NIKITARA

By BRIJWASI BUILDERS

RG-MH-17950 · RERA P51800055857 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2029Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
66 of 70Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

NIKITARA is a Others project by BRIJWASI BUILDERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055857 on 23 Apr 2024. Possession is promised by 30 Sep 2029. 4 of the 70 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameNIKITARA
  • TypeOthers
  • Location
    • KURAR
    • MALAD WEST
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • RERA no.P51800055857
  • ReraGenie IDRG-MH-17950

Builder

  • NameBRIJWASI BUILDERS
  • Entity typePartnership
  • PartnersABHISHEK ASHOK JAIN, ASHOK DEVICHAND JAIN, JIGNA NILESH GANGAR

Key dates

this monthRegisteredApr 2024PromisedSep 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2024
  • Promised completion30 Sep 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed56 files

Current status

6%4 of 70 units booked
11.0%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA181703131
B WINGNA181739039

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A WING45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed77

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots77
Closed/Covered77
BuildingClosed/CoveredTotal
A WING3838
B WING3939

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,345 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Nov 2025
LandownerVillageDistrict
ASHOK DEVICHAND JAINGoregaonMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4283.97
Proposed, not sanctioned4,284 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHOP NO 2 AT SAI ICONIC FOUR BUNGLOWS LOKHANDWALA ROAD ANDHERI WEST MUMBAI 400053
Estimated costRs 38.06 cr
Cost incurredRs 4.19 cr
Work done11.0%
BuildingWingEstimatedIncurred
A WINGNARs 19.03 crRs 2.09 cr
B WINGNARs 19.03 crRs 2.09 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISTAR ARCHITECTS
EngineerPATEL KULKARNI CONSULTANTS
EngineerJACOB DSOUZA
Engineershivprakash tiwari
Chartered AccountantNEHALI AND CO
Chartered AccountantNEHALI DHAVAL DOSHI
Chartered Accountantjimit shah
PartnerRole in project
BRIJWASI BUILDERS-

Litigation declared6

CaseCourtStatus
TE/200112/2023/2023COURT OF SMALL CAUSES BANDRAPENDING
2013 OF 2021/2021CITY CIVIL COURT DINDOSHIPENDING
L 37990 OF 2022/2022SOLE ARBITRATORPENDING
L 37991 OF 2022/2022SOLE ARBITRATORPENDING
L 33420 OF 2023/2023HIGH COURT BOMBAYPENDING
L 33422 OF 2023/2023HIGH COURT BOMBAYPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2029

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf11 Jun 2026
Withdrawal Update Form 2File: DRAFT Form 2 Engineers Certificate MARCH 2026.pdf11 Jun 2026
Withdrawal Update Form 3File: Signed CA Certificate-NIKITARA nilesh gangar Mar 26.pdf11 Jun 2026
Form 5 (FY 2024-2025)File: Signed Form 5- Nikitara YE 31 MARCH 2025.pdf11 Jun 2026
Form 2A (FY 2024-2025)File: 1-FORM 2A- ENGINEERS CERTIFICATE YE 31 MARCH 2025.pdf14 May 2026
Withdrawal Update Form 1File: Form 1 ARCHITECT CERTIFICATE DEC 2025.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate DEC 2025.pdf19 Feb 2026
Withdrawal Update Form 3File: Signed CA Certificate-NIKITARA DEC 2025.pdf19 Feb 2026
Withdrawal Update Form 1File: Form 1 ARCHITECT CERTIFICATE SEPT 2025.pdf11 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate SEPT 2025.pdf11 Feb 2026
Withdrawal Update Form 3File: Signed CA Certificate-NIKITARA SEPT 2025.pdf11 Feb 2026
Withdrawal Update Form 1File: Form 1 ARCHITECT CERTIFICATE JUNE 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate JUNE 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Signed CA Certificate-NIKITARA JUNE 2025.pdf20 Jan 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate feb 2025_0001 (1).pdf31 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFIC.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-NIKITARA nilesh gangar June24 (1).pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-NIKITARA nilesh gangar sept24 (1).pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-NIKITARA nilesh gangar sept24 (1).pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf20 Jan 2025
Other - TechnicalFile: RERA page 50.pdf1 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATION Letter.pdf23 Mar 2024
Declaration about Commencement CertificateFile: FORM D CC DECLARATION.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate nilesh gangar.pdf21 Mar 2024
Other - LegalFile: 1-10.pdf21 Mar 2024
Other - LegalFile: 11-20.pdf21 Mar 2024
Other - LegalFile: 21-30.pdf21 Mar 2024
Other - LegalFile: 31-40.pdf21 Mar 2024
Other - LegalFile: 41-50.pdf21 Mar 2024
Other - LegalFile: 51-60.pdf21 Mar 2024
Other - LegalFile: 61-end.pdf21 Mar 2024
Other - LegalFile: LEASE DEED TRUST.pdf21 Mar 2024
Building plan approvalFile: APRROVED LETTER.pdf14 Mar 2024
Layout approvalFile: APPROVED DRG (1).pdf14 Mar 2024
PAN CardFile: BRIJWASI BUILDERS PAN CARD.PDF14 Mar 2024
Copy of the legal title reportFile: title report (12).pdf14 Mar 2024
Details of encumbrances concerned to FinanceFile: NO FINA ENCUMBRANCE.pdf14 Mar 2024
Details of encumbrances concerned to FinanceFile: ENCUMB LEGAL.pdf14 Mar 2024
Details of encumbrances concerned to LegalFile: NO FINA ENCUMBRANCE.pdf14 Mar 2024
Details of encumbrances concerned to LegalFile: ENCUMB LEGAL.pdf14 Mar 2024
Copy of Layout Approval (in case of layout)File: APPROVED DRG (1).pdf14 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: APRROVED LETTER.pdf14 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf14 Mar 2024
Declaration in FORM BFile: FORM B (25) (1).pdf14 Mar 2024
CERSAI detailsFile: CERSAI DELC.pdf14 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DOI.pdf14 Mar 2024
Proforma of Allotment letterFile: FIANL DRAFT LETTER OF ALLOTMENT.pdf14 Mar 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (17) (1).pdf14 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER.pdf14 Mar 2024
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT.pdf14 Mar 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREMENT_1-10.pdf14 Mar 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREMENT_11-end.pdf14 Mar 2024

How this compares with Mumbai Suburban

6%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIKITARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD WEST6,700+ in Mumbai Suburban

Builder: BRIJWASI BUILDERS

BRIJWASI BUILDERS has 1 registration on MahaRERA, including NIKITARA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if NIKITARA is delayed beyond 30 Sep 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIKITARA?

The registered promoter entity is BRIJWASI BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIKITARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIKITARA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIKITARA?

The professionals named in the filing: Architect: VISTAR ARCHITECTS; Engineer: PATEL KULKARNI CONSULTANTS; Engineer: JACOB DSOUZA; Engineer: shivprakash tiwari; Chartered Accountant: NEHALI AND CO; Chartered Accountant: NEHALI DHAVAL DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIKITARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIKITARA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIKITARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.