Registration lapsed No litigation declared Residential / Group Housing project

Nirmal Lifestyle-Amethyst

By Nirmal Lifestyle Ltd

RG-MH-11988 · RERA P51800010841 · Last updated on MahaRERA portal: 4 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 9 complaints at MahaRERA
  • Completion date moved by 81 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
6 of 11Construction stages donefurthest along: Staircases, 99%
0 of 1Units unsoldnot recorded sold or booked
9Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

Nirmal Lifestyle-Amethyst is a Residential / Group Housing project by Nirmal Lifestyle Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010841 on 31 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 81 months from the original filing. 1 of the 1 unit on this registration is recorded sold or booked, and 6 of 11 construction stages are filed complete. 9 complaints are on record with the regulator.

At a glance

Project

  • NameNirmal Lifestyle-Amethyst
  • TypeResidential / Group Housing
  • Location
    • LBS Marg
    • LBS Road
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800010841
  • ReraGenie IDRG-MH-11988

Builder

  • NameNirmal Lifestyle Ltd
  • Entity typeCompany
  • ChairpersonDharmesh Jain
  • Other registrations6 more →
  • Completed1 of 7
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseMar 2019Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed40 files

Current status

100%1 of 1 units booked

Figures as on 4 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMETHYSTNA4130101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 99%.

AMETHYST: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises67%
Sanitary Fittings within the flats / premises22%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.4%

Progress on shared amenities15

As on 4 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed85

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots85
Closed/Covered85

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area948 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI24500.0
Proposed, not sanctioned18,658 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDevidayal road, Mulund West

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManoj V Daisaria
EngineerKamal Hadkar
Chartered AccountantJ. Acharya & Associates
PartnerRole in project
Nirmal Lifestyle Ltd-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800001548Mar 2019 → Mar 2020

Reason as filed by the promoterAs per attached application document

EXT51800009312Mar 2019 → Dec 2025

Reason as filed by the promoterWork in Progress as per consent document

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC006000000055155Kashif Raza Sayed and Zubaida SayedNirmal Lifestyle Ltd.29/06/2018
CC006000000078505ARPIT AGARWALNIRMAL LIFESTYLE LIMITED05/06/2019
CC006000000089559Prashant Namdeo BarveNirmal Lifestyle Ltd.31/05/2019
CC006000000089601VARSHA AGARWALNIRMAL LIFESTYLE LTD05/06/2019
CC006000000089602AMIT AGARWALNIRMAL LIFESTYLE LTD05/06/2019
CC006000000089603SUSHIL AGARWALNIRMAL LIFESTYLE LTD05/06/2019
CC006000000100490Harish Doulat Daryani and Harsha Doulat DaryaniNirmal Lifestyle Ltd11/08/2019
CC006000000110764Anand Narayanankutty PillaiNirmal Lifestyle Ltd31/08/2019
CC006000000141070Amethyst Cooperative Housing Society Ltd ProposedNirmal Lifestyle Ltd27/09/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3 Amethyst.pdf4 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Amethyst.pdf4 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Amethyst.pdf4 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Amethyst.pdf4 Jul 2025
CERSAI detailsFile: CERSAI_Search_Report_Amethyst.pdf4 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Amethyst.pdf4 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Amethyst.pdf4 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Amethyst.pdf4 Jul 2025
Declaration in FORM BFile: Form B Affidavit Cum Declaration.pdf19 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory_compressed.pdf17 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure in other Real estate Project DJ Annexure A.pdf17 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure in other Real estate Project RJ Annexure A.pdf17 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure in other Real estate Project RP Annexure A.pdf17 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Amethyst architects certificate_06-06-25.pdf11 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers certificate.pdf11 Jun 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certifcate.pdf11 Jun 2025
Declaration about Commencement CertificateFile: Declaration about CC Amethyst Format D.pdf11 Jun 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration For Separate Bank Account for Real Estate Projects Amethyst.pdf11 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ouality assurance certificate 2022.pdf11 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ouality assurance certificate 2023.pdf11 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ouality assurance certificate 2024.pdf11 Jun 2025
PAN CardFile: PAN Card NLL.pdf28 May 2025
Details of encumbrancesFile: Index II 27-03-2019.pdf25 Jun 2019
Certificates of CA (Form 5)File: Amethyst Form 5.pdf23 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: nll AZT CC.pdf29 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: 4830-azt-revalidation receipt.pdf29 Mar 2018
Declaration in FORM BFile: Updated Form B_Amethyst 10022018.pdf12 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate new Amethyst A.pdf31 Jul 2017
Certificates of CA (Form 3)File: Amethyst form 3 CA.pdf31 Jul 2017
Layout approvalFile: AMETHYST PROPSOED FUTURE LAYOUT Model (1).pdf30 Jul 2017
Layout approvalFile: Amethyst APPROVED.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Amethyst APPROVED.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: AMETHYST PROPSOED FUTURE LAYOUT Model (1).pdf30 Jul 2017
Proforma of Allotment letterFile: Amethyst.pdf30 Jul 2017
Building plan approvalFile: IOD- AZT.pdf29 Jul 2017
Copy of the legal title reportFile: Sanofi - Report on Title .pdf29 Jul 2017
Details of encumbrancesFile: Index_Altico_300 crores_NLL.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD- AZT.pdf29 Jul 2017
Declaration in FORM BFile: amethyst affidavit form B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amethyst - A wing.pdf29 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Relish, CherishCity of Joy Plot No 661 1 7 Jata Shanker Road Mulund W Mumbai 400080332CompletedSep 2009Late, Mar 2010
Bliss, RejoiceCity of Joy Plot No 661 1 7 Jata Shanker Road Mulund W Mumbai 400080332CompletedSep 2009Late, Mar 2010
Happiness, HurrahCity of Joy Plot No 661 1 7 Jata Shanker Road Mulund W Mumbai 400080228CompletedJun 2007Late, Dec 2007
Celebration , SparkleCity of Joy Plot No 661 1 7 Jata Shanker Road Mulund W Mumbai 400080228CompletedJun 2007Late, Dec 2007

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 81 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nirmal Lifestyle-Amethyst on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LBS Road6,700+ in Mumbai Suburban

2 kmNirmal Lifestyle-AmethysCompleted 94Lapsed / revoked 63Other 120Dot size: filed unitsN

Filed coordinates, straight-line distance. 277 registered projects within 2 km.

Builder: Nirmal Lifestyle Ltd

Nirmal Lifestyle Ltd has 7 registrations on MahaRERA, including NIRMAL LIFESTYLE, TRIUMPH AND THRILL and Nirmal Lifestyle-Zircon. Its filings disclose 10 earlier MahaRERA projects: declares 0 of 9 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Nirmal Lifestyle-Amethyst shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Nirmal Lifestyle-Amethyst is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nirmal Lifestyle-Amethyst?

The registered promoter entity is Nirmal Lifestyle Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nirmal Lifestyle-Amethyst?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Nirmal Lifestyle-Amethyst?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Nirmal Lifestyle-Amethyst?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nirmal Lifestyle-Amethyst?

The professionals named in the filing: Architect: Manoj V Daisaria; Engineer: Kamal Hadkar; Chartered Accountant: J. Acharya & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nirmal Lifestyle-Amethyst?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nirmal Lifestyle-Amethyst. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nirmal Lifestyle-Amethyst to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.