Home / Browse projects / Pune, Maharashtra / NYATI EMERALD III

Registered Litigation declared Others project

NYATI EMERALD III

By NYATI BUILDERS PRIVATE LIMITED

RG-MH-43637 · RERA P52100055066 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 8 cases
  • 1 complaint at MahaRERA
  • Rs 270.00 crore secured on the land, in favour of Tata Capital Housing Finance Limited

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2028Possession promisedno revision filed
27 of 77Construction stages doneacross 7 buildings; furthest along: Podiums (if any), 50%
127 of 290Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

NYATI EMERALD III is a Others project by NYATI BUILDERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100055066 on 26 Feb 2024. Possession is promised by 31 Aug 2028. 163 of the 290 units on this registration are recorded sold or booked, and 27 of 77 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNYATI EMERALD III
  • TypeOthers
  • Location
    • BANER
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055066
  • ReraGenie IDRG-MH-43637

Builder

  • NameNYATI BUILDERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45202MH1996PTC102620
  • GSTIN27AAACN6418N1Z4
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorsNITIN DWARKADAS NYATI, NITIN DWARKADAS NYATI
  • Other registrations20 more →
  • Completed9 of 21
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects18 →

Key dates

this monthRegisteredFeb 2024PromisedAug 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Feb 2024
  • Promised completion31 Aug 2028
  • Revised completionNone
  • Buildings7 building records
  • Documents filed127 files

Current status

56%163 of 290 units booked
20.7%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING C1NA32291160116
WING C2NA32291160116
WING C3NA10726026
WING D1NA52808
WING D2NA52808
WING D3NA52808
WING GNA21088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Podiums (if any), at 50%.

WING C148%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure24%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises4%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C249%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure28%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Sanitary Fittings within the flats / premises7%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C350%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure34%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D123%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D248%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D349%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure31%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises4%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING G0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes33%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered40
Open Space10
BuildingClosed/CoveredOpen SpaceTotal
WING C112012
WING C212012
WING C312012
WING D1101
WING D2101
WING D3101
WING G11011

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area11,688 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofTata Capital Housing Finance Limited
Secured amountRs 270.00 crore
CERSAI search filedYes
Declared on14 Jul 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI83098.87
Proposed, not sanctioned34,015 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch9/2, KALPTARU GARDENS, BOAT CLUB ROAD PUNE 411001
Estimated costRs 297.73 cr
Cost incurredRs 61.63 cr
Work done20.7%
BuildingWingEstimatedIncurred
WING D1NARs 43.77 crRs 6.83 cr
WING C1NARs 43.72 crRs 10.99 cr
WING D3NARs 43.70 crRs 11.69 cr
WING C3NARs 43.62 crRs 12.01 cr
WING D2NARs 43.20 crRs 9.30 cr
WING C2NARs 43.00 crRs 10.82 cr
-NARs 32.90 cr-
WING GNARs 3.81 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMilind Patil
ArchitectPR ASSOCIATED.
EngineerJW Consultants LLP
EngineerVishwanath Dhande
EngineerRAHUL MANE
Chartered AccountantMilani Gattani & Co.
Chartered AccountantMilani & Associates
Chartered AccountantP N Thombre & Associates
PartnerRole in project
NYATI BUILDERS PRIVATE LIMITED-

Litigation declared8

CaseCourtStatus
3464/2012Civil Judge Senior Division PuneOngoing
989/2016Civil Judge Senior Division PuneOngoing
259/2022District Judge District Court PuneOngoing
101/2023SDO Haveli PuneClosed
697/2023Bombay High CourtOngoing
3464/2012CIVIL JUDGE SENIOR DIVISION PUNEOngoing
2036/2023CIVIL JUDGE JUNIOR DIVISION PUNEOngoing
2A/666/2024SUHAS MAPARIOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600449Ram GawaliNYATI BUILDERS PRIVATE LIMITED29/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2028

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Nyati Emerald III Form 2A 2025-2026.pdf23 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Apr 2026
Form 2A (FY 2023-2024)File: FORM 2A.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf5 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3 Q3 - Final.pdf5 Feb 2026
Layout approvalFile: Sanction BP Layout.pdf5 Nov 2025
Building plan approvalFile: WING C1 ELEV SECTION C.pdf5 Nov 2025
Building plan approvalFile: WING C1 SECTION A B.pdf5 Nov 2025
Building plan approvalFile: WING C1 TYPICAL FLR PLAN.pdf5 Nov 2025
Building plan approvalFile: WING C2 ELEV SECTION C.pdf5 Nov 2025
Building plan approvalFile: WING C2 SECTION A B.pdf5 Nov 2025
Building plan approvalFile: WING C2 TYPICAL FLR PLAN.pdf5 Nov 2025
Building plan approvalFile: WING C3 ELEV SECTION C.pdf5 Nov 2025
Building plan approvalFile: WING C3 SECTION A B.pdf5 Nov 2025
Building plan approvalFile: WING C3 TYPICAL FLR PLAN.pdf5 Nov 2025
Building plan approvalFile: WING D1 ELEV SECTION C.pdf5 Nov 2025
Building plan approvalFile: WING D1 SECTION A B.pdf5 Nov 2025
Building plan approvalFile: WING D1 TYPICAL FLR PLAN.pdf5 Nov 2025
Building plan approvalFile: WING D2 ELEV SECTION CC.pdf5 Nov 2025
Building plan approvalFile: WING D2 SECTION A B.pdf5 Nov 2025
Building plan approvalFile: WING D2 TYPICAL FLR PLAN.pdf5 Nov 2025
Building plan approvalFile: WING D3 ELEV SECTION CC.pdf5 Nov 2025
Building plan approvalFile: WING D3 SECTION A B.pdf5 Nov 2025
Building plan approvalFile: WING D3 TYPICAL FLR PLAN.pdf5 Nov 2025
Building plan approvalFile: WING G GROUND MEZZANINE TERRACE FLOOR.pdf5 Nov 2025
Building plan approvalFile: GROUND PARKING PLAN.pdf5 Nov 2025
Building plan approvalFile: BASEMENT 1 PLAN.pdf5 Nov 2025
Building plan approvalFile: BASEMENT 2 PLAN.pdf5 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf29 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf29 Oct 2025
Form 2A (FY 2024-2025)File: Nyati Emerald III Form 2A 2024-2025.pdf23 Sep 2025
Form 5 (FY 2024-2025)File: Nyati Emerald III - Form 5.pdf23 Sep 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nyati Emerald III Form 3.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf2 Apr 2025
Copy of the legal title reportFile: Legal Title Report 20012025.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf15 Jan 2025
Details of encumbrances concerned to FinanceFile: Fincance Declaration Emerald III.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf8 Jan 2025
Details of encumbrances concerned to LegalFile: Fincance Declaration Emerald III.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf6 Jan 2025
Proforma of Agreement for saleFile: EMERALD III UNIT AGR 191224.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf7 Nov 2024
Layout approvalFile: BP LAYOUT.pdf28 Oct 2024
Copy of Layout Approval (in case of layout)File: BP LAYOUT.pdf28 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Oct 2024
Copy of the legal title reportFile: Legal Title Report 04102024.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Emerald III - Form 5.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.PDF17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Jul 2024
Proforma of Agreement for saleFile: EMERALD III UNIT AGR 01072024 CLEAN.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf18 May 2024
Proforma of Agreement for saleFile: EMERALD III UNIT AGR 080524.pdf9 May 2024
Proforma of Allotment letterFile: NYATI EMERALD III ALLOT LETTER 070524.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Emerald III CA Certificate.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf3 Apr 2024
Copy of the legal title reportFile: New Legal Title 14022024.pdf15 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_Search_31_01_2024_18_09_42_464.pdf1 Feb 2024
Other - TechnicalFile: AutoDCR.pdf18 Jan 2024
Layout approvalFile: Section BP Layout.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: Section BP Layout.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: PNN Disclouser.pdf8 Jan 2024

Promoter's earlier projects18

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

14 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Nyati Enchante IIIVadgaonsheri Pune50CompletedMar 2021Mar 2021
Nyati Enchante IIVadgaonsheri Pune65CompletedMar 2021Mar 2021
Nyati Evara IIUndri Pune96CompletedSep 2020Sep 2020
Nyati Enchante IVadgaonsheri Pune50CompletedSep 2020Sep 2020
Nyati Evara IUndri Pune240CompletedJun 2019Jun 2019
Nyati Meadows - B8, B9vadgaonsheri Pune76CompletedJul 2017Apr 2017
Nyati EvitaLohegaon Pune240CompletedJul 2017Oct 2016
Nyati EurekaKharadi Pune38CompletedJul 2017Apr 2017
Nyati EmporiusBaner Pune98CompletedJul 2017Mar 2017
Nyati WindchimesUndri Pune200CompletedMar 2017Jun 2016
Nyati Equatorial-IIBavdhan Bk Pune312CompletedMar 2017Late, Apr 2017
Nyati Unitree ICTS No 1995 1996B Pune nagar Road Yerwada Pune142CompletedDec 2016Oct 2015
Nyati EpitomeMohammedwadi Pune112CompletedDec 2016Oct 2016
Nyati EbonyUndri Pune188CompletedMar 2016Dec 2015
Nyati Equatorial-IBavdhan bk pune264CompletedDec 2015Late, Jul 2016
Nyati Ethos-IIUndri Pune152CompletedSep 2015Mar 2015
Nyati Ethos-IUndri Pune165CompletedDec 2014Late, Aug 2015
Nyati EsplanadeBavdhan Bk Pune253CompletedJan 2013Late, Jan 2014

How this compares with Pune

56%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NYATI EMERALD III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANER13,700+ in Pune

2 kmNYATI EMERALD IIICompleted 120Lapsed / revoked 37Other 77Dot size: filed unitsN

Filed coordinates, straight-line distance. 234 registered projects within 2 km.

Builder: NYATI BUILDERS PRIVATE LIMITED

NYATI BUILDERS PRIVATE LIMITED has 21 registrations on MahaRERA, including NYATI EVARA I and NYATI UNITREE II. Its filings disclose 18 earlier MahaRERA projects: declares 14 of 18 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NYATI EMERALD III is delayed beyond 31 Aug 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI EMERALD III?

The registered promoter entity is NYATI BUILDERS PRIVATE LIMITED, a company as per the filing. Its CIN U45202MH1996PTC102620 and GSTIN 27AAACN6418N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI EMERALD III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NYATI EMERALD III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NYATI EMERALD III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NYATI EMERALD III?

The professionals named in the filing: Architect: Milind Patil; Architect: PR ASSOCIATED.; Engineer: JW Consultants LLP; Engineer: Vishwanath Dhande; Engineer: RAHUL MANE; Chartered Accountant: Milani Gattani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NYATI EMERALD III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI EMERALD III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI EMERALD III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.