ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / NYATI EVOLVE I

Completed No litigation declared Others project

NYATI EVOLVE I

By NYATI GEETA ASSOCIATES

RG-MH-13044 · RERA P52100022030 · Last updated on MahaRERA portal: 7 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2024Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Staircases, 98%
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

NYATI EVOLVE I is a Others project by NYATI GEETA ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100022030 on 25 Aug 2019. The registration is recorded completed; possession was promised by 30 Sep 2024.

At a glance

Project

  • NameNYATI EVOLVE I
  • TypeOthers
  • Location
    • SURVEY NO 66 HISSA NO 1BCTS NO 2043
    • MUNDHWA
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022030
  • ReraGenie IDRG-MH-13044

Builder

  • NameNYATI GEETA ASSOCIATES
  • Entity typeOthers
  • Named personsNYATI BUILDERS PVT LTD, GEETA ENTERPRISES
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredAug 2019PromisedSep 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2019
  • Promised completion30 Sep 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A2NA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.

A2: 94% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)90%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises78%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.87%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84%

Progress on shared amenities15

As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes40%
Street LightingYes50%
Community BuildingsYes70%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes65%
Water conservation /Rain water harvestingYes60%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes35%
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,632 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9910.0
Proposed, not sanctioned9,910 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHARADI PUNE

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShirish Dasnurkar and Associates
ArchitectSanjeev Mukund Mehta
EngineerJW Consultant LLP
Chartered AccountantChirag P. Shah & Co
Chartered AccountantVipin Gujarathi & Associates
PartnerRole in project
NYATI GEETA ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Nov 2023

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Evolve I - Form 5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Evolve I - Form 5.pdf7 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf1 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nyati Evolve Full Complition.pdf16 Nov 2023
Declaration about Commencement CertificateFile: Format D Evolve I 1st.pdf6 Nov 2023
Declaration about Commencement CertificateFile: Format D Evolve I 2nd.pdf6 Nov 2023
Certificates of CA (Form 3)File: FORM 3.pdf19 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf16 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Nyati Evolve I.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf4 Apr 2023
Certificates of CA (Form 3)File: CA Certificate 090123.pdf2 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE EVOLVE I.pdf30 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE 1 NYATI EVOLVE I.pdf30 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Nyati Evolve I.pdf21 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Nyati Evolve I.pdf19 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nyati Evolve I.pdf17 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf28 Jul 2022
OtherFile: Self Declaration.pdf21 May 2022
Layout approvalFile: Sanction Layout.pdf19 May 2022
Copy of Layout Approval (in case of layout)File: Sanction Layout.pdf19 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 May 2022
Proforma of Allotment letterFile: Evolve I AGR FOR ALL SERIES FLATS 100222 REVISED CLEAN 180522.pdf18 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf25 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf6 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nyati Evolve I.pdf18 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf12 Oct 2021
Proforma of Allotment letterFile: Unit Agreement Evolve I Flats 17102020 REVISED CLEAN 05082021.pdf6 Aug 2021
Layout approvalFile: Layout.pdf31 Jul 2021
Building plan approvalFile: Typical Floor.pdf31 Jul 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf31 Jul 2021
Building Plan Approval (IOD)File: Typical Floor.pdf31 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf31 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: A 2 Form 2A.pdf7 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf7 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf16 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf16 Oct 2020
Layout approvalFile: Sanction Layout.pdf7 Oct 2020
Layout approvalFile: Sanction Layout Model.pdf7 Oct 2020
Building plan approvalFile: A2 Bldg Ground Mezzanine.pdf7 Oct 2020
Building plan approvalFile: A2 Bldg Parking.pdf7 Oct 2020
Building plan approvalFile: A2 Bldg Typical Refuge Floor.pdf7 Oct 2020
Building plan approvalFile: A2 Bldg Section AA BB.pdf7 Oct 2020
Building plan approvalFile: A2 Bldg Elevation.pdf7 Oct 2020
Copy of Layout Approval (in case of layout)File: Sanction Layout.pdf7 Oct 2020
Copy of Layout Approval (in case of layout)File: Sanction Layout Model.pdf7 Oct 2020
Building Plan Approval (IOD)File: A2 Bldg Ground Mezzanine.pdf7 Oct 2020
Building Plan Approval (IOD)File: A2 Bldg Parking.pdf7 Oct 2020
Building Plan Approval (IOD)File: A2 Bldg Typical Refuge Floor.pdf7 Oct 2020
Building Plan Approval (IOD)File: A2 Bldg Section AA BB.pdf7 Oct 2020
Building Plan Approval (IOD)File: A2 Bldg Elevation.pdf7 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf7 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Nyati Evolve I.pdf30 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 1 Form 2A.pdf9 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf9 Jul 2020
Proforma of Allotment letterFile: Unit Agreement Evolve I Flats 16082019 REVISED 241219.pdf26 Dec 2019
Proforma of Allotment letterFile: Unit Agreement Evolve I Shops 16082019 REVISED 241219.pdf26 Dec 2019
Proforma of Allotment letterFile: Revised Unit Agreement Evolve I.pdf3 Sep 2019
Proforma of Allotment letterFile: Letter of Allotment Evolve I.pdf7 Aug 2019
Layout approvalFile: Submission Layout.pdf6 Aug 2019
PAN CardFile: Pan Card of Nyati Geeta Associates.pdf6 Aug 2019
Copy of the legal title reportFile: Title Certificate.pdf6 Aug 2019
Details of encumbrancesFile: No Encumbrance Letter - Evolve - I.pdf6 Aug 2019
Copy of Layout Approval (in case of layout)File: Submission Layout.pdf6 Aug 2019
Declaration in FORM BFile: Form B - Nyati Evolve - I.pdf6 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf3 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Evolve I.pdf3 Aug 2019
Certificates of CA (Form 3)File: CA Certificate Evolve I.pdf3 Aug 2019
Layout approvalFile: Sanction Layout Model.pdf31 Jul 2019
Building plan approvalFile: A2 Parking Fl.pdf31 Jul 2019
Building plan approvalFile: A2 Ground Fl.pdf31 Jul 2019
Building plan approvalFile: A2 Typical Fl.pdf31 Jul 2019
Building plan approvalFile: A2 Elevation Section.pdf31 Jul 2019
Building plan approvalFile: A2 Section.pdf31 Jul 2019
Copy of Layout Approval (in case of layout)File: Sanction Layout Model.pdf31 Jul 2019
Building Plan Approval (IOD)File: A2 Parking Fl.pdf31 Jul 2019
Building Plan Approval (IOD)File: A2 Ground Fl.pdf31 Jul 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NYATI EVOLVE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUNDHWA13,700+ in Pune

2 kmNYATI EVOLVE ICompleted 115Lapsed / revoked 117Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: NYATI GEETA ASSOCIATES

NYATI GEETA ASSOCIATES has 3 registrations on MahaRERA, including NYATI EVOLVE I and NYATI EVOLVE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NYATI EVOLVE I is delayed beyond 30 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI EVOLVE I?

The registered promoter entity is NYATI GEETA ASSOCIATES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI EVOLVE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NYATI EVOLVE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NYATI EVOLVE I?

The professionals named in the filing: Architect: Shirish Dasnurkar and Associates; Architect: Sanjeev Mukund Mehta; Engineer: JW Consultant LLP; Chartered Accountant: Chirag P. Shah & Co; Chartered Accountant: Vipin Gujarathi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NYATI EVOLVE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI EVOLVE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI EVOLVE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.