Nova Residency

By Magarpatta City Dev, Co. Pvt. Ltd.

RG-MH-05581 · RERA P52100055577 · Last updated on MahaRERA portal: 6 Apr 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 10%
147 of 196Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

Nova Residency is a Residential / Group Housing project by Magarpatta City Dev, Co. Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100055577 on 4 Apr 2024. Possession is promised by 31 Dec 2028. 49 of the 196 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameNova Residency
  • TypeResidential / Group Housing
  • Location
    • Hadapsar Mundhawa Shiv Road
    • Opp Bharat Forge
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055577
  • ReraGenie IDRG-MH-05581

Builder

  • NameMagarpatta City Dev, Co. Pvt. Ltd.
  • Entity typeCompany
  • DirectorSatish Dattatray Magar
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredApr 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Apr 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed114 files

Current status

25%49 of 196 units booked

Figures as on 6 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA282598098
BNA282598098

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 10%.

A38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes65%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed109

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots109
Closed/Covered103
Open Space6
BuildingClosed/CoveredOpen SpaceTotal
A47451
B56258

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,486 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI25692.8
Proposed, not sanctioned25,693 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch13 Sholapur Bazaar Road Off East Street Poolgate Pune 411001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAssociated Space Designers
EngineerVikas Shitole
Chartered AccountantSDB & Company
Chartered AccountantD R B S V & Associates
PartnerRole in project
Magarpatta City Dev, Co. Pvt. Ltd.-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
SM12600458Ram GawaliMagarpatta City Dev, Co. Pvt. Ltd.29/06/2026
SM12600460Ram GawaliMagarpatta City Dev, Co. Pvt. Ltd.29/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - March 2026.pdf6 Apr 2026
Form 2File: Form 2 - March 2026.pdf6 Apr 2026
Form 3File: Form 3 - March 2026.pdf6 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked inventory - March 2026.pdf6 Apr 2026
Form 2A (FY 2025-2026)File: form 2A - March 2026.pdf6 Apr 2026
Form 1File: Form 1 - Dec 2025.pdf16 Jan 2026
Form 2File: Form 2 - Dec 2025.pdf16 Jan 2026
Form 3File: Form 3 - Dec 2025.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventory - Dec 2025.pdf16 Jan 2026
Form 1File: Form 1 - Sep 2025.pdf18 Oct 2025
Form 2File: Form 2 - Sep 2025.pdf18 Oct 2025
Form 3File: Form 3 - Sep 2025.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventory - Sep 2025.pdf18 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5.pdf30 Sep 2025
Form 1File: Form 1 - March 2025.pdf19 Jul 2025
Form 2File: Form 2 - March 2025.pdf19 Jul 2025
Form 3File: Form 3 - March 2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventory - March 2025.pdf19 Jul 2025
Form 1File: Form 1 - June 2025.pdf19 Jul 2025
Form 2File: Form 2 - June 2025.pdf19 Jul 2025
Form 3File: Form 3 - June 2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory - June 2025.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2025.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 2025.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2024-2025.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 2025.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - March 2025.pdf2 Apr 2025
Building plan approvalFile: 1-14.pdf4 Feb 2025
Building plan approvalFile: 7-14.pdf4 Feb 2025
Building plan approvalFile: 8-14.pdf4 Feb 2025
Building plan approvalFile: 12-14.pdf4 Feb 2025
Building plan approvalFile: 13-14.pdf4 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf4 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-14.pdf4 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 7-14.pdf4 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 8-14.pdf4 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 12-14.pdf4 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 13-14.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jan 2025.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 - Dec 2024.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2024.pdf28 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - Dec 2024.pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Oct 2024.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2024.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jun 2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - April 2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jun 2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sep 2024.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - Jun 2024.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - September 2024.pdf18 Oct 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf2 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Agreement for Sale - Deviation Report.pdf2 Apr 2024
Copy of the legal title reportFile: Complete Flow of Title.pdf30 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: NOVA RESI_SHEET 1-14, 2-14, 3-14-Model (rev).pdf30 Mar 2024
Declaration in FORM BFile: Affidavit.pdf30 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Mar 2024
Other - LegalFile: Ashok Haribhau Pathare - Sale Deed.pdf30 Mar 2024
Other - LegalFile: Correction Deed - Ramchandra Krishnaji alias Rama Kisan Pathare.pdf30 Mar 2024
Other - LegalFile: Indrayani Haribhau Pathare - Sale Deed.pdf30 Mar 2024
Other - LegalFile: Subhadra Dattoba Pathare - Sale Deed.pdf30 Mar 2024
Other - LegalFile: Dnyanoba Dhondiba Pathare.pdf30 Mar 2024
Other - TechnicalFile: Declaration cum Undertaking.pdf30 Mar 2024
Other - TechnicalFile: Declaration for Amenity Space.pdf30 Mar 2024
Other - TechnicalFile: NOVA RESI_SHEET 1-14, 2-14, 3-14-Model (rev).pdf30 Mar 2024
Other - TechnicalFile: Format D - Declaration About Commencement Certificate.pdf30 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations Mr Umesh Magar.pdf27 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations Mr Vivek Magar.pdf27 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations Mr Yogesh Magar.pdf27 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations Mr Satish Magar.pdf27 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organizations Mr Shirish Magar.pdf27 Mar 2024
Layout approvalFile: 1-2 Amalgamation Layout.pdf26 Mar 2024
Layout approvalFile: 2-2 Amalgamation Layout.pdf26 Mar 2024
Building plan approvalFile: NA Order.pdf26 Mar 2024
Building plan approvalFile: 1-14 cc-2341_23A1.pdf26 Mar 2024
Building plan approvalFile: 2-14 cc-2341_23A0.pdf26 Mar 2024
Building plan approvalFile: 3-14 cc-2341_23A1.pdf26 Mar 2024
Building plan approvalFile: 4-14 cc-2341_23A1.pdf26 Mar 2024
Building plan approvalFile: 5-14 cc-2341_23A1.pdf26 Mar 2024
Building plan approvalFile: 6-14 cc-2341_23A1.pdf26 Mar 2024

How this compares with Pune

25%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nova Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opp Bharat Forge13,700+ in Pune

Builder: Magarpatta City Dev, Co. Pvt. Ltd.

Magarpatta City Dev, Co. Pvt. Ltd. has 2 registrations on MahaRERA, including Nova and Nova Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Nova Residency is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nova Residency?

The registered promoter entity is Magarpatta City Dev, Co. Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nova Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Nova Residency?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Nova Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nova Residency?

The professionals named in the filing: Architect: Associated Space Designers; Engineer: Vikas Shitole; Chartered Accountant: SDB & Company; Chartered Accountant: D R B S V & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nova Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nova Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nova Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.