Home / Browse projects / Pune, Maharashtra / NEW ERA

Registered Litigation declared Residential / Group Housing project

NEW ERA

By MAHALAXMI INFRAESTATE

RG-MH-33672 · RERA P52100046100 · Last updated on MahaRERA portal: 26 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Basement (if any), 90%
13 of 71Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

NEW ERA is a Residential / Group Housing project by MAHALAXMI INFRAESTATE in Pune, Maharashtra, registered with MahaRERA as P52100046100 on 20 Jun 2022. Possession is promised by 31 Dec 2026. 58 of the 71 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameNEW ERA
  • TypeResidential / Group Housing
  • Location
    • Gat No 930
    • Newale Wasti
    • Chikhali
    • Haveli
    • Pune
    • 411062
  • Pincode411062
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100046100
  • ReraGenie IDRG-MH-33672

Builder

  • NameMAHALAXMI INFRAESTATE
  • Entity typePartnership
  • PartnersMANGESH SATISH PATIL, YASHODHAN ASHOK WAGH

Key dates

this monthRegisteredJun 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed103 files

Current status

82%58 of 71 units booked
77.0%Work done, per cost certificate

Figures as on 26 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEW ERANA101062971

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

NEW ERA: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,800 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on29 Mar 2026

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI3856.92
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPune Mumbai Road Dapodi 411012
Estimated costRs 19.62 cr
Cost incurredRs 15.10 cr
Work done76.97%
BuildingWingEstimatedIncurred
NEW ERANARs 19.62 crRs 15.10 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKhire Bhide & Associates
EngineerMayur Namdeo Gaikwad
Chartered AccountantKishor Vijay Mavkar
Chartered AccountantGanesh Kankate
PartnerRole in project
MAHALAXMI INFRAESTATE-

Litigation declared1

CaseCourtStatus
6107/2023/2023District Superintendent of Land RecordsLitigation closed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: CC 16052025.pdf26 Apr 2026
Building plan approvalFile: 1 OF 7 16052025.pdf26 Apr 2026
Building plan approvalFile: 2 OF 7 16052025.pdf26 Apr 2026
Building plan approvalFile: 3 OF 7 16052025.pdf26 Apr 2026
Building plan approvalFile: 4 OF 7 16052025.pdf26 Apr 2026
Building plan approvalFile: 5 OF 7 16052025.pdf26 Apr 2026
Building plan approvalFile: 6 OF 7 16052025.pdf26 Apr 2026
Building plan approvalFile: 7 OF 7 16052025.pdf26 Apr 2026
Commencement certificateFile: CC 05022026.pdf26 Apr 2026
Building plan approvalFile: 1 -7 05022026.pdf26 Apr 2026
Building plan approvalFile: 2 -7 05022026.pdf26 Apr 2026
Building plan approvalFile: 3 -7 05022026.pdf26 Apr 2026
Building plan approvalFile: 4 - 7 05022026.pdf26 Apr 2026
Building plan approvalFile: 5 - 7 05022026.pdf26 Apr 2026
Building plan approvalFile: 6 - 7 05022026.pdf26 Apr 2026
Building plan approvalFile: 7 -7 05022026.pdf26 Apr 2026
Withdrawal Update Form 1File: FORM 1 FY 25-26 Q1.pdf26 Apr 2026
Withdrawal Update Form 1File: FORM 1 FY 25-26 Q2.pdf26 Apr 2026
Withdrawal Update Form 1File: FORM 1 FY 25-26 Q3.pdf26 Apr 2026
Withdrawal Update Form 1File: FORM 1 FY 25-26 Q3.pdf26 Apr 2026
Withdrawal Update Form 2File: FORM 2 FY 25-26 Q1.pdf26 Apr 2026
Withdrawal Update Form 2File: FORM 2 FY 25-26 Q2.pdf26 Apr 2026
Withdrawal Update Form 2File: FORM 2 FY 25-26 Q3.pdf26 Apr 2026
Withdrawal Update Form 2File: FORM 2 FY 25-26 Q3.pdf26 Apr 2026
Withdrawal Update Form 3File: FORM 3 FY 25-26 Q1.pdf26 Apr 2026
Withdrawal Update Form 3File: FORM 3 FY 25-26 Q2.pdf26 Apr 2026
Withdrawal Update Form 3File: FORM 3 FY 25-26 Q2.pdf26 Apr 2026
Withdrawal Update Form 3File: FORM 3 FY 25-26 Q3.pdf26 Apr 2026
Form 1File: FORM 1 MAHALAXMI INFRAESTATE.pdf30 Sep 2025
Form 2File: FORM 2 MAHALAXMI INFRAESTATE.pdf30 Sep 2025
Form 3File: FORM 3 MAHALAXMI INFRAESTATE.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25 Mahalaxmi Infraestate.pdf28 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahalaxmi Form 1 FY 24-25 Q3.pdf28 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mahalaxmi Form 3 FY 24-25 Q3_C.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahalaxmi Form 2 FY 24-25 Q3.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: Mahalaxmi Inventory FY 24-25 Q3.pdf28 Mar 2025
Building plan approvalFile: Scan_20241224_154838.pdf24 Dec 2024
Building plan approvalFile: Scan_20241224_154838.pdf24 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan_20241224_154838.pdf24 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan_20241224_154838.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahalaxmi Form 1 23-24 Q4.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahalaxmi Form 2 23-24 Q4.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mahalaxmi Form 3 23-24 Q4.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Mahalaxmi Inventory 23-24 Q4.pdf7 Oct 2024
Other - LegalFile: Mahalaxmi Declaration.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahalaxmi Form 1 23-24 Q4.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mahalaxmi Form 3 23-24 Q4.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahalaxmi Form 2 23-24 Q4.pdf7 Oct 2024
Other - LegalFile: Mahalaxmi Declaration.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Mahalaxmi Inventory 23-24 Q4.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - MAHALAXMI ASSOCIATES.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - MAHALAXMI ASSOCIATES.pdf6 Oct 2024
Form 5 (FY 2023-2024)File: FORM 5 - MAHALAXMI ASSOCIATES.pdf30 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf1 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2.pdf1 Apr 2024
Disclosure of sold/ booked inventoryFile: INVENTORY.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf1 Apr 2024
CERSAI detailsFile: MAHALAXMI INFRAESTATE CERSAI REPORT JAN24.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MAHALAXMI INFRA.pdf12 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MAHALAXMI INFRA.pdf12 Dec 2023
Disclosure of sold/ booked inventoryFile: INVENTORY MAHALAXMI INFRA.pdf12 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAHALAXMI INFRA.pdf12 Dec 2023
Disclosure of sold/ booked inventoryFile: Inventory Mar 2023.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR 2023_compressed.pdf26 Oct 2023
Copy of the legal title reportFile: MI SEARCH TITLE REPORT OCT 2023.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MI FORM 1 MAR 2023.pdf25 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MI FORM 2 MAR 2023.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA FORM 5 MAHALAXMI INFRAESTATE F Y 22-23.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf14 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed_compressed.pdf14 Jun 2022
Layout approvalFile: 6 Commencement Certificate.pdf13 Jun 2022
Building plan approvalFile: Approved Plan 1-5.pdf13 Jun 2022
Building plan approvalFile: Approved Plan 2-5.pdf13 Jun 2022
Building plan approvalFile: Approved Plan 3-5.pdf13 Jun 2022
Building plan approvalFile: Approved Plan 4-5.pdf13 Jun 2022
Building plan approvalFile: Approved Plan 5-5.pdf13 Jun 2022
PAN CardFile: 1 PAN of Firm.pdf13 Jun 2022
Copy of the legal title reportFile: 3 Format A Advocate Certificate.pdf13 Jun 2022
Copy of the legal title reportFile: Property Purchase Mangesh_compressed_compressed-1-9.pdf13 Jun 2022

How this compares with Pune

82%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEW ERA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chikhali13,700+ in Pune

2 kmNEW ERACompleted 66Lapsed / revoked 33Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 139 registered projects within 2 km.

Builder: MAHALAXMI INFRAESTATE

MAHALAXMI INFRAESTATE has 1 registration on MahaRERA, including NEW ERA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NEW ERA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEW ERA?

The registered promoter entity is MAHALAXMI INFRAESTATE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEW ERA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEW ERA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEW ERA?

The professionals named in the filing: Architect: Khire Bhide & Associates; Engineer: Mayur Namdeo Gaikwad; Chartered Accountant: Kishor Vijay Mavkar; Chartered Accountant: Ganesh Kankate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEW ERA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEW ERA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEW ERA to a free account