Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NIKHIL PARK is a Others project by GURUDEV DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000053866 on 8 Dec 2023. Possession is promised by 31 Dec 2026. 20 of the 70 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.
At a glance
Project
- NameNIKHIL PARK
- TypeOthers
- Location
- PASHANE
- Karjat
- Raigarh
- 410101
- Pincode410101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000053866
- ReraGenie IDRG-MH-06733
Builder
- NameGURUDEV DEVELOPERS
- Entity typePartnership
- PartnersVINODKUMAR MAVJIBHAI PATEL, RAMESHBHAI KANTILAL PATEL, SUNILKUMAR HARIBHAI PATEL, MANILAL DEVJI POKAR, PRIYANK DAMJIBHAI BHIMANI, JAYRAM PUNDALIK DHULE
- Other registrations2 more →
- No longer live1 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Dec 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed98 files
Current status
Figures as on 28 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 5 | 5 | 25 | 7 | 32 |
| WING B | NA | 5 | 5 | 38 | 0 | 38 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
WING A36%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING B36%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed104
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING A | 22 | 41 | 63 |
| WING B | 14 | 27 | 41 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| NIKHIL BHANUDAS SHELAR | Ambarnath (R) | Thane |
| BHANUDAS RAJARAM SHELAR | Ambarnath (R) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 2.30 cr | Rs 1.50 cr |
| WING B | NA | Rs 2.23 cr | Rs 1.33 cr |
| - | NA | Rs 39.00 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DIPALI B MEHER |
| Engineer | AADHAR ENGINEERS |
| Chartered Accountant | ADARSH A PATEL & CO |
| Chartered Accountant | YASH S SHAH & ASSOCIATES |
| Partner | Role in project |
|---|---|
| GURUDEV DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 May 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Sep 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed98
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architect Certificate 31032026.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer certificate 31032026.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate 31032026.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: Gurudev developers Form 1 31122025.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Gurudev developers Form 2 31122025.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: Gurudev developers Form 3 31122025.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate 30092025.pdf | 8 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate 30092025.pdf | 8 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 CA Certificate 30092025.pdf | 8 Nov 2025 |
| Form 5 (FY 2023-2024)File: Gurudev Developers Form 5 FY2324 scanned.pdf | 26 Sep 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - Gurudev Developers FY24-25 for Upload.pdf | 26 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 Gurudev developers 30062025.pdf | 28 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 Gurudev developers 30062025.pdf | 28 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 - Nikhil Park 30062025.pdf | 28 Aug 2025 |
| Form 1File: Form 1 Arc Nikhil Park 31122023.pdf | 26 Aug 2025 |
| Form 2File: Form 2 Eng Nikhil Park 31122023.pdf | 26 Aug 2025 |
| Form 3File: Form 3 CA Cert Nikhil Park 31122023.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold Inventory 31122023 .pdf | 26 Aug 2025 |
| Form 1File: Form 1 Gurudev Developer 31032024.pdf | 26 Aug 2025 |
| Form 2File: Form 2 Gurudev Developer 31032024.pdf | 26 Aug 2025 |
| Form 3File: Form 3 Gurudev Developer 31032024.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Declaration 31032024.pdf | 26 Aug 2025 |
| Form 1File: Form 1 Gurudev Developers 30062024.pdf | 26 Aug 2025 |
| Form 2File: Form 2 Gurudev developers 30062024.pdf | 26 Aug 2025 |
| Form 3File: Form 3 Gurudev developers 30062024.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30062024.pdf | 26 Aug 2025 |
| Form 1File: Form 1 Nikhil Park 30092024.pdf | 26 Aug 2025 |
| Form 2File: Form 2 Nikhil Park 30092024.pdf | 26 Aug 2025 |
| Form 3File: Form 3 Nikhil Park 30092024.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Declaration Nikhil Park 30092024.pdf | 26 Aug 2025 |
| Form 1File: 31122024 Form 1 Architect Certificate Nikhil Park.pdf | 26 Aug 2025 |
| Form 2File: 31122024 Form 2 Engineer Certificate Nikhil Park.pdf | 26 Aug 2025 |
| Form 3File: 31122024 Form 3 CA Certificate Nikhil Park.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 31122024 Sold Unsold Declaration Nikhil Park.pdf | 26 Aug 2025 |
| Form 1File: Form 1 Nikhil Park 31032025.pdf | 26 Aug 2025 |
| Form 2File: Form 2 Nikhil Park 31032025.pdf | 26 Aug 2025 |
| Form 3File: Form 3 Nikhil Park 31032025.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Declaration.pdf | 26 Aug 2025 |
| Copy of the legal title reportFile: Title Search report.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nikhil Park 31032025.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nikhil Park 31032025.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Nikhil Park 31032025.pdf | 3 May 2025 |
| Other - LegalFile: 7 12 Extract.pdf | 3 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122024 Form 1 Architect Certificate Nikhil Park.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31122024 Form 3 CA Certificate Nikhil Park.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31122024 Form 2 Engineer Certificate Nikhil Park.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 31122024 Sold Unsold Declaration Nikhil Park.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nikhil Park.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nikhil Park 30092024.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Nikhil Park 30092024.pdf | 16 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration Nikhil Park 30092024.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 30062024.pdf | 19 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 19 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 30062024.pdf | 19 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Adarsh A Patel as on 30062024.pdf | 19 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Gurudev Developers Form 5 FY2324 scanned.pdf | 27 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Gurudev Developer 31032024.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate 31032024.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration 31032024.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Adarsh A Patel as on 31032024.pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Signed Copy 31122023.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certiifcate Signed Copy .pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Inventory 31122023 .pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Signed copy 31122023.pdf | 16 Jan 2024 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf | 17 Nov 2023 |
| Other - TechnicalFile: OCCC MAIL.pdf | 16 Nov 2023 |
| Copy of the legal title reportFile: Title report uploaded in rera.pdf | 6 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Adarsh A Patel NEW.pdf | 6 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 2022.pdf | 22 Sep 2023 |
| Declaration about Commencement CertificateFile: Declaration of commencement certificate.pdf | 22 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf | 21 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal GD.pdf | 21 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf | 21 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal GD.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect certificate_organized.pdf | 21 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration in other organisations -MANILAL D POKAR.pdf | 21 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration in other organisations - PRIYANK D BHIMANI.pdf | 21 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration in other organisations - JAYRAM DHULE.pdf | 21 Sep 2023 |
| Other - LegalFile: Approved Layout_cropped.pdf | 21 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 98 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NIKHIL PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PASHANE5,900+ in Raigarh
Filed coordinates, straight-line distance. 32 registered projects within 2 km.
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Chitrapatjanak Dadasaheb Phalke Township - Pha
Anukarati Homes Pvt Ltd
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
See every Raigarh project, with the district possession charts
Builder: GURUDEV DEVELOPERS
Gurudev Developers has 3 registrations on MahaRERA, including Mystique Wonder Phase - 2 and GURUDEV ORCHID. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if NIKHIL PARK is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NIKHIL PARK?
The registered promoter entity is GURUDEV DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NIKHIL PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NIKHIL PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NIKHIL PARK?
The professionals named in the filing: Architect: DIPALI B MEHER; Engineer: AADHAR ENGINEERS; Chartered Accountant: ADARSH A PATEL & CO; Chartered Accountant: YASH S SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NIKHIL PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback