Home / Browse projects / Mumbai Suburban, Maharashtra / Oasis - Tower 1

Completed No litigation declared Residential / Group Housing project

Oasis - Tower 1

By Glomore constructions

RG-MH-11281 · RERA P51800006404 · Last updated on MahaRERA portal: 8 Feb 2023

Source: official MahaRERA filing

Red flags

  • 31 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 98%
31Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Oasis - Tower 1 is a Residential / Group Housing project by Glomore constructions in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006404 on 14 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing. 31 complaints are on record with the regulator.

At a glance

Project

  • NameOasis - Tower 1
  • TypeResidential / Group Housing
  • Location
    • Akurli Road
    • Kandivali East
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006404
  • ReraGenie IDRG-MH-11281

Builder

  • NameGlomore constructions
  • Entity typePartnership
  • PartnerParas Kirit Mehta
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Oasis - Tower 1NA380000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.

Oasis - Tower 1: 93% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities20

As on 8 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes70%
Energy managemcntYes80%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes90%
2 level podiumsYes100%
AmenitiesYes40%
External PodiumYes80%
Right of WayYes100%
StiltYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area636 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19436.82
Proposed, not sanctioned16,774 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGanga jamuna apts, gr floor, opp shoppers stop, S V Road, Andheri W, Mumbai 400058

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSP Associates
ArchitectVivek bhole
EngineerSACPL, Mr Nikhil sanghvi
PartnerRole in project
Glomore constructions-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800003847Dec 2019 → Dec 2020

Reason as filed by the promoter• 53 Months Delay - NOC from Commissioner of Labour and related delays. • 47 Months Delay - MOEF Clearance. • 17 Months Delay - TDR Utilization Approval • 26 Months Delay - Dumping Ground Construction Stay Order and SWM Notification • 6 Months Delay - New Labour Law Compliance by all Contractors. • 4 Months Delay - Demonetization exercised by Central Government • 3 Months Delay - Compliance of new RERA Act • 3 Months Delay - Compliance of new GST Policies • 48 Months Delay Till Date - Amendments in Development Control Regulations • 4 Months Delay - Nallah Remarks Approval Related Delays. • 24

Complaints filed with MahaRERA31

Case no.ComplainantRespondentFiled
CC006000000197815Vinod Kumar Mullavarath SreenaryanaAcme Housing India Private Limited29/07/2021
CC006000000056785Jishnu AsharGlomore Constructions31/10/2018
CC006000000089809Rahul AgarwalM/s Glomore Constructions28/06/2019
CC006000000100552Nilesh Sitram SawantMr. Paresh K. Mehta M/s Glomore Construction & Mr. Bhupendra M. Doshi of Acme Housing India Pvt. Ltd17/08/2019
CC006000000194290Anindya Purnendu Mitra and Pooja Mitraa) M/s Glomore Constructions and b)Acme Housing India Pvt Ltd.04/10/2020
CC006000000193435Sandeep Sahebrao ValaseGlomore Constructions14/07/2020
CC006000000199141Anthony NoronhaGlomore Constructions11/12/2021
CC006000000194207Vivek Bholanath ChaturvediGlomore Construction30/09/2020
CC006000000195142BRIHASPATI SINGHM/s. Glomore Construction09/12/2020
CC006000000195183URMI GHOSHM/S. GLOMORE CONSTRUCTIONS08/12/2020
CC006000000195186EAMIL MAKWANAM/S. GLOMORE CONSTRUCTIONS09/12/2020
CC006000000195187SINGH TARA SHIVDHARIM/S. GLOMORE CONSTRUCTIONS08/12/2020
CC006000000195492Vibhor ModiM/s. Glomore Construction02/01/2021
CC006000000195504VANISH BHANSALI AND ARTI BHANSALIM/s. Glomore Construction03/01/2021
CC006000000195637Milind Kandalkar and Vrunda KandalkarM/s. Glomore Construction14/01/2021
CC006000000195705Manish Balkrishna LokhandeM/s. Glomore Constructions21/01/2021
CC006000000195794SAURABH DESAIGLOMORE CONSTRUCTIONS(GC)08/02/2021
CC006000000196543Jimit DoshiGlomore Constructions27/05/2021
CC006000000196546Jimit DoshiGlomore Constructions27/05/2021
CC006000000198128ASHA P KANNANM/s Glomore Constructions11/09/2021
CC006000000198709AKANKSHA DHAVAL PATEL AND DHAVAL PRAVINCHANDRA PATELGLOMORE CONSTRUCTION21/10/2021
CC006000000209508Sonali Ratnakar PatkeM/s Glomore Constructions28/12/2021
CC006000000209496Anil SinghM/s. Glomore Constructions22/12/2021
CC006000000209500Ajit SinghM/s. Glomore Construction22/12/2021
CC006000000210570Vivek Bholanath ChaturvediM/s. Glomore Constructions28/03/2022
CC006000000303145SUSHIL DAMODAR VICHAREM/S GLOMORE CNSTRUCTIONS01/11/2022
CC006000000303144SWAPNIL DAMODAR VICHAREM/S GLOMORE CONSTRUCTIONS01/11/2022
CC006000000540767Yogesh Rajaram JedheGlomore Constructions18/07/2024
CC12500450sanjay soparkarGlomore constructions11/02/2025
CC12501727Ajay DattaGlomore constructions27/05/2025
CC12504398Rakesh Bhimsen KondvilkarGlomore constructions10/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Feb 2023

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: O C Date 27-03-2021 (2).pdf8 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: C C 36th Floor Date 10-08-2020 Valid up to Date 25-02-2021.pdf4 Feb 2023
Proforma of Agreement for saleFile: OASIS AFS.pdf4 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A-(April-June).pdf27 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A-(July-Sept).pdf27 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A-(Oct-Dec).pdf27 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A-(Jan-March).pdf27 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GC.pdf11 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GLOMORE FORM 5 DELAY LETTER.pdf29 Sep 2022
Layout approvalFile: 743004020_Drawing-2-6-1-2_compressed.pdf8 Jun 2022
Layout approvalFile: 743004020_Drawing-2-6-3-5_compressed.pdf8 Jun 2022
Copy of Layout Approval (in case of layout)File: 743004020_Drawing-2-6-1-2_compressed.pdf8 Jun 2022
Copy of Layout Approval (in case of layout)File: 743004020_Drawing-2-6-3-5_compressed.pdf8 Jun 2022
OtherFile: Glomore RERA Extn Appl 29-12-21.pdf29 Dec 2021
Declaration about Commencement CertificateFile: Oasis CC revalidation lettr to 2021.pdf28 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Oasis T1 form 5 signed copy.pdf6 Oct 2020
Certificates of CA (Form 5)File: Glomore form 5 Oasis T1.pdf24 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Glomore form 5 Oasis T1.pdf24 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: Part Form 4 Oasis T1.pdf9 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Oasis Part OC.pdf4 Dec 2019
Proforma of Allotment letterFile: Oasis-T1-AFS.pdf15 Nov 2019
OtherFile: Oasis Part OC.pdf2 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: Oasis Podium CC dated 18042019.pdf20 Apr 2019
Building plan approvalFile: Oasis Amended IOD dated 11th April 2019.pdf12 Apr 2019
Building Plan Approval (IOD)File: Oasis Amended IOD dated 11th April 2019.pdf12 Apr 2019
Certificates of CA (Form 5)File: glomore form 5 12-01-19 with annexure.pdf18 Jan 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: OASIS T1 SOC NAME RESERVATION.pdf10 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: Oasis Staircase Core Approval.pdf28 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: 24-04-2018_furthercc_signed_OASIS.pdf25 Apr 2018
Building plan approvalFile: 2018 pg1.pdf6 Apr 2018
Building plan approvalFile: 2018 pg2.pdf6 Apr 2018
Building plan approvalFile: 2018 pg3.pdf6 Apr 2018
Building plan approvalFile: 2018 pg4.pdf6 Apr 2018
Building plan approvalFile: 2018 pg5.pdf6 Apr 2018
Building plan approvalFile: 2018 pg6.pdf6 Apr 2018
Building plan approvalFile: 2018 pg7.pdf6 Apr 2018
Building plan approvalFile: 2018 pg8.pdf6 Apr 2018
Building plan approvalFile: 2018 pg9.pdf6 Apr 2018
Building plan approvalFile: 2018 pg10.pdf6 Apr 2018
Building plan approvalFile: 2018 pg11.pdf6 Apr 2018
Building plan approvalFile: 2018 pg12.pdf6 Apr 2018
Building plan approvalFile: 2018 pg13.pdf6 Apr 2018
Building plan approvalFile: 2018 pg14.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg1.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg2.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg3.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg4.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg5.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg6.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg7.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg8.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg9.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg10.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg11.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg12.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg13.pdf6 Apr 2018
Building Plan Approval (IOD)File: 2018 pg14.pdf6 Apr 2018
Building plan approvalFile: Oasis Amended IOD Issue Letter 2018.pdf26 Mar 2018
Building Plan Approval (IOD)File: Oasis Amended IOD Issue Letter 2018.pdf26 Mar 2018
PAN CardFile: pancard Glomore Constructions.pdf29 Jul 2017
Declaration in FORM BFile: Affidavit Cum Declaration - Oasis Tower 1.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate - Oasis - Tower 1.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA Certificate - Oasis Tower 1.pdf29 Jul 2017
OtherFile: Affidavit Cum Self Declaration - Oasis Tower 1.pdf29 Jul 2017
OtherFile: Affidavit Cum Self Declaration - Oasis Tower 2.pdf29 Jul 2017
Building plan approvalFile: Drawing_12 A.pdf26 Jul 2017
Building plan approvalFile: Drawing_10.pdf26 Jul 2017
Building plan approvalFile: Drawing_09 A.pdf26 Jul 2017
Building plan approvalFile: Drawing_07.pdf26 Jul 2017
Building plan approvalFile: Drawing_08.pdf26 Jul 2017
Building Plan Approval (IOD)File: Drawing_07.pdf26 Jul 2017
Building Plan Approval (IOD)File: Drawing_08.pdf26 Jul 2017
Building Plan Approval (IOD)File: Drawing_09 A.pdf26 Jul 2017
Building Plan Approval (IOD)File: Drawing_10.pdf26 Jul 2017
Building Plan Approval (IOD)File: Drawing_12 A.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Oasis Further CC dated 3rd April 2017.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oasis FORM-1 TOWER 1.pdf25 Jul 2017
Building plan approvalFile: Oasis Amended IOD dated 30th March 2017.pdf19 Jul 2017
Layout approvalFile: Drawing_01.pdf19 Jul 2017
Layout approvalFile: Drawing_04.pdf19 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SilverleafAkurli Road Next to Grovels Mall Kandivali East Mumbai 400101132CompletedJan 2009Jan 2009

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Oasis - Tower 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali East6,700+ in Mumbai Suburban

2 kmOasis - Tower 1Completed 135Lapsed / revoked 75Other 181Dot size: filed unitsN

Filed coordinates, straight-line distance. 391 registered projects within 2 km.

Builder: Glomore constructions

Glomore constructions has 1 registration on MahaRERA, including Oasis - Tower 1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Oasis - Tower 1 is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Oasis - Tower 1?

The registered promoter entity is Glomore constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Oasis - Tower 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Oasis - Tower 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Oasis - Tower 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Oasis - Tower 1?

The professionals named in the filing: Architect: SP Associates; Architect: Vivek bhole; Engineer: SACPL, Mr Nikhil sanghvi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Oasis - Tower 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Oasis - Tower 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Oasis - Tower 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.