Home / Browse projects / Mumbai Suburban, Maharashtra / Nest Wing A

Registration lapsed No litigation declared Residential / Group Housing project

Nest Wing A

By SSSC Escatics Pvt. Ltd.

RG-MH-20840 · RERA P51800008831 · Last updated on MahaRERA portal: 30 Sep 2019

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 55 months past the filed date
  • 22 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2022Possession promised55 months past this date
1 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
22Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

Nest Wing A is a Residential / Group Housing project by SSSC Escatics Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008831 on 19 Aug 2017. Possession was promised by 30 Mar 2022 and is now 55 months past that date. The completion date has moved by 24 months from the original filing. 22 complaints are on record with the regulator.

At a glance

Project

  • NameNest Wing A
  • TypeResidential / Group Housing
  • Location
    • D. N. Nagar
    • Andheri West
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008831
  • ReraGenie IDRG-MH-20840

Builder

  • NameSSSC Escatics Pvt. Ltd.
  • Entity typeCompany
  • Managing DirectorVivek Jayesh Tanna
  • Other registrations2 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

55 months past promisethis monthRegisteredAug 2017First promiseMar 2020Revised toMar 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion30 Mar 2022
  • Revised completionRevised to 30 Mar 2022 (originally 31 Mar 2020)
  • Buildings1 building record
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Nest - Wing ANA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

The Nest - Wing A: 58% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)80%
Plinth80%
Stilt Floor70%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities18

As on 30 Sep 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes25%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes65%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Swimming PoolYes0%
Jogging track and children play areaYes0%
Gymnasium Indoor games Open gym and SpaYes0%

Parking filed87

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots87
Closed/Covered87

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,220 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Wadhwa Group Holdings Pvt LtdKurlaMumbai Suburban

Approvals and building plan

Permissible FSI5612.0
Proposed, not sanctioned5,612 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No -1, Heena Gaurav Heights, Opposite Shopper Stop, S V Road, Kandivali West, Mumbai 400067

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEllora Project Consultants Pvt Ltd
EngineerEllora Project Consultants
Chartered AccountantMohandas & Co
Chartered AccountantAnup B.Agrawal & Co.
PartnerRole in project
SSSC Escatics Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800005956Mar 2020 → Mar 2021

Reason as filed by the promoterI further say that, the project is a SRA project under DCR 33(10) and permission of the sale building is linked to the construction of the Rehab Building and due to some issues which arose with the SRA society the construction work of rehab building was at halt.Moreover due to the current financial crisis prevailing in the market, the generation of funds has become difficult which added fuel to fire. This has resulted in to delay in getting further construction permissions of sale building from SRA authority and construction work got delayed, however the issues with SRA society has now been re

Complaints filed with MahaRERA22

Case no.ComplainantRespondentFiled
CC006000000198452Ambrish Laxmidas Thakker and Parul Hansraj RajpopatSSSC Escatics Private Limited and Wadhwa Group Holdings Pvt. Ltd.24/09/2021
CC006000000001961Ambrish Laxmidas Thakker C/o Mr.Sudhir LingeSSSC Escatics Private Limited (Formally known as M/s.Shree Sai Sagar Consultants,Partnership firm)17/11/2017
CC006000000012501Mr. Rajnikant Kunjvihari KothiWadhwa Group Holding P. Ltd.21/12/2017
CC006000000055756SUSHIL GUPTAWADHWA GROUP HOLDINGS PVT LTD13/08/2018
CC006000000089893Bharat MehtaWadhwa Group Holdings Private Limited29/06/2019
CC006000000089895Raksha Bharat Mehta & OrsWadhwa Groups Holdings Private Limited29/06/2019
CC006000000078433Bharti Arvind ModiSSSC Escatics Pvt. Ltd.12/03/2019
CC006000000193471Mikhil InnaniWadhwa Group Holdings Pvt Ltd13/07/2020
CC006000000193939KalpeshRGadaM/s. Shree Sai Sagar Consultantas, wadhva Group Holding Pvt. Ltd.,12/09/2020
CC006000000194406SHIVKISHORE PROPERTIES & DEVELOPERS LLPSSSC ESCATICS PVT LTD10/11/2020
CC006000000194612SHIVKISHORE PROPERTIES & DEVELOPERS LLPSSSC ESCATICS PVT LTD10/11/2020
CC006000000194598Vandana BorseWadhwa Holdings Private Limited & SSSC Escatics Private Limited20/10/2020
CC006000000197938Ajithkumar KundapurSSSC ESCATICS PRIVATE LIMITED11/08/2021
CC006000000199167Seema Navin SurekaM/S. SSSC Escatics Private Limited10/01/2022
CC006000000303692Indiana Engineering Works LimitedRespondent No.1- Wadhwa Group Holdings Private Limited Respondent No. 2- SSSC Escatics Pvt Ltd15/12/2022
CC006000000333795Wadhwa Group Holdings Pvt LtdM/s SSSC Escatics Pvt Ltd29/12/2022
CC006000000395510Wadhwa Group Holdings Pvt LtdSanjay Mundra and Ors08/05/2023
CC006000000397816Variable Plaza Pvt LtdM/s SSSC Escatics Pvt. Ltd.12/10/2023
CC006000000397801Welcome Supplier Pvt LtdM/s SSSC Escatics Pvt. Ltd11/10/2023
CC006000000408122BLESSING INFRA DEVELOPERS LLPSSSC Escatics Private ltd10/11/2023
CC006000000428843RAJIV BHAGWANDAS PURSWANIShree Sai Sagar Consultants, Esscatic Consultants17/01/2024
CC006000000500619Kaushika Madhusudan RupareliaSSSC Escatics Private Limited (formerly known as M/s. Shree Sai Sagar Consultants)05/06/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 5)File: Rera Form-5 Nest A.pdf30 Sep 2019
Proforma of Allotment letterFile: Final Nest Agreement A Wing.pdf14 May 2019
Certificates of CA (Form 5)File: Nest A Wing.pdf15 Oct 2018
Details of encumbrancesFile: 180911_Encumbrance_Tower A_The Nest.pdf17 Sep 2018
Details of encumbrancesFile: Encumbrances-WingA.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrance bldg The nest.pdf31 Jul 2017
Declaration in FORM BFile: Form B Affidavit nest A.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Percentage the nest A wing.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed Engineer's Certificate_A_The Nest.pdf31 Jul 2017
Certificates of CA (Form 3)File: Nest A CA Certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: AOS Nest A wing.pdf31 Jul 2017
OtherFile: AdditionalDeclaration-TheNest-WingA.pdf31 Jul 2017
OtherFile: 1 to 20.pdf31 Jul 2017
OtherFile: 21 to 40.pdf31 Jul 2017
OtherFile: 41 to 60.pdf31 Jul 2017
OtherFile: 61 to 80.pdf31 Jul 2017
OtherFile: 81 to 105.pdf31 Jul 2017
OtherFile: 106 to 128.pdf31 Jul 2017
Building plan approvalFile: ioa.pdf25 Jul 2017
Layout approvalFile: scan-001.pdf25 Jul 2017
Layout approvalFile: scan-002.pdf25 Jul 2017
Layout approvalFile: scan-003.pdf25 Jul 2017
Layout approvalFile: scan-004.pdf25 Jul 2017
Layout approvalFile: scan-005.pdf25 Jul 2017
Layout approvalFile: scan-006.pdf25 Jul 2017
Layout approvalFile: scan-007.pdf25 Jul 2017
Layout approvalFile: scan-008.pdf25 Jul 2017
PAN CardFile: Pan Card_SSSC EPL.pdf25 Jul 2017
Copy of the legal title reportFile: Bhavans titel certificate.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: scan-001.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: scan-002.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: scan-003.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: scan-004.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: scan-005.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: scan-006.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: scan-007.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: scan-008.pdf25 Jul 2017
Building Plan Approval (IOD)File: ioa.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC Sales.pdf25 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nest Wing A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri West6,700+ in Mumbai Suburban

2 kmNest Wing ACompleted 101Lapsed / revoked 61Other 132Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: SSSC Escatics Pvt. Ltd.

SSSC Escatics Pvt. Ltd. has 3 registrations on MahaRERA, including D N Nagar Dwarka CHS Ltd. and Nest Wing A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Nest Wing A shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Nest Wing A is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nest Wing A?

The registered promoter entity is SSSC Escatics Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nest Wing A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Nest Wing A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Nest Wing A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nest Wing A?

The professionals named in the filing: Architect: Ellora Project Consultants Pvt Ltd; Engineer: Ellora Project Consultants; Chartered Accountant: Mohandas & Co; Chartered Accountant: Anup B.Agrawal & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nest Wing A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nest Wing A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nest Wing A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.