdf | 14 Apr 2026 |
| Form 1File: 30-09-2018.pdf | 14 Apr 2026 |
| Form 2File: 30092018.pdf | 14 Apr 2026 |
| Form 3File: Aug 18 Nikamwadi Form 3 NS.pdf | 14 Apr 2026 |
| Form 3File: Nov 18 Nikamwadi Form 3 NS.pdf | 14 Apr 2026 |
| Form 2File: 31122018.pdf | 14 Apr 2026 |
| Form 1File: 31-12-2018.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2018-2019 Q3.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2018-2019 Q4.pdf | 14 Apr 2026 |
| Form 1File: 31-03-2019.pdf | 14 Apr 2026 |
| Form 2File: 31032019.pdf | 14 Apr 2026 |
| Form 3File: Feb 19 Nikamwadi Form 3 NS.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form 3_Q1_Jun19.pdf | 14 Apr 2026 |
| Form 2File: 30062019.pdf | 14 Apr 2026 |
| Form 1File: 30-06-2019_.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2019-2020 Q1.pdf | 14 Apr 2026 |
| Form 1File: 30-09-2019.pdf | 14 Apr 2026 |
| Form 2File: 30092019.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form 3_Q2_Sep19.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2019-2020 Q2.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2019-2020 Q3.pdf | 14 Apr 2026 |
| Form 1File: 31-12-2019.pdf | 14 Apr 2026 |
| Form 2File: 31122019.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form 3_Q3_Dec19.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form 3_Q4_Mar20.pdf | 14 Apr 2026 |
| Form 2File: 31032020.pdf | 14 Apr 2026 |
| Form 1File: 31-03-2020.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2019-2020 Q4.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2020-2021 Q1.pdf | 14 Apr 2026 |
| Form 1File: 30-06-2020_.pdf | 14 Apr 2026 |
| Form 2File: 30062020.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form-3_Q1_Jun20.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form-3_Q2_Sept20.pdf | 14 Apr 2026 |
| Form 2File: 30092020.pdf | 14 Apr 2026 |
| Form 1File: 30-09-2020.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2020-2021 Q2.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2020-2021 Q3.pdf | 14 Apr 2026 |
| Form 1File: 31-12-2020.pdf | 14 Apr 2026 |
| Form 2File: 31122020.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form-3_Q3_Dec20.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form-3_Q4_Mar21.pdf | 14 Apr 2026 |
| Form 2File: 31032021.pdf | 14 Apr 2026 |
| Form 1File: 31-03-2021.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2020-2021 Q4.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2021-2022 Q1.pdf | 14 Apr 2026 |
| Form 1File: 30-06-2021_.pdf | 14 Apr 2026 |
| Form 2File: 30062021.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form 3_Q1_Jun 21.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form 3_Q2_Sep 21.pdf | 14 Apr 2026 |
| Form 2File: 30092021.pdf | 14 Apr 2026 |
| Form 1File: 30-09-2021.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2021-2022 Q2.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2021-2022 Q3.pdf | 14 Apr 2026 |
| Form 1File: 31-12-2021.pdf | 14 Apr 2026 |
| Form 2File: 31122021.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form 3_Q3_Dec 21.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form 3_Q4_Mar 22.pdf | 14 Apr 2026 |
| Form 2File: 31032022.pdf | 14 Apr 2026 |
| Form 1File: 31-03-2022.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2021-2022 Q4.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2022-2023 Q1.pdf | 14 Apr 2026 |
| Form 1File: 30-06-2022_.pdf | 14 Apr 2026 |
| Form 2File: 30062022.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form 3_Q1_Jun 22.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form 3_Q2_Sept 22.pdf | 14 Apr 2026 |
| Form 2File: 30092022.pdf | 14 Apr 2026 |
| Form 1File: 30-09-2022.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2022-2023 Q2.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2022-2023 Q3.pdf | 14 Apr 2026 |
| Form 1File: 31-12-2022.pdf | 14 Apr 2026 |
| Form 2File: 31122022.pdf | 14 Apr 2026 |
| Form 3File: Nikamwadi Form 3_Q3_Dec 22.pdf | 14 Apr 2026 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Omkar Veda | Parel | 250 | Completed | Dec 2013 | Late, Jul 2016 |
| Omkar Aloka | Mahim | 4 | Completed | Jun 2012 | Late, Jun 2012 |
| Omkar Woodside | Dadar West Mumbai 400028 | 21 | Completed | Mar 2012 | Late, Apr 2015 |
| Omkar Raga | Chembur | 144 | Completed | Sep 2010 | Late, Nov 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 251 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Om Gopal - Floor 3 to 9 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GNorth-400028780+ in Mumbai City
Filed coordinates, straight-line distance. 263 registered projects within 2 km.
Kohinoor Square Phase 1
Kohinoor CTNL Infrastructure Company Priva
Sigma Garnet
COLO COLOR PRIVATE LIMITED
PALETTE
SURAJ ESTATE DEVELOPERS LTD
Eon One
Firstlight Properties Private Limited
Ratan Address
Shri Nakoda Enterprises
Promesa West End
M/s. virtue Enterprises
See every Mumbai City project, with the district possession charts
Builder: Omkar Realtors and Developers Private Limited
Omkar Realtors and Developers Private Limited has 4 registrations on MahaRERA, including OMKAR 1973 WORLI and Om Gopal - Floor 3 to 9. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that Om Gopal - Floor 3 to 9 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Om Gopal - Floor 3 to 9 is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Om Gopal - Floor 3 to 9?
The registered promoter entity is Omkar Realtors and Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Om Gopal - Floor 3 to 9?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Om Gopal - Floor 3 to 9?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Om Gopal - Floor 3 to 9?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Om Gopal - Floor 3 to 9?
The professionals named in the filing: Architect: Anand Dhokay; Engineer: Mr. Harshad Gokhani; Engineer: PRASAD SHETTY; Chartered Accountant: SSMG & ASSOCIATES LLP; Chartered Accountant: CHETAN S TAK & COMPANY; Chartered Accountant: NILESH JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Om Gopal - Floor 3 to 9?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback