Registration lapsed No litigation declared Residential / Group Housing project

OLYMPIA C D

By Nirmal Developers

RG-MH-23968 · RERA P51800012383 · Last updated on MahaRERA portal: 19 Oct 2018

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 63 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
63Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

OLYMPIA C D is a Residential / Group Housing project by Nirmal Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012383 on 1 Sep 2017. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 63 complaints are on record with the regulator.

At a glance

Project

  • NameOLYMPIA C D
  • TypeResidential / Group Housing
  • Location
    • Vaishali Nagar
    • Mulund West
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012383
  • ReraGenie IDRG-MH-23968

Builder

  • NameNirmal Developers
  • Entity typePartnership
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredSep 2017PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Olympia C DNA600000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Oct 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Olympia C D: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Oct 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed79

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots79
Closed/Covered79

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area988 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI32500.0
Proposed, not sanctioned1,801 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDevidayal road Mulund west

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManoj V Daisaria
EngineerAchyut Watve
PartnerRole in project
Nirmal Developers-

Litigation declared9

CaseCourtStatus
109010/1994City Civil Court at MumbaiPending
109272/1994City Civil Court at MumbaiPending
111/138/2012Small Cause Court at Dhobi Talao MumbaiPending
CC/280 /2016/2016State Consumer Disputes Redressal Commission MumbaiNext Hearing in the Month of August
CC/615/2016/2016State Consumer Disputes Redressal Commission MumbaiNext Hearing in the Month of August
CC/672 /2016/2016State Consumer Disputes Redressal Commission MumbaiNext Hearing in the Month of September
CC/819/2016/2016State Consumer Disputes Redressal Commission MumbaiNext Hearing in the Month of July
CC/1176 /2016/2016State Consumer Disputes Redressal Commission MumbaiNext Hearing in the Month of July
CC/5/17/2017State Consumer Disputes Redressal Commission MumbaiNext Hearing in the Month of July

Complaints filed with MahaRERA63

Case no.ComplainantRespondentFiled
CC006000000001434RAMCHANDRA L. BADGENIRMAL DEVELOPERS23/10/2017
CC006000000055965Karthik Ganesh JaganmohanNirmal Developers27/08/2018
CC006000000012584SHRI. HRISHIKESH DEVRAM MINDHE THROUGH HIS C. A. SHRI. DEVRAM SADASHIV MINDHENIRMAL DEVELOPERS27/12/2017
CC006000000023467ESAKKITHAI THEVAR AND ESAKKINATHAN THEVARNIRMAL DEVELOPERS22/02/2018
CC006000000023508Nirmal Developer Olympiya Aggrieved BuyerAssociationNirmal Developers26/02/2018
CC006000000044149DEEPALI J. MURJANINIRMAL DEVELOPERS18/04/2018
CC006000000141010Kailash Chandra BhattM/s. Nirmal Developers03/10/2019
CC006000000141109Mrs. Bhavika Sanjay GujariaM/s. Nirmal Developers03/10/2019
CC006000000141147Mr. Gautham AravindanM/s. Nirmal Developers03/10/2019
CC006000000044484PRERNA CHOWDHARYNIRMAL LIFESTYLE MULUND PVT LTD19/05/2018
CC006000000044485PRERNA CHOWDHARYNIRMAL LIFESTYLE MULUND PVT LTD19/05/2018
CC006000000054614PRAKASH VASANT KAJARINIRMAL DEVELOPERS23/05/2018
CC006000000054692B H PANDITNIRMAL DEVELOPERS30/05/2018
CC006000000055455Binu Nair and Mrs. Sumtha NairNirmal Developers21/07/2018
CC006000000196132Ms. Immaculate C. CorreiaM/s Nirmal Developers Partnership23/02/2021
CC006000000056471Mohan PednekarNirmal Developers10/10/2018
CC006000000056474Sachin KambliNirmal Developers10/10/2018
CC006000000057195Neha Govind SaoolNirmal Developers/ Dharmesh Jain06/12/2018
CC006000000057259Swati PatilNirmal Developers11/12/2018
CC006000000197860Swati Chandrakant PatilNirmal Developer02/08/2021
CC006000000057434Hemant MahajanNirmal Developers26/12/2018
CC006000000058022VINOD KUMAR PANDEYNIRMAL DEVELOPERS09/02/2019
CC006000000068157Kamal Suresh PatilNirmal developer23/02/2019
CC006000000078395Arvind AmbekarDharmesh Jain08/03/2019
CC006000000079183JAGANNATH PADAVENIRMAL DEVELOPERS06/05/2019
CC006000000079111Nayanaa VaidyaNirmal Developers06/07/2019
CC006000000192420NAYANAA VAIDYANIRMAL DEVELOPERS03/02/2020
CC006000000079280Kavita MalhotraNirmal Developers13/05/2019
CC006000000090028Mangala MandeNIRMAL DEVELOPERS08/07/2019
CC006000000192419Mangala MandeNirmal Developers03/02/2020
CC006000000161406Nirmal Developer Olympia Aggrieved Buyer AssociationNirmal Developers and Lucarative Properties Pvt Ltd05/11/2019
CC006000000182057POONAM ROHAN KAGENIRMAL DEVELOPERS03/01/2020
CC006000000192191Daniel Thomas ValayilNirmal Develpers15/01/2020
CC006000000192239MR.BHARAT PUNAMCHAND SHAH& MRS. NILA BHARAT SHAH & MR. HARSHIT BHARAT SHAHNIRMAL DEVELOPER20/01/2020
CC006000000192458Gauri ThatteNirmal Developers05/02/2020
CC006000000192886Nilesh MaruNirmal Developers05/03/2020
CC006000000192888P N KUTTY NAIR SHEKHARANNirmal Developers05/03/2020
CC006000000192780BINU NAIR & SUMITHA NAIRNIRMAL DEVELOPERS11/03/2020
CC006000000193078MATHEW K ALEX AND RUBY MATHEWNIRMAL DEVELOPERS, SHAPOORJI PALLONJI AND COMPANY PVT LTD19/03/2020
CC006000000193162Kamlesh Lachhman Tilwani and Lachhman Jiwatram TilwaniNirmal Developers18/09/2020
CC006000000193470Ashish Kumar SinghNirmal Developers08/08/2020
CC006000000196488Lucrative Properties Private LimitedP.N. Kutty Nair Shekharan25/03/2021
CC006000000196493Lucrative Properties Private LimitedNilesh Maru25/03/2021
CC006000000196495Lucrative Properties Private LimitedGauri Thatte25/03/2021
CC006000000196496Lucrative Properties Private LimitedMathew K Alex25/03/2021
CC006000000210361Shapoorji Pallonji Development Managers Private LimitedMohammad Feeroz Ahmad11/03/2022
CC006000000220772Lucrative Properties Private LimitedMohammad Feeroz Ahmed11/04/2022
CC006000000197306Mohammad Feeroz AhmadNirmal Developers18/06/2021
CC006000000197620RAJESH SHINDENIRMAL DEVEOPERS16/07/2021
CC006000000197789Narayan DhokreNirmal Developers28/07/2021
CC006000000198405Manasi DalviNirmal Developers22/09/2021
CC006000000197910C J Rana,C J Rana and D J RanaNirmal Developers06/08/2021
CC006000000198999Suryakant Dattaram BhogleM/s. Nirmal Developers12/11/2021
CC006000000209819SANTOSHKUMAR S HALAKATTINIRMAL DEVELOPERS25/01/2022
CC006000000210087Ms. Preeti GirishM/s. Nirmal Developers09/03/2022
CC006000000089932Mr. Mahesh S. SinghShapoorji Pallonji Development Managers Private Limited01/07/2019
CC006000000261940Kavissh M TantryNirmal Developers08/08/2022
CC006000000302897Arun NishadShapoorji Pallonji Real Estate08/10/2022
CC006000000396148Kavita Ramchandra GirkarNIRMAL DEVELOPERS09/06/2023
CC006000000479923SANDEEP DHANVANTRI SHAHNIRMAL DEVELOPERS06/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 5)File: ND Form V Olympia C D.pdf19 Oct 2018
OtherFile: Olympia Revised DMA 1.pdf7 Sep 2018
OtherFile: Olympia Revised DMA 2.pdf7 Sep 2018
OtherFile: Olympia Revised DMA 3.pdf7 Sep 2018
OtherFile: Olympia Revised DMA 4.pdf7 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: CC Revalidation - Till Jan 2019.pdf4 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificates.pdf11 May 2018
Layout approvalFile: Proposed Layout_Olympia CS_New_24042018.pdf24 Apr 2018
Copy of Layout Approval (in case of layout)File: Proposed Layout_Olympia CS_New_24042018.pdf24 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: olympia CC.pdf29 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: olympia- revalidation receipt.pdf29 Mar 2018
OtherFile: 1.pdf26 Mar 2018
OtherFile: 2.pdf26 Mar 2018
OtherFile: 3.pdf26 Mar 2018
Layout approvalFile: KALPNAGRI C D WING PROPOSED.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: KALPNAGRI C D WING PROPOSED.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Olympia Wing C D Wing Updated Architect Certificate 30_07_17.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Olympia CD.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA certificate Olympia C D new.pdf30 Jul 2017
Proforma of Allotment letterFile: Olympia C D.pdf30 Jul 2017
Layout approvalFile: OLYMPIA2-APPROVED LAYLOUT.pdf29 Jul 2017
Building plan approvalFile: IOD- KALPNAGRI.pdf29 Jul 2017
Copy of the legal title reportFile: Olympia TC.pdf29 Jul 2017
Details of encumbrancesFile: Index_Altico_200 crores_Nirmal Developers.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: OLYMPIA2-APPROVED LAYLOUT.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD- KALPNAGRI.pdf29 Jul 2017
Declaration in FORM BFile: olympia c and D affidavit form B.pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OLYMPIA C D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

2 kmOLYMPIA C DCompleted 125Lapsed / revoked 96Other 153Dot size: filed unitsN

Filed coordinates, straight-line distance. 374 registered projects within 2 km.

Builder: Nirmal Developers

Nirmal Developers has 4 registrations on MahaRERA, including OLYMPIA C D and NIRMAL NIWARA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that OLYMPIA C D shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if OLYMPIA C D is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OLYMPIA C D?

The registered promoter entity is Nirmal Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OLYMPIA C D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against OLYMPIA C D?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for OLYMPIA C D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OLYMPIA C D?

The professionals named in the filing: Architect: Manoj V Daisaria; Engineer: Achyut Watve. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OLYMPIA C D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OLYMPIA C D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OLYMPIA C D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.