Home / Browse projects / Pune, Maharashtra / NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PHASE I

Registration lapsed No litigation declared Residential / Group Housing project

NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PHASE I

By RAVIMA DEVELOPER

RG-MH-67631 · RERA P52100048243 · Last updated on MahaRERA portal: 19 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 13 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2025Possession promised13 months past this date
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PHASE I is a Residential / Group Housing project by RAVIMA DEVELOPER in Pune, Maharashtra, registered with MahaRERA as P52100048243 on 19 Dec 2022. Possession was promised by 30 Sep 2025 and is now 13 months past that date.

At a glance

Project

  • NameNEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PHASE I
  • TypeResidential / Group Housing
  • Location
    • Survey No.71/3/2C
    • Hadapsar
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411028
  • Pincode411028
  • RERA no.P52100048243
  • ReraGenie IDRG-MH-67631

Builder

  • NameRAVIMA DEVELOPER
  • Entity typePartnership
  • PartnerSarvesh Ravindra Gadiya
  • Other registrations6 more →
  • Completed1 of 7
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

13 months past promisethis monthRegisteredDec 2022PromisedSep 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Dec 2022
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building BNA80000
Building CNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered50
BuildingClosed/CoveredTotal
Building B2525
Building C2525

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Santosh Sumant BadadeHadapsarPune
Mahendra Sumant BadadeHadapsarPune
Usha Sumant BadadeHadapsarPune
Swati Shrikant LonkarPune (M Corp.)Pune
Anita Balasaheb LokhandePune (M Corp.)Pune
Raj EngineersPune (M Corp.)Pune

Approvals and building plan

Permissible FSI5402.34
Proposed, not sanctioned4,302 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 58, 59 MAYUR COLONY KOTHRUD PUNE MAHARASHTRA 411029

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
RAVIMA DEVELOPER-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Apr 2025

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 2024-25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 2024-25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 2024-25.pdf19 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Q4 2024-25.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3-2024-25.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3-2024-25.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Q3 2024-25.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Q3-2024-25.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 2024-25.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Q2 2024-25.pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- 2023-24.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- 2023-24.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Q1 2024-25.pdf1 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Form 2A- Phase I- 2023-24.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Q1 2024-25.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 2024-25.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 2024-25.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 2023-24.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 2023-24.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Q4 2023-24.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Q4 2023-24.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 2023-24.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3- NHH 1.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3- NHH1.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Q3-NHH 1.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3-NHH 1.pdf17 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-2022-23.pdf1 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA Form 2A-Q2 2023-24.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 2023-24.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 2023-24.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 2023-24.pdf6 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Q2 2023-24.pdf6 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Q1 2023-24.pdf14 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 2023-24.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 2023-24.pdf12 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Q1 2023-24.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 2023-24.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold NHH-Q4.pdf10 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold NHH-Q1.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Q4 2022-23.pdf12 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Q4 2022-23.pdf12 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2022-23 Q4.pdf11 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf8 Apr 2023
Copy of the legal title reportFile: 1 Copy of the legal title report_page-0001 (1).pdf12 Dec 2022
Copy of the legal title reportFile: 2 Copy of the legal title report_page-0001 (2).pdf12 Dec 2022
Other - LegalFile: 1.pdf12 Dec 2022
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf4 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance for Legal.pdf4 Nov 2022
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf4 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance for Legal.pdf4 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost and Fund withdrawal.pdf4 Nov 2022
Proforma of Agreement for saleFile: draft 2.pdf4 Nov 2022
Proforma of Allotment letterFile: Allotment Letter_compressed.pdf3 Nov 2022
Details of encumbrances concerned to FinanceFile: Ravima - Declaration Encumbrances of Concerned of Finance_Compressed.pdf8 Oct 2022
Deviation Report with respect to Allotment letterFile: Ravima - Deviation Report for Allotment Letter_Compressed.pdf27 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Ravima - Deviation Report for Agreement to Sell_Compressed.pdf27 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ravima - Form 2 Engineer Certificate_Signed_Compressed.pdf23 Sep 2022
Declaration in FORM BFile: Ravima- Form B_11zon.pdf21 Sep 2022
CERSAI detailsFile: CERSAI Search Report.pdf21 Sep 2022
Layout approvalFile: Ravima - Sanction Plan_Compressed.pdf15 Sep 2022
Building plan approvalFile: Ravima - Sanction Plan_Compressed.pdf15 Sep 2022
PAN CardFile: Ravima - Pan Card.pdf15 Sep 2022
Details of encumbrances concerned to LegalFile: Ravima - Declaration Encumbrance of Concerned of Legal.pdf15 Sep 2022
Copy of Layout Approval (in case of layout)File: Ravima - Sanction Plan_Compressed.pdf15 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Ravima - Sanction Plan_Compressed.pdf15 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Ravima - Commencement Certificate.pdf15 Sep 2022
Declaration about Commencement CertificateFile: Ravima - Declaration About Commencement Certificate.pdf15 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Ravima - Declaration for Designated Bank Account Details.pdf15 Sep 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
NEWTON HOMES HADAPSAR PHASE-IP52100016522Hadapsar, Pune57May 2018CompletedApr 2023Mar 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hadapsar13,700+ in Pune

Builder: RAVIMA DEVELOPER

Ravima Developer has 7 registrations on MahaRERA, including THE WORK CLUB PHASE I and THE WORK CLUB PHASE II. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PHASE I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PHASE I is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PHASE I?

The registered promoter entity is RAVIMA DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEWTON HOMES HADAPSAR NEAR RUNWAL SEAGULL PH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.