Home / Browse projects / Nirvana Part I
Nirvana Part I
RG-MH-87431 · RERA P51900010100 · Last updated on MahaRERA portal: 12 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 3 complaints at MahaRERA
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Nirvana Part I is a Residential / Group Housing project by RUNWAL DEVELOPERS LTD in 400012, registered with MahaRERA as P51900010100 on 24 Aug 2017. Possession was promised by 30 Dec 2024 and is now 22 months past that date. The completion date has moved by 24 months from the original filing. 3 complaints are on record with the regulator.
At a glance
Project
- NameNirvana Part I
- TypeResidential / Group Housing
- Location
- G. D. Ambekar Road
- 400012
- Pincode400012
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900010100
- ReraGenie IDRG-MH-87431
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Aug 2017
- Promised completion30 Dec 2024
- Revised completionRevised to 30 Dec 2024 (originally 31 Dec 2022)
- Buildings1 building record
- Documents filed203 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Nirvana Part I | NA | 66 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
Nirvana Part I: 99% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 12 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 20% |
| Water Supply | Yes | 30% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed273
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ACCORD ESTATES PVT LTD | - | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pallavi Matkari |
| Architect | Ninad Dinkar Mhaskar |
| Engineer | Sanjay Singh |
| Chartered Accountant | S P Gunjal & Associates |
| Chartered Accountant | Singhi & Co. |
| Partner | Role in project |
|---|---|
| RUNWAL DEVELOPERS LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, have registered our project ““NIRVANA PART I” (hereinafter referred to as “the said Project) on the RERA Website bearing Registration No. 51900010100 on 24/08/2017. The “Revised Proposed Date of Completion” while registering the said Project was mentioned on RERA Website as 31/12/2022 for the completion of the project. We submit that the construction of the said Project is in progress. However, there is delay in issuing approvals from concerned authorities for further construction of the said Project and therefore, we anticipate delay for completing the construction of the said Project fro
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 129/2010 | BOMBAY CITY CIVIL COURT | PENDING |
| 3079/2013 | BOMBAY CITY CIVIL COURT | PENDING |
| 3596/2013 | BOMBAY CITY CIVIL COURT | PENDING |
| 75/2010 | SMALL CAUSES COURT AT BOMBAY | DECREED |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000141194 | Mrs. Neelam Sahebrao Satre | M/s Accord Estates (P) Limited | 10/10/2019 |
| CC006000000195166 | Hina Shah | Runwal Realty Pvt Ltd | 07/12/2020 |
| CC12500574 | Azimulla Yusuf Sayyed | RUNWAL DEVELOPERS PVT LTD | 19/02/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 13 Jan 2025
Documents filed203
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 203 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 12 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 3 Dec 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Inventory.pdf | 5 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 18 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3.pdf | 18 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 15 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2024.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 2024.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2024.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf | 20 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nirvana OC 10 01 2025.pdf | 13 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 17 Dec 2024 |
| Building plan approvalFile: Amended letter 19 08 2024.pdf | 24 Oct 2024 |
| Building plan approvalFile: Amended Plan 19 08 2024 Plans 1 to 7.pdf | 24 Oct 2024 |
| Building plan approvalFile: Amended Plan 19 08 2024 Plans 8 to 14.pdf | 24 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 2024.pdf | 24 Oct 2024 |
| Building Plan Approval (IOD)File: Amended letter 19 08 2024.pdf | 24 Oct 2024 |
| Building Plan Approval (IOD)File: Amended Plan 19 08 2024 Plans 1 to 7.pdf | 24 Oct 2024 |
| Building Plan Approval (IOD)File: Amended Plan 19 08 2024 Plans 8 to 14.pdf | 24 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 2024.pdf | 22 Oct 2024 |
| Declaration about Commencement CertificateFile: NIRVANA Part 1 Declaration about CC RDPL 30 09 2024.pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sep 2024.pdf | 21 Oct 2024 |
| Certificates of CA (Form 3)File: From 3 Spe 2024.pdf | 18 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Nirwana FullCC dated 19 09 24.pdf | 15 Oct 2024 |
| Details of encumbrancesFile: Declaration on encumbrances-Nirvana 08 08 2024.pdf | 8 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory June 2024.pdf | 23 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024.pdf | 22 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 June 2024.pdf | 22 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2024.pdf | 19 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 March 2024.pdf | 29 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 March 2024.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 2024.pdf | 19 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 March 2024.pdf | 19 Apr 2024 |
| Proforma of Agreement for saleFile: Revised Nirvana AFS 11 03 2021.pdf | 5 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 23 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 23 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 compressed.pdf | 23 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 19 Jan 2024 |
| OtherFile: self declaratio on revised area sharing 21 11 2023.pdf | 21 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 16 Nov 2023 |
| OtherFile: Self Declaration of Accord for its Flats.pdf | 6 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 30 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Nirvana 30-09-2023.pdf | 23 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nirvana 30 09 2023.pdf | 23 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 Nirvana Part I 30 Sept 2023.pdf | 20 Oct 2023 |
| Home Buyer /Allottee Grievance Redressal CellFile: Declaration Nirvana Part I.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold list of Nirvana as on 30 06 2023.pdf | 21 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ARCHITECT CERTIFICATE 30 06 2023.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nirvana as on 30 June 2023.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3 Nirvana Part 1 as on 30 06 2023.pdf | 20 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ARCHITECT CERTIFICATE 30 06 2023.pdf | 17 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Nirvana 31 03 2023.pdf | 21 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Nirvanan Part I 31 03 2023.pdf | 20 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nirvana Engineer Certificate 31 03 2023.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3 CA certificate for 31032023 Nirvana.pdf | 19 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NIRVANA_ARCHITECT CERTIFICATE_31-12-2022 Form 1.pdf | 27 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nirvana Engineers Certificate.pdf | 27 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Nirvana sold and unsold.pdf | 27 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 Nirvana.pdf | 27 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Nirvana.pdf | 17 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nirvana Sep 2022.pdf | 19 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: sold unsold Nirvana Sep 2022.pdf | 19 Oct 2022 |
| Certificates of CA (Form 3)File: Form 3 Nirvana Sep 2022.pdf | 19 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 12 10 2022.pdf | 14 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Nirvana_FurtherCC_signed.pdf | 11 Oct 2022 |
| Declaration about Commencement CertificateFile: NIRVANA Part 1_Declaration about CC_RDPL_30092022.pdf | 10 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NIRVANA_ARCHITECT CERTIFICATE_FOR RERA_30-09-2022.pdf | 10 Oct 2022 |
| CERSAI detailsFile: Nirvana Part I.pdf | 18 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cer Nirvana 30062022.pdf | 16 Jul 2022 |
| Certificates of CA (Form 3)File: Nirvana Part 1 Form 3 30 06 2022.pdf | 16 Jul 2022 |
| Declaration about Commencement CertificateFile: Nirvana CC declaration 30062022.pdf | 15 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Nirvana 30062022.pdf | 15 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Nirvana T-1 30062022.pdf | 15 Jul 2022 |
| Certificates of CA (Form 5)File: Nirvana - Form 5 - Mar 18.pdf | 1 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg Certificate - Sep-20 - Nirvana_PM.pdf | 29 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Nirvana 30062021.pdf | 21 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Nirvana 30092021.pdf | 21 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Nirvana 31122021.pdf | 21 Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 203 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Nirvana Part I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near this project
Filed coordinates, straight-line distance. 52 registered projects within 2 km.
SATTVA SUMERA
ALPERTON DEVELOPERS AND CONTRACTORS PRIVAT
THE EDGE
TEJUKAYA CORP PRIVATE LIMITED
THE PINNACLE
RATNARAJ BLESSING MILESTONE LLP
Ruparel Millennia
Renuka Realtors
Ruparel Jewel
Renuka Realtors
Ruparel NOVA
SHREE SUKHAKARTA DEVELOPERS PVT.LTD.
Builder: RUNWAL DEVELOPERS LTD
Runwal Developers Ltd has 4 registrations on MahaRERA, including RUNWAL ANTHURIUM - VALENTINE and Nirvana Part I. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.
Frequently asked questions
What does it mean that Nirvana Part I shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Nirvana Part I is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Nirvana Part I?
The registered promoter entity is RUNWAL DEVELOPERS LTD, a company as per the filing. Its CIN U70100MH1988PTC046631 and GSTIN 27AAACR0395J1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Nirvana Part I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Nirvana Part I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Nirvana Part I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Nirvana Part I?
The professionals named in the filing: Architect: Pallavi Matkari; Architect: Ninad Dinkar Mhaskar; Engineer: Sanjay Singh; Chartered Accountant: S P Gunjal & Associates; Chartered Accountant: Singhi & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Nirvana Part I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback