Home / Browse projects / Mumbai City, Maharashtra / OCEAN STAR I

Registered No litigation declared Residential / Group Housing project

OCEAN STAR I

By SURAJ ESTATE DEVELOPERS LTD

RG-MH-27117 · RERA P51900007257 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 45 months
  • 2 extensions taken
  • Rs 92.00 crore secured on the land, in favour of Aditya Birla Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 45 months from the original
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
34 of 67Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

OCEAN STAR I is a Residential / Group Housing project by SURAJ ESTATE DEVELOPERS LTD in Mumbai City, Maharashtra, registered with MahaRERA as P51900007257 on 17 Aug 2017. Possession is promised by 31 Mar 2027. The completion date has moved by 45 months from the original filing. 33 of the 67 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameOCEAN STAR I
  • TypeResidential / Group Housing
  • Location
    • 12.20 M KASHINATH ROAD
    • Prabhadevi
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900007257
  • ReraGenie IDRG-MH-27117

Builder

  • NameSURAJ ESTATE DEVELOPERS LTD
  • Entity typeCompany
  • CINU99999MH1986PTC040873
  • GSTIN27AAACS8375H1Z0
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorTHOMAS RAJAN
  • Other registrations14 more →
  • Completed4 of 15
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017First promiseJun 2023Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Aug 2017
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed122 files

Current status

49%33 of 67 units booked

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OCEAN STAR INA503467067

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

OCEAN STAR I: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises23%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes10%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes35%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed150

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots150
Closed/Covered140
Open Space10

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,192 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Limited
Secured amountRs 92.00 crore
CERSAI search filedYes
Declared on11 Jun 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4755.9
Proposed, not sanctioned3,656 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWORLI MUMBAI

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchvision Architects
ArchitectPriyanka Rahate
EngineerRohan Thanedar
EngineerMadhura Manjrekar
EngineerSuraj Estate Developers
EngineerAbhay Aamberkar
Chartered AccountantVSC ASSOCIATES
Chartered AccountantSLR & CO LLP
Chartered AccountantNaveen Tripathi
PartnerRole in project
SURAJ ESTATE DEVELOPERS LTD-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900016977Jun 2023 → Jun 2026

Reason as filed by the promoterWe have amalgamated the said plot with the adjoining plot F.P. 1200 with the total plot area of the combined plot 2024.59 sq.mtr. To get the benefit of additional FSI due to increase plot area, we have amended the plans and obtained the Municipal Commissioner’s Concessional Report approved dated 13/02/2023 for part basement + ground floor + 7th podium + 8th floor as service floor + 9th to 43rd floor. The additional FSI is generated by way of amalgamating plot No. F.P. 1200 under Clubbing Scheme as per 33(7) of DCPR 2034. We have uploaded the consent of 51% of the sold flat purchasers. Due to d

EA25062621530Jun 2023 → Mar 2027

Reason as filed by the promoterRef.: Reasons for extension of date of possession of Building known as Ocean Star - 1 bearing MahaRERA Registration No.P51900007257. The last amended plans for the proposed building consisting of part basement + ground floor + 6 podium + 7th Amenity Floor + 8th floor as Service Floor + 9th to 42nd Floor was approved by BMC and IOD for the same was issued on 23rd January, 2024. The said approval was granted considering the FSI potential of Final Plot No.1200, F.P. No.1198 & F.P. 1199. We had entered into Development Agreement with the owners of F.P.No.1200, as per which we were required to cons

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jan 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: 2023.pdf14 Jul 2026
Form 2A (FY 2024-2025)File: 2024.pdf14 Jul 2026
Form 2A (FY 2022-2023)File: 2022.pdf14 Jul 2026
Withdrawal Update Form 1File: Form1 Ocean Star-Dec-2025.pdf25 Jun 2026
Withdrawal Update Form 1File: Form1 Ocean Star MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE - Ocean Star - Dec 2025.pdf25 Jun 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE - Ocean Star - March 2026.pdf25 Jun 2026
Withdrawal Update Form 3File: Final Form III Ocean Star Project Dec 2025.pdf25 Jun 2026
Withdrawal Update Form 3File: Ocean Star Form 3 March -2026 Signed.pdf25 Jun 2026
Form 2A (FY 2025-2026)File: FORM -2A.pdf25 Jun 2026
Form 5 (FY 2024-2025)File: Certificate - Form 5 Ocean Star Form 5 - 2024-25 sg.pdf25 Jun 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 3006.pdf24 Jun 2026
Withdrawal Update Form 1File: Ocean Star- Form1 Sept 2025.pdf24 Jun 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE June 2025.pdf24 Jun 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE - Ocean Star - Sept 2025.pdf24 Jun 2026
Withdrawal Update Form 3File: CA Certificate.pdf24 Jun 2026
Withdrawal Update Form 3File: Signed RERA Form 3_Ocean Star -Sept-2025.pdf24 Jun 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1198_99_AR.pdf21 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OCEAN STAR.pdf15 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Doc0125.pdf11 Apr 2025
Certificates of CA (Form 3)File: December 2024.pdf9 Apr 2025
Details of encumbrancesFile: ABFL - Ocean Star I Encumbrance Certificate.pdf25 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FP 1198-99 Ocean.pdf27 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1198-99_ARCHITECT CERTIFIACATE.pdf2 May 2024
Commencement Certificates / NA Order for plotted developmentFile: FCC 40 Floors - 20022024 (1).pdf1 Mar 2024
Building plan approvalFile: FCC 40 Floors - 20022024.pdf20 Feb 2024
Building plan approvalFile: Approval Letter.pdf20 Feb 2024
Building plan approvalFile: FCC 40 Floors - 20022024.pdf20 Feb 2024
Building plan approvalFile: Drawing - 2_11zon.pdf20 Feb 2024
Building Plan Approval (IOD)File: FCC 40 Floors - 20022024.pdf20 Feb 2024
Building Plan Approval (IOD)File: Approval Letter.pdf20 Feb 2024
Building Plan Approval (IOD)File: FCC 40 Floors - 20022024.pdf20 Feb 2024
Building Plan Approval (IOD)File: Drawing - 2_11zon.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ocean star-1 form-2.pdf4 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SURAJ VITALIS.pdf1 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: OCEAN STAR 1.pdf1 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ocean Star I.pdf26 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGN CER.pdf26 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - FP 1199.pdf11 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2.pdf6 Jul 2023
Layout approvalFile: 4C Report.pdf1 Jul 2023
Building plan approvalFile: Amended Scrutiny Report_compressed.pdf1 Jul 2023
Building plan approvalFile: Che Eng DP Notesheet.pdf1 Jul 2023
Layout approvalFile: MC Notesheet.pdf1 Jul 2023
Layout approvalFile: Letter to Ch Eng for 33 22.pdf1 Jul 2023
Copy of Layout Approval (in case of layout)File: 4C Report.pdf1 Jul 2023
Copy of Layout Approval (in case of layout)File: MC Notesheet.pdf1 Jul 2023
Copy of Layout Approval (in case of layout)File: Letter to Ch Eng for 33 22.pdf1 Jul 2023
Building Plan Approval (IOD)File: Amended Scrutiny Report_compressed.pdf1 Jul 2023
Building Plan Approval (IOD)File: Che Eng DP Notesheet.pdf1 Jul 2023
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf1 Jul 2023
Declaration in FORM BFile: Affidavit Cum Declaration.pdf1 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SIGNED.pdf1 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate.pdf1 Jul 2023
Disclosure of sold/ booked inventoryFile: Desclosure Of Sold Booked Inventory.pdf1 Jul 2023
Certificates of CA (Form 3)File: CA Certificate.pdf1 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018 2019.pdf29 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092022.pdf27 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FP 1198-99 Ocean star.pdf6 Feb 2023
Certificates of CA (Form 3)File: CA Final_form 3 Ocean Star Dec 2022_compressed.pdf30 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 - FP 1199 - Mar 22_compressed.pdf21 Jan 2023
Certificates of CA (Form 3)File: Ocean Star Sep.pdf1 Nov 2022
Details of encumbrancesFile: Encumbrances Certificate.pdf13 Sep 2022
Certificates of CA (Form 3)File: Form 3 ocean star June.pdf27 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ocean star correction file (1)_compressed_compressed.pdf15 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf15 Jul 2022
Building plan approvalFile: Sheet 1.pdf2 Jul 2022
Building plan approvalFile: Sheet 2.pdf2 Jul 2022
Building plan approvalFile: Sheet 4.pdf2 Jul 2022
Building plan approvalFile: Sheet 5.pdf2 Jul 2022
Building plan approvalFile: Sheet 6.pdf2 Jul 2022
Building Plan Approval (IOD)File: Sheet 1.pdf2 Jul 2022
Building Plan Approval (IOD)File: Sheet 2.pdf2 Jul 2022
Building Plan Approval (IOD)File: Sheet 4.pdf2 Jul 2022
Building Plan Approval (IOD)File: Sheet 5.pdf2 Jul 2022
Building Plan Approval (IOD)File: Sheet 6.pdf2 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1198-99.pdf2 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ocean Star Engineer's Certificate Form 2 March 2022.pdf1 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1198_compressed.pdf13 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: FCC - 11-06-2021.pdf15 Jun 2021

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PALETTEP51900008207DADAR-WEST, Mumbai City152Aug 2017OngoingDec 2025Registered original: Jun 2023Not delivered
HALLMARKCS 104 BHIMWADI WADALA EAST MUMBAI7-CompletedJul 2016Late, Nov 2016
ETERNITY APARTMENTFP 469 MMC CROSS ROAD MAHIM WEST MUMBAI 40001616-CompletedAug 2011Aug 2011
PARK SIDEFP 888 DATTA RAUL ROAD DADAR WEST MUMBAI 40002828-CompletedJul 2010Late, Feb 2011

How this compares with Mumbai City

49%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 45 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OCEAN STAR I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Prabhadevi780+ in Mumbai City

2 kmOCEAN STAR ICompleted 31Lapsed / revoked 35Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 114 registered projects within 2 km.

Builder: SURAJ ESTATE DEVELOPERS LTD

SURAJ ESTATE DEVELOPERS LTD has 15 registrations on MahaRERA, including ST ANTHONY APARTMENT and TRANQUIL BAY. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if OCEAN STAR I is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OCEAN STAR I?

The registered promoter entity is SURAJ ESTATE DEVELOPERS LTD, a company as per the filing. Its CIN U99999MH1986PTC040873 and GSTIN 27AAACS8375H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OCEAN STAR I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OCEAN STAR I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OCEAN STAR I?

The professionals named in the filing: Architect: Archvision Architects; Architect: Priyanka Rahate; Engineer: Rohan Thanedar; Engineer: Madhura Manjrekar; Engineer: Suraj Estate Developers; Engineer: Abhay Aamberkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OCEAN STAR I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OCEAN STAR I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OCEAN STAR I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.