ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Olina

Registration lapsed No litigation declared Residential / Group Housing project

Olina

By S S PROJECTS

RG-MH-71559 · RERA P52100049956 · Last updated on MahaRERA portal: 22 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
9 of 11Construction stages donefurthest along: Installation of Lifts, 70%
23 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Olina is a Residential / Group Housing project by S S PROJECTS in Pune, Maharashtra, registered with MahaRERA as P52100049956 on 6 Mar 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 17 of the 40 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameOlina
  • TypeResidential / Group Housing
  • Location
    • Sinhgad Road
    • Hingne Kd
    • Vitthalvadi
    • Haveli
    • Pune
    • 411051
  • Pincode411051
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049956
  • ReraGenie IDRG-MH-71559

Builder

  • NameS S PROJECTS
  • Entity typePartnership
  • PartnersSachin Shankar Benkar, Seema Ramdas Raykar

Key dates

4 months past promisethis monthRegisteredMar 2023First promiseDec 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Mar 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed84 files

Current status

42%17 of 40 units booked
79.9%Work done, per cost certificate

Figures as on 22 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OlinaNA10832840

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 70%.

Olina: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed127

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots127
Open Space127

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,742 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jun 2025
LandownerVillageDistrict
Smt Nalini Madhukar GosaviVitthalvadiPune

Approvals and building plan

Permissible FSI3061.92
Proposed, not sanctioned3,062 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNo 028 1A Mamasaheb Deshpande Path Sinhgad Rd behind Santosh Bakery Anand Nagar Pune Maharashtra 411
Estimated costRs 12.43 cr
Cost incurredRs 9.93 cr
Work done79.86%
BuildingWingEstimatedIncurred
OlinaNARs 10.00 crRs 9.20 cr
-NARs 2.43 crRs 72.84 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShankar D Gejage
EngineerMr. Pravin Ramesh Kakade
Chartered AccountantMrudula S Joshi
Chartered AccountantJoshi & Raykar
Chartered AccountantManish Shah
PartnerRole in project
S S PROJECTS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA22122518900Dec 2025 → Jun 2026

Reason as filed by the promoterThe promoter has completed 90% of the project. Extension is required to complete remaining 10% of the work & obtaining various types of NOC’s from various authorities to get the Occupancy Certificate from the PMC Pune.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf22 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf22 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf22 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf7 May 2026
Withdrawal Update Form 2File: Form 2.pdf7 May 2026
Withdrawal Update Form 3File: Form 3.pdf7 May 2026
Withdrawal Update Form 1File: Form 1.pdf4 May 2026
Withdrawal Update Form 2File: Form 2.pdf4 May 2026
Withdrawal Update Form 3File: Form 3.pdf4 May 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf4 May 2026
Withdrawal Update Form 1File: Form 1.pdf26 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf12 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf12 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf12 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf24 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf24 Jan 2026
Form 5 (FY 2024-2025)File: Form 5.pdf11 Dec 2025
Form 5 (FY 2022-2023)File: Form 5.pdf25 Nov 2025
Form 5 (FY 2023-2024)File: FORM 5.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf17 Oct 2025
Form 1File: Form 1.pdf17 Oct 2025
Form 2File: Form 2.pdf17 Oct 2025
Form 3File: Form 3.pdf17 Oct 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: FORM 2.pdf19 Jul 2025
Form 3File: FORM 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory.pdf19 Jul 2025
Form 1File: Form 1.pdf30 Jun 2025
Form 2File: Form 2.pdf30 Jun 2025
Form 3File: Form 3.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf30 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf30 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf15 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf16 Sep 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf27 Feb 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf27 Feb 2023
Declaration in FORM BFile: Form B- Declaration of Promoter.pdf27 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumbrances.pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrances.pdf16 Feb 2023
Declaration about Commencement CertificateFile: Format D-Declaration about Commencement Certificate.pdf16 Feb 2023
CERSAI detailsFile: CERSAI.pdf16 Feb 2023
Proforma of Agreement for saleFile: Agreement to sale.pdf16 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Details.pdf16 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation from model form of Agreement to Sale.pdf16 Feb 2023
CERSAI detailsFile: CERSAI Report.pdf10 Feb 2023
Deviation Report with respect to Allotment letterFile: no Deviation from model form of Allotment Letter.pdf10 Feb 2023
Other - LegalFile: 7 12 extract.pdf10 Feb 2023
Other - LegalFile: Property Card -2225 to 2239.pdf10 Feb 2023
Other - LegalFile: Property Card -2240 to 2253.pdf10 Feb 2023
Layout approvalFile: Layout plan.pdf9 Feb 2023
Building plan approvalFile: Building plan 1st to 7th floor.pdf9 Feb 2023
Building plan approvalFile: Building plan 8th and terrace floor plan.pdf9 Feb 2023
PAN CardFile: PAN Card- Firm.pdf9 Feb 2023
Copy of the legal title reportFile: Signed Title Report.pdf9 Feb 2023
Details of encumbrances concerned to FinanceFile: Signed Title Report.pdf9 Feb 2023
Details of encumbrances concerned to LegalFile: Signed Title Report.pdf9 Feb 2023
Copy of Layout Approval (in case of layout)File: Layout plan.pdf9 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Building plan 1st to 7th floor.pdf9 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Building plan 8th and terrace floor plan.pdf9 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certi.pdf9 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Feb 2023

How this compares with Pune

42%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Olina on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hingne Kd13,700+ in Pune

2 kmOlinaCompleted 36Lapsed / revoked 20Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 96 registered projects within 2 km.

Builder: S S PROJECTS

S S PROJECTS has 1 registration on MahaRERA, including Olina. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Olina shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Olina is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Olina?

The registered promoter entity is S S PROJECTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Olina?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Olina?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Olina?

The professionals named in the filing: Architect: Shankar D Gejage; Engineer: Mr. Pravin Ramesh Kakade; Chartered Accountant: Mrudula S Joshi; Chartered Accountant: Joshi & Raykar; Chartered Accountant: Manish Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Olina?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Olina. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Olina to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.