Om Ambe Smruti

By Oscar Infrastructure Private Limited

RG-MH-99952 · RERA P51800046923 · Last updated on MahaRERA portal: 22 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
10 of 11Construction stages donefurthest along: Installation of Lifts, 95%
44 of 71Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 190 documents Report an error

Om Ambe Smruti is a Others project by Oscar Infrastructure Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046923 on 20 Sep 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 27 of the 71 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameOm Ambe Smruti
  • TypeOthers
  • Location
    • Devidayal Road
    • Mulund West
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • RERA no.P51800046923
  • ReraGenie IDRG-MH-99952

Builder

  • NameOscar Infrastructure Private Limited
  • Entity typeCompany
  • CINU45400MH2008PTC182802
  • GSTIN27AABCO0475F2ZL
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsRahul Jagannath Joshi, Harmesh Rahul Joshi, Kamesh Rahul Joshi
  • Other registrations6 more →
  • Completed3 of 7
  • Declared earlier projects3 →

Key dates

this monthRegisteredSep 2022First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Sep 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed190 files

Current status

38%27 of 71 units booked
98.0%Work done, per cost certificate

Figures as on 22 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Om Ambe SmrutiNA211671071

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

Om Ambe Smruti: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed81

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots81
Closed/Covered81

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,668 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Apr 2026
LandownerVillageDistrict
Oscar Infrastructure Private LimitedKurlaMumbai Suburban
Rushabh CHS LimitedKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI4908.5
Proposed, not sanctioned1,516 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHari Om Plaza Opp Sampson English School R H Bhojraj Road Mulund West Mumbai 400080
Estimated costRs 24.20 cr
Cost incurredRs 23.72 cr
Work done98.0%
BuildingWingEstimatedIncurred
Om Ambe SmrutiNARs 23.10 crRs 22.64 cr
-NARs 1.10 crRs 1.08 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR P Asundaria
EngineerVishal Raghwani
Chartered AccountantKetan V LATHIA
Chartered AccountantHimmat Shethia
Chartered AccountantRambhia and Dedhia
PartnerRole in project
Oscar Infrastructure Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025950Dec 2024 → Dec 2025

Reason as filed by the promoterConditional C.C. Approval: Granted up to the 13th floor on 29/08/2023, with restrictions on the 14th and 15th floors due to pending handover of the setback area. These delays have impacted construction of floors 14th to 16th. We request an extension of the RERA validity until 31/12/2025 to complete the project.

EA09102518065Dec 2024 → Dec 2026

Reason as filed by the promoterWe, M/s Oscar Infrastructure Pvt. Ltd., promoter of the project “Om Ambe Smruti” (Reg. No. P51800046923), request an extension of the project registration beyond 31/12/2025 due to delays caused by the prolonged monsoon affecting external works such as plastering, waterproofing, painting, and related finishing activities. The RCC structure is completed as certified by the Architect. We seek an extension up to 31/12/2026 to complete the remaining work and ensure timely possession in full compliance with RERA provisions.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed190

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 190 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: OAS_Form_1_April 26 to june26.pdf22 Jul 2026
Withdrawal Update Form 2File: OAS_Form_2_April 26 to june26.pdf22 Jul 2026
Withdrawal Update Form 3File: OAS_Form_3_April 26 to june26.pdf22 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 April 25 to Mar 26 - Om Ambe Smruti signed.pdf12 May 2026
Withdrawal Update Form 1File: Form 1 - Architect Certificate.pdf21 Apr 2026
Withdrawal Update Form 2File: Rera Form 2 - Ambe Smruti - March 2026.pdf21 Apr 2026
Withdrawal Update Form 3File: Ambe Smruti - Form 3 Mar 26.pdf21 Apr 2026
Form 2A (FY 2025-2026)File: Rera Form 2A - Ambe Smruti - March 2026.pdf21 Apr 2026
Commencement certificateFile: Final CC.pdf12 Jan 2026
Withdrawal Update Form 1File: OAS Form 1 - Oct 25 to Dec 25.pdf12 Jan 2026
Withdrawal Update Form 2File: OAS Form 2 - Oct 25 to Dec 25.pdf12 Jan 2026
Withdrawal Update Form 3File: OAS Form 3 - Oct 25 to Dec 25.pdf12 Jan 2026
Withdrawal Update Form 1File: Form 1 - July to Sept 25.pdf7 Oct 2025
Withdrawal Update Form 2File: Form 2 - July 25 to Sept 25.pdf7 Oct 2025
Withdrawal Update Form 3File: Form 3 - July 25 to Sept 25.pdf7 Oct 2025
Form 1File: Form 1 oct 23 to dec 23.pdf4 Oct 2025
Form 2File: Form 2 I oct 23 to dec 23.pdf4 Oct 2025
Form 3File: Form 3 - Oct 23 to Dec 23.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: disclosure of sold unsold inventory.pdf4 Oct 2025
Form 1File: Form 1.pdf18 Sep 2025
Form 2File: Form 2.pdf18 Sep 2025
Form 3File: Form 3 Jan 25 to Mar 25.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold -Booked Inventory_OAS_Q4.pdf18 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf18 Sep 2025
Withdrawal Update Form 2File: Rera Form 2 - Ambe Smruti June 2025.pdf18 Sep 2025
Withdrawal Update Form 3File: Form 3 April 25 to june 25.pdf18 Sep 2025
Form 1File: 2 ) Form 1 Oct 22 to Dec 22.pdf18 Aug 2025
Form 2File: 2) Form 2 -Oct 22 to Dec 22.pdf18 Aug 2025
Form 3File: 2) Form 3 Oct 22 to Dec 22.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: disclosure of inventory Oct 22 to Dec 22.pdf18 Aug 2025
Form 1File: Form 1 Initials.pdf18 Aug 2025
Form 2File: Form 2 Initials.pdf18 Aug 2025
Form 3File: Form 3 Initials.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold_Booked Inventory_OAS_Q4.pdf18 Aug 2025
Form 1File: Form 1 Initial.pdf18 Aug 2025
Form 2File: Form 2 Initial.pdf18 Aug 2025
Form 3File: Form 3 Initial.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold_Booked Inventory_OAS_Q1.pdf18 Aug 2025
Form 1File: Form 1 Initial.pdf18 Aug 2025
Form 2File: Form 2 Initial.pdf18 Aug 2025
Form 3File: Form 3 Initial.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold_Booked Inventory_OAS_Q2.pdf18 Aug 2025
Form 1File: Form 1 Initial.pdf18 Aug 2025
Form 2File: Form 2 Initial.pdf18 Aug 2025
Form 3File: Form 3 Initial.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold_Booked Inventory_OAS_Q4.pdf18 Aug 2025
Form 1File: Form 1 Initials.pdf18 Aug 2025
Form 2File: Form 2 Initials.pdf18 Aug 2025
Form 3File: Form 3 Initials.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold -Booked Inventory_OAS_Q1.pdf18 Aug 2025
Form 1File: Form 1 Initials.pdf18 Aug 2025
Form 2File: Form 2 Initials.pdf18 Aug 2025
Form 3File: Form 3 Initials.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold -Booked Inventory_OAS_Q2.pdf18 Aug 2025
Form 1File: Form 1 Initials.pdf18 Aug 2025
Form 2File: Form 2 Initials.pdf18 Aug 2025
Form 3File: Form 3 Initials.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_Q3.pdf18 Aug 2025
Form 1File: 1) Form 1 initial.pdf18 Aug 2025
Form 2File: 1)Form 2 - initial.pdf18 Aug 2025
Form 3File: Form 3 - Initial.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory_Q2.pdf18 Aug 2025
Building plan approvalFile: Final Approved Drawing 13-3-2025-1.pdf25 Jul 2025
Building plan approvalFile: Final Approved Drawing 13-3-2025-2.pdf25 Jul 2025
Building plan approvalFile: Final Approved Drawing 13-3-2025-3.pdf25 Jul 2025
Building plan approvalFile: Final Approved Drawing 13-3-2025-4.pdf25 Jul 2025
Building plan approvalFile: Final Approved Drawing 13-3-2025-5.pdf25 Jul 2025
Building plan approvalFile: Final Approved Drawing 13-3-2025-6.pdf25 Jul 2025
Building plan approvalFile: Final Approved Drawing 13-3-2025-7.pdf25 Jul 2025
Building plan approvalFile: Final Approved Drawing 13-3-2025-8.pdf25 Jul 2025
Building plan approvalFile: Final Approved Drawing 13-3-2025-9.pdf25 Jul 2025
Building plan approvalFile: Final Approved Drawing 13-3-2025-10.pdf25 Jul 2025
Commencement certificateFile: FurtherCC.pdf25 Jul 2025
Declaration and undertaking (Annexure A)File: annexure A.pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11) Jan 25 to Mar 25 AS.pdf15 Apr 2025
Declaration in FORM BFile: Form B -500 notarized.pdf18 Mar 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf18 Mar 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seprate Bank Account.pdf18 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Rera Form 2A - Ambe Smruti - March 2023.pdf18 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 March 23.pdf18 Mar 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
OM Neelkanth DarshanP51800032659Ghatkopar East, Mumbai Suburban-Jan 2022CompletedJun 2025Registered original: Dec 2023Mar 2025
Om ResidencyThe Mulund Chandanbala CHSL CTS no. 1132A Plot No 1161 Survey Number 1000 Murar Road Mulund West Mumbai 4000801-CompletedJun 2023Mar 2023

How this compares with Mumbai Suburban

38%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Om Ambe Smruti on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

Builder: Oscar Infrastructure Private Limited

Oscar Infrastructure Private Limited has 7 registrations on MahaRERA, including OM RESIDENCY and OM REGENCY. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Om Ambe Smruti is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Om Ambe Smruti?

The registered promoter entity is Oscar Infrastructure Private Limited, a company as per the filing. Its CIN U45400MH2008PTC182802 and GSTIN 27AABCO0475F2ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Om Ambe Smruti?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Om Ambe Smruti?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Om Ambe Smruti?

The professionals named in the filing: Architect: R P Asundaria; Engineer: Vishal Raghwani; Chartered Accountant: Ketan V LATHIA; Chartered Accountant: Himmat Shethia; Chartered Accountant: Rambhia and Dedhia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Om Ambe Smruti?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Om Ambe Smruti. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Om Ambe Smruti to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.