Home / Browse projects / Pune, Maharashtra / NIRMAN SQUARE

Completed No litigation declared Others project

NIRMAN SQUARE

By SUNGOLD DEVELOPERS

RG-MH-11681 · RERA P52100007471 · Last updated on MahaRERA portal: 9 May 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

NIRMAN SQUARE is a Others project by SUNGOLD DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100007471 on 17 Aug 2017. The registration is recorded completed; possession was promised by 28 Jun 2024. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameNIRMAN SQUARE
  • TypeOthers
  • Location
    • PUNE
    • Pune (M Corp.)
    • Pune City
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100007471
  • ReraGenie IDRG-MH-11681

Builder

  • NameSUNGOLD DEVELOPERS
  • Entity typePartnership
  • PartnersSUNIL RAMESHWAR AGRAWAL, PREMPRAKASH RAMESHWARDAS AGARWAL, RAMESHKUMAR PAWANKUMAR JAIN, SARJIT MOTIRAM AGARWAL, NEELAM RAJ AGARWAL, RAJESH JAIPRAKASH AGARWAL, SACHIIN JAIPRAKASH GOEL, ASHISH SARJIT AGARWAL, VINOD PRITAM AGARWAL, TARUN SATBIR MITTAL, VISHAL RAMNIVAS AGARWAL, RAJ RAMESHWARDAS AGARWAL and 2 more

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion28 Jun 2024
  • Revised completionRevised to 28 Jun 2024 (originally 30 Dec 2023)
  • Buildings2 building records
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHOPS AND OFFICES AND B WINGNA110000
A-WINGNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

SHOPS AND OFFICES AND B WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A-WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed118

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots118
Closed/Covered95
Open Space23
BuildingClosed/CoveredOpen SpaceTotal
SHOPS AND OFFICES AND B WING622385
A-WING33033

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,716 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6103.0
Proposed, not sanctioned6,103 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNIGDI PUNE

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectImran Shaikh
PartnerRole in project
SUNGOLD DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025887Dec 2023 → Jun 2024

Reason as filed by the promotercompletion certificate was received after proposed date of completion. Hence, we seek extension till date to enable the closing compliance with RERA.

Litigation declared2

CaseCourtStatus
102/2022Bombay High Courtorder in favour
976/2022Civil Judge Senior Division CourtOrder In favour

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Dec 2024

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B Delcaration new.pdf9 May 2025
Certificates of CA (Form 3)File: Form 3 - Sungold Developers Mar_25 New.pdf9 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Mar_25 New.pdf9 May 2025
Other - TechnicalFile: full oc sungold.pdf4 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_mar25.pdf3 May 2025
Certificates of CA (Form 3)File: Form 3 - Sungold Developers Mar_25.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_mar25.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Mar_25.pdf3 May 2025
Layout approvalFile: Scan_7251-01_compressed.pdf2 May 2025
Building plan approvalFile: Scan_7251-02_compressed.pdf2 May 2025
Building plan approvalFile: Scan_7251-04_compressed.pdf2 May 2025
Building plan approvalFile: Scan_7251-05_compressed.pdf2 May 2025
Building plan approvalFile: Scan_7251-06_compressed.pdf2 May 2025
Building plan approvalFile: Scan_7251-08_compressed.pdf2 May 2025
Building plan approvalFile: Scan_7251-10_compressed.pdf2 May 2025
Building plan approvalFile: Scan_7251-12_compressed.pdf2 May 2025
Copy of Layout Approval (in case of layout)File: Scan_7251-01_compressed.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf2 May 2025
Certificates of CA (Form 3)File: Form 3 - Sungold Developers jun 23.pdf2 May 2025
Certificates of CA (Form 3)File: Form 3 - Sungold Developers sept 23.pdf2 May 2025
Certificates of CA (Form 3)File: Form 3 - Sungold Developers Dec_23.pdf2 May 2025
Certificates of CA (Form 3)File: Form 3 - Sungold Developers mar 23.pdf2 May 2025
Certificates of CA (Form 3)File: Form 3 - Sungold Developers MAr_24.pdf2 May 2025
Certificates of CA (Form 3)File: Form 3 - Sungold Developers Jun_24.pdf2 May 2025
Certificates of CA (Form 3)File: Form 3 - Sungold Developers Dec23.pdf2 May 2025
Certificates of CA (Form 3)File: Form 3 - Sungold Developers Sep_24.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_dec24.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_sep 24.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_jun 24.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_dec23.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sept23.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 jun23.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 mar23.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_mar24.pdf2 May 2025
Commencement Certificates / NA Order for plotted developmentFile: CC final.pdf2 May 2025
Building Plan Approval (IOD)File: Scan_7251-10_compressed.pdf2 May 2025
Building Plan Approval (IOD)File: Scan_7251-12_compressed.pdf2 May 2025
Building Plan Approval (IOD)File: Scan_7251-08_compressed.pdf2 May 2025
Building Plan Approval (IOD)File: Scan_7251-06_compressed.pdf2 May 2025
Building Plan Approval (IOD)File: Scan_7251-05_compressed.pdf2 May 2025
Building Plan Approval (IOD)File: Scan_7251-04_compressed.pdf2 May 2025
Building Plan Approval (IOD)File: Scan_7251-02_compressed.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Mar_23.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory jun 23.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory sept 23.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Dec_23.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Mar_24.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Jun_24.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Sep_24.pdf2 May 2025
Declaration about Commencement CertificateFile: Format D.pdf2 May 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form - 4 (Cubix) Architect's Cetificate.pdf6 Feb 2025
Declaration in FORM BFile: stamp ( 500 ).pdf28 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 (Cubix )Architect Certificate.pdf28 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form - 4 (Cubix) Architect's Cetificate.pdf28 Dec 2024
Certificates of CA (Form 3)File: Form 3.pdf28 Dec 2024
Certificates of CA (Form 3)File: Form 3.pdf28 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2A (Year - 2019-2020 ).pdf28 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2A (Year - 2020-2021 ).pdf28 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Data.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form - 2A (Year - 2021-2022 ).pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A ( Year - 2022- 2023 ).pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A (Year - 2023 - 2024 ).pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form - 5 (Prachi Agarwal ).pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf13 Feb 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: NIRMAN SQUARE SOCIETY CERTIFICATE.pdf11 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: AUDIT REPORT - SUNGOLD.pdf2 Feb 2023
Certificates of CA (Form 3)File: FORM 3 SUNGOLD.pdf27 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sungold Developers Form 5.pdf16 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sungild Developers i.pdf15 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 07 sungold dev.pdf30 Dec 2019
Certificates of CA (Form 5)File: Sungold (1).pdf30 Sep 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIRMAN SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmNIRMAN SQUARECompleted 7Lapsed / revoked 5Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: SUNGOLD DEVELOPERS

SUNGOLD DEVELOPERS has 1 registration on MahaRERA, including NIRMAN SQUARE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NIRMAN SQUARE is delayed beyond 28 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIRMAN SQUARE?

The registered promoter entity is SUNGOLD DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIRMAN SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIRMAN SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIRMAN SQUARE?

The professionals named in the filing: Architect: Imran Shaikh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIRMAN SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIRMAN SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIRMAN SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.