Completed No litigation declared Plotted project

Olympeo Retreat - Phase 1

By PARADISO REALTY SOLUTIONS LLP

RG-MH-07243 · RERA P52000055126 · Last updated on MahaRERA portal: 16 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
31 of 31Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Olympeo Retreat - Phase 1 is a Plotted project by PARADISO REALTY SOLUTIONS LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000055126 on 4 Mar 2024. The registration is recorded completed; possession was promised by 30 Jun 2025. 0 of the 31 units on this registration are recorded sold or booked.

At a glance

Project

  • NameOlympeo Retreat - Phase 1
  • TypePlotted
  • Location
    • Off Karjat-Murbad Road
    • Village - Borivali & Sugve
    • Near Kashele
    • Boriwali
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000055126
  • ReraGenie IDRG-MH-07243

Builder

  • NamePARADISO REALTY SOLUTIONS LLP
  • Entity typePartnership
  • PartnersPRABHAT RANJAN, INDERJEET SINGH PABLA, SAURAV KUMAR TUNTUN
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2024PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Mar 2024
  • Promised completion30 Jun 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed81 files

Current status

0%0 of 31 units booked
47.7%Work done, per cost certificate

Figures as on 16 Feb 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 16 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes60%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes5%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area15,054 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2025

Approvals and building plan

Sanctioning authorityTown Planning Raigad
Permissible FSI5328.0

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSector 15, Koperkhairne, Navi Mumbai 400709, Maharashtra
Estimated costRs 4.00 cr
Cost incurredRs 1.91 cr
Work done47.71%
BuildingWingEstimatedIncurred
-NARs 4.00 crRs 1.91 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIVEK KUMAR
EngineerPRABHAT RANJAN
Chartered AccountantCHANDAK AGRAWAL & CO
PartnerRole in project
PARADISO REALTY SOLUTIONS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Feb 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: Clarification Letter.pdf16 Feb 2026
Withdrawal Update Form 1File: FORM 1 JUNE 2025.pdf6 Dec 2025
Withdrawal Update Form 2File: FORM 2 JUNE 2025.pdf6 Dec 2025
Withdrawal Update Form 3File: FORM 3 JUNE 2025_.pdf6 Dec 2025
Completion CertificateFile: Retreat Form -4 Phase-1.pdf6 Dec 2025
Completion CertificateFile: Plan09042014 - converted.pdf6 Dec 2025
Completion CertificateFile: Plan-17062014 - converted.pdf6 Dec 2025
Completion CertificateFile: Plan-22042024 - converted.pdf6 Dec 2025
Form 1File: FORM 1 SEPT 2024.pdf24 Jul 2025
Form 2File: FORM 2 SEPT 2024.pdf24 Jul 2025
Form 3File: FORM 3 SEPT 2024.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 2024.pdf24 Jul 2025
Form 1File: FORM 1 MARCH 2024.pdf24 Jul 2025
Form 2File: FORM 2 MARCH 2024.pdf24 Jul 2025
Form 3File: FORM 3 MARCH 2024.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH 2024.pdf24 Jul 2025
OthersFile: FORM 5 2023 - 2024.pdf24 Jul 2025
Form 1File: FORM 1 MARCH 2025.pdf24 Jul 2025
Form 2File: FORM 2 MARCH 2025.pdf24 Jul 2025
Form 3File: FORM 3 MARCH 2025 1.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH 2025.pdf24 Jul 2025
Form 1File: FORM 1 JUNE 2024.pdf23 Jul 2025
Form 2File: FORM 2 JUNE 2024.pdf23 Jul 2025
Form 3File: FORM 3 JUNE 2024.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold OR Phase 1 June 2024.pdf23 Jul 2025
Form 1File: FORM 1 DEC 2024.pdf23 Jul 2025
Form 2File: FORM 2 DEC 2024.pdf23 Jul 2025
Form 3File: FORM 3 DEC 2024 1.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold OR Phase 1 Dec 2024.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Retreat dec 24 Signed.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Retreat Phase 1 March 24 Form 2.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Retreat Phase 1 June 24 Form 2.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Retreat Phase 1 March 25 Form 2.pdf7 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Phase I Form 5 2023-24 Signed (1).pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Phase-I_compressed.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf26 Mar 2025
Disclosure of sold/ booked inventoryFile: Retriet Phase I.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA Signed Copy.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 Dec 2024
Other - LegalFile: NOTE.pdf29 Feb 2024
Other - LegalFile: Borivali Deed.pdf21 Feb 2024
Other - LegalFile: Sugve Deed_Compressed.pdf21 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Validated.pdf5 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Tax Receipt.pdf5 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf5 Feb 2024
Copy of the legal title reportFile: Title Certificate_Compressed.pdf30 Jan 2024
CERSAI detailsFile: CERSAI.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (2)_compressed.pdf30 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in other Real Estate.pdf30 Jan 2024
Proforma of Allotment letterFile: Allotment Letter.pdf30 Jan 2024
Proforma of Agreement for saleFile: Model Agreement - Plot.pdf30 Jan 2024
Deviation Report with respect to Allotment letterFile: Allotment letter_Deviation.pdf30 Jan 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation in AFS.pdf30 Jan 2024
Layout approvalFile: Master Plan_Phase 1.pdf27 Dec 2023
Copy of Layout Approval (in case of layout)File: Master Plan_Phase 1.pdf27 Dec 2023
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Encumbrances.pdf18 Dec 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate_Compressed.pdf18 Dec 2023
Details of encumbrances concerned to LegalFile: Self Declaration Regarding Encumbrances.pdf18 Dec 2023
Details of encumbrances concerned to LegalFile: Encumbrance Certificate_Compressed.pdf18 Dec 2023
Declaration about Commencement CertificateFile: Format D.pdf18 Dec 2023
Declaration in FORM BFile: Form B - Affidavit cum Declaration.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revised Architect Certificate.pdf18 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Revised.pdf18 Dec 2023
Layout approvalFile: Master Plan - Riva.pdf7 Dec 2023
Building plan approval or NA orderFile: NA Order_organized-1-2.pdf7 Dec 2023
Building plan approval or NA orderFile: NA Order_organized-3-4.pdf7 Dec 2023
Building plan approval or NA orderFile: NA Order_organized-5-6.pdf7 Dec 2023
Building plan approval or NA orderFile: NA Order_organized-7-8.pdf7 Dec 2023
Building plan approval or NA orderFile: NA Order_organized-9-10.pdf7 Dec 2023
Building plan approval or NA orderFile: NA Order_organized-11-12.pdf7 Dec 2023
Building plan approval or NA orderFile: NA Order_organized-13.pdf7 Dec 2023
PAN CardFile: Paradiso Realty Solutions LLP Pan Card.pdf7 Dec 2023
Copy of Layout Approval (in case of layout)File: Master Plan - Riva.pdf7 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order_organized-1-2.pdf7 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order_organized-3-4.pdf7 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order_organized-5-6.pdf7 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order_organized-7-8.pdf7 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order_organized-9-10.pdf7 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order_organized-11-12.pdf7 Dec 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Olympeo Riverside Phase 2Avsare Karjat Raigad 41010120CompletedJun 2019Late, Oct 2023
Olympeo Riverside Phase 1Avsare Karjat Raigad 410101280CompletedJun 2018Jun 2018

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Olympeo Retreat - Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village - Borivali & Sugve, Near Kashele5,900+ in Raigarh

2 kmOlympeo Retreat - Phase Completed 2Lapsed / revoked 2Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: PARADISO REALTY SOLUTIONS LLP

PARADISO REALTY SOLUTIONS LLP has 2 registrations on MahaRERA, including Olympeo Retreat - Phase 1 and Olympeo Retreat - Phase 2. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Olympeo Retreat - Phase 1 is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Olympeo Retreat - Phase 1?

The registered promoter entity is PARADISO REALTY SOLUTIONS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Olympeo Retreat - Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Olympeo Retreat - Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Olympeo Retreat - Phase 1?

The professionals named in the filing: Architect: VIVEK KUMAR; Engineer: PRABHAT RANJAN; Chartered Accountant: CHANDAK AGRAWAL & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Olympeo Retreat - Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Olympeo Retreat - Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Olympeo Retreat - Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.