Home / Browse projects / NYATI ERA III
NYATI ERA III
By NYATI CONSTRUCTION PRIVATE LIMITED
RG-MH-95219 · RERA P52100047727 · Last updated on MahaRERA portal: 15 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 4 cases
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 2 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NYATI ERA III is a Residential / Group Housing project by NYATI CONSTRUCTION PRIVATE LIMITED in DHANORI, 411015, registered with MahaRERA as P52100047727 on 21 Nov 2022. Possession is promised by 30 Mar 2027. The completion date has moved by 12 months from the original filing. 260 of the 260 units on this registration are recorded sold or booked, and 26 of 55 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameNYATI ERA III
- TypeResidential / Group Housing
- Location
- DHANORI LOHEGAON ROAD
- DHANORI
- 411015
- Pincode411015
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047727
- ReraGenie IDRG-MH-95219
Builder
- NameNYATI CONSTRUCTION PRIVATE LIMITED
- Entity typeCompany
- CINU45202MH1996PTC102517
- GSTIN27AAACN6421D1ZU
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsPRANAV NITIN NYATI, NITIN DWARKADAS NYATI
- Other registrations5 more →
- Completed2 of 6
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Nov 2022
- Promised completion30 Mar 2027
- Revised completionRevised to 30 Mar 2027 (originally 31 Mar 2026)
- Buildings5 building records
- Documents filed178 files
Current status
Figures as on 15 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING-D | NA | 15 | 13 | 52 | 0 | 52 |
| WING-E | NA | 15 | 13 | 52 | 0 | 52 |
| WING-F | NA | 15 | 13 | 52 | 0 | 52 |
| WING-P | NA | 15 | 13 | 52 | 0 | 52 |
| WING-Q | NA | 15 | 13 | 52 | 0 | 52 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 15 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
26 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 100%.
WING-D97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 85% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 97% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
WING-E97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 85% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 96% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 97% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 93% |
WING-F97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 85% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 97% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 97% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
WING-P82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 85% |
| Plinth | 100% |
| Stilt Floor | 98% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 54% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 58% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 41% |
WING-Q83%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 85% |
| Plinth | 100% |
| Stilt Floor | 98% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 72% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 72% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 41% |
Progress on shared amenities15
As on 15 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed67
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING-D | 1 | 1 |
| WING-E | 17 | 17 |
| WING-F | 16 | 16 |
| WING-P | 17 | 17 |
| WING-Q | 16 | 16 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| COOJI ALIAS COOVERJI DADY KATRAK | Pune (CB) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING-E | NA | Rs 17.64 cr | Rs 17.29 cr |
| WING-P | NA | Rs 15.37 cr | Rs 12.55 cr |
| WING-Q | NA | Rs 15.37 cr | Rs 12.48 cr |
| WING-D | NA | Rs 15.10 cr | Rs 14.75 cr |
| WING-F | NA | Rs 15.10 cr | Rs 14.78 cr |
| - | NA | Rs 10.01 cr | Rs 25.03 lakh |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJEEV MUKUND MEHTA |
| Architect | SHIRISH DASNURKAR |
| Engineer | SATISH MADALE |
| Engineer | AMOL SHITOLE |
| Engineer | SANDEEP HIROLIKAR |
| Engineer | Vishwanath Dhande |
| Engineer | ACHYUT WATVE |
| Chartered Accountant | NICKY HIRANAND MILANI |
| Chartered Accountant | Vipin Gujarathi & Associates |
| Partner | Role in project |
|---|---|
| NYATI CONSTRUCTION PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have received the OC and are requesting an extension until the date of OC i.e 30/07/2026 As per discussion with MahaRERA Officer and as per the query raised, we are applying for Extension until 30/11/2026 to complete changes made via the correction application.
Reason as filed by the promoterNA
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 1046/2023 | CIVIL JUDGE SENIOR DIVISION PUNE | Ongoing |
| 721/2024 | CIVIL COURT SENIOR DIVISION | Ongoing |
| 608/2020 | CIVIL COURT SENIOR DIVISON | Ongoing |
| 1867/2024 | CIVIL COURT SENIOR DIVISION | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12604825 | Ashish Naresh Sharma | NYATI CONSTRUCTION PRIVATE LIMITED | 31/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Oct 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Mar 2027
Documents filed178
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 178 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 15 Sep 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 15 Sep 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 15 Sep 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 20 Apr 2026 |
| Form 1File: FORM 1.pdf | 30 Mar 2026 |
| Form 2File: FORM 2.pdf | 30 Mar 2026 |
| Form 3File: FORM 3.pdf | 30 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVERTORY.pdf | 30 Mar 2026 |
| Form 1File: FORM 1.pdf | 30 Mar 2026 |
| Form 2File: FORM 2.pdf | 30 Mar 2026 |
| Form 3File: FORM 3.pdf | 30 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVERTORY.pdf | 30 Mar 2026 |
| Form 1File: FORM 1.pdf | 30 Mar 2026 |
| Form 2File: FORM 2.pdf | 30 Mar 2026 |
| Form 3File: FORM 3.pdf | 30 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVERTORY.pdf | 30 Mar 2026 |
| Form 5 (FY 2022-2023)File: Nyati Era III Form 5 FY 2022 23.pdf | 28 Mar 2026 |
| Form 5 (FY 2023-2024)File: Nyati Era III Form 5 2023-2024.pdf | 28 Mar 2026 |
| Form 1File: FORM 1.pdf | 26 Mar 2026 |
| Form 2File: FORM 2.pdf | 26 Mar 2026 |
| Form 3File: FORM 3.pdf | 26 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVERTORY.pdf | 26 Mar 2026 |
| Form 1File: FORM 1.pdf | 26 Mar 2026 |
| Form 2File: FORM 2.pdf | 26 Mar 2026 |
| Form 3File: FORM 3.pdf | 26 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 26 Mar 2026 |
| Form 1File: FORM 1.pdf | 26 Mar 2026 |
| Form 2File: FORM 2.pdf | 26 Mar 2026 |
| Form 3File: FORM 3.pdf | 26 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 26 Mar 2026 |
| Form 2A (FY 2025-2026)File: Nyati Era III Form 2A.pdf | 25 Mar 2026 |
| Form 2A (FY 2023-2024)File: FORM 2A.pdf | 24 Mar 2026 |
| Form 2A (FY 2022-2023)File: Form 2A.pdf | 24 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 30 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 30 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 30 Oct 2025 |
| Layout approvalFile: Parking Layout.pdf | 6 Oct 2025 |
| Form 2A (FY 2024-2025)File: Nyati Era III Form 2A 2024-2025.pdf | 26 Sep 2025 |
| Form 5 (FY 2024-2025)File: Nyati Era-III.pdf | 4 Sep 2025 |
| Form 1File: FORM 1.pdf | 16 Jul 2025 |
| Form 2File: FORM 2.pdf | 16 Jul 2025 |
| Form 3File: FORM 3.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 16 Jul 2025 |
| Form 1File: FORM 1.pdf | 16 Jul 2025 |
| Form 2File: FORM 2.pdf | 16 Jul 2025 |
| Form 3File: FORM 3.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 16 Jul 2025 |
| Form 1File: FORM 1.pdf | 16 Jul 2025 |
| Form 2File: FORM 2.pdf | 16 Jul 2025 |
| Form 3File: FORM 3.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 16 Jul 2025 |
| Form 1File: FORM 1.pdf | 16 Jul 2025 |
| Form 2File: FORM 2.pdf | 16 Jul 2025 |
| Form 3File: FORM 3.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 16 Jul 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 16 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 16 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 Era III Signed.pdf | 16 Jul 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 Era III Signed.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 Era III Signed.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 Era III Signed.pdf | 15 Jul 2025 |
| Proforma of Agreement for saleFile: NYATI ERA III UNIT AGREEMENT REVISED 22042025 CLEAN.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 11 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 7 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 7 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 2 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 2 Apr 2025 |
| Layout approvalFile: Sanction Layout.pdf | 6 Mar 2025 |
| Building plan approvalFile: Wing P 1st To 13th Floor.pdf | 6 Mar 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 178 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NYATI ERA III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHANORI
Filed coordinates, straight-line distance. 68 registered projects within 2 km.
Kohinoor Viva Pixel- Phase II
RISING ASSOCIATES
VIVACITY
REALCON LANDMARKS LLP
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
QUE 101 PHASE I
ANNR Unique Realty LLP
NYATI ERA I
NYATI CONSTRUCTION PRIVATE LIMITED
ONE ARETHA PHASE 1
Triaa Landmarks LLP
Builder: NYATI CONSTRUCTION PRIVATE LIMITED
NYATI CONSTRUCTION PRIVATE LIMITED has 6 registrations on MahaRERA, including NYATI ERA I and NYATI ERA II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if NYATI ERA III is delayed beyond 30 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NYATI ERA III?
The registered promoter entity is NYATI CONSTRUCTION PRIVATE LIMITED, a company as per the filing. Its CIN U45202MH1996PTC102517 and GSTIN 27AAACN6421D1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NYATI ERA III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NYATI ERA III?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NYATI ERA III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NYATI ERA III?
The professionals named in the filing: Architect: SANJEEV MUKUND MEHTA; Architect: SHIRISH DASNURKAR; Engineer: SATISH MADALE; Engineer: AMOL SHITOLE; Engineer: SANDEEP HIROLIKAR; Engineer: Vishwanath Dhande. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NYATI ERA III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback